Skip to content
‹ Back to IndustriesProfessional AV

What It Takes to Resupply the International Space Station

On April 17, Virginia-based aerospace and defense company Northrop Grumman launched the Antares™ rocket along with the company’s Cygnus™ spacecraft, carrying about 7,600 pounds of cargo for the astronauts onboard NASA’s International Space Station. “Space station cargo resupply has been my favorite and most extensive program,” said aerospace engineer Jasper Nance. Nance, who works for…

This story was produced through MarketScale. See how Professional AV teams put it to work with Customer Stories & Case Studies.

·
Share
What It Takes to Resupply the International Space Station

Free workspace

Turn your Professional AV expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

On April 17, Virginia-based aerospace and defense company Northrop Grumman launched the Antares™ rocket along with the company’s Cygnus™ spacecraft, carrying about 7,600 pounds of cargo for the astronauts onboard NASA’s International Space Station.

“Space station cargo resupply has been my favorite and most extensive program,” said aerospace engineer Jasper Nance.

Nance, who works for Northrop Grumman, but does not speak for the company, has launched vehicles, CubeSats, spacecrafts and has done ground station development for radio satellites to name a few, explained how the process of launching such things into space typically goes.

The Schedule

“Spacecraft, as well as launch vehicle development is a very drawn-out process and you wouldn’t believe the amount of time you spend testing,” Nance began to describe.

Nance explained that depending on the missions, projects can take anywhere from two to 10 years before launch. There are various factors that must be taken into consideration.

“Of course, the biggest question is, will people be on board? If humans are on board, the game gets that much harder,” Nance said.

Routinely, in aerospace, there are three phases, according to Nance. The proposal, which is a generic outline of what is intended to be built. A contract detailing generic cost, time to create and complete the project is given as a response.

“Of course, since you only have a small amount of time to write the proposal, it might not actually reflect the final design exactly,” revealed Nance.

The Process

Next, the preliminary design review (PDR) takes place. During this stage, engineers finalize the design and present it to the customer with updated cost, anticipated schedule and a list of potential risks. Dependent on the client, a series of follow up reviews may take place, or the designs are given the go-ahead, allowing the team of engineers to move onto the next stage.

The critical design review (CDR), is when the designs have been locked down. Any changes must be approved by the client and usually an internal change board. All modifications must be explicated as to why it needs to happen.

“The further along in the mission you get, the more expensive changes become, both as to budget and schedule,” Nance said.

Parts like rocket engines go through a rigorous qualification test. Each part is put through excessively extreme temperatures, vibration and shock levels to show what the part can handle. Ideally if the part survives well into the extreme conditions and extended time, the better it is for all involved.

“If your rocket engine needs to fire for five minutes for a flight, maybe you fire it for 15 minutes,” said Nance, “Maybe you fire it 30 times for 15 minutes, whatever it takes to get comfortable that it will work right.”

With commercial space applications, developments (despite being very costly with time and finance) must be done at least once.

“The testing is so mission-specific though,” Nance explained. “Are you building a space telescope? A weather satellite? a communication satellite?”

Is It Ready?

Nance says the goal is sticking with a design that needs only small tweaks over time. Overall, reliability is key to any project being launched outside the earth’s atmosphere. With satellites, ideally a 10 to 20-year life span without need of touch-ups is desired. Launch vehicles are put to the test thousands of times continuously to ensure that they do not explode.

Nance cheerfully put it,

“As they say in the industry, ‘you are only as good as your last launch’. If you blow up a rocket nobody wants to be the follow-on payload.”

For the latest news, videos, and podcasts in the Science Industry, be sure to subscribe to our industry publication.

Follow us on social media for the latest updates in B2B!

Twitter – twitter.com/ScienceMKSL

Facebook – facebook.com/marketscale

LinkedIn – linkedin.com/company/marketscale

Your experts belong here

Every story in MarketScale Professional AV starts with a company putting its integrators, design engineers, and product specialists on the record. Buyers are already reading this topic. The only question is whose experts they find.

When a spec writer or facilities lead searches this category, your integrators are what they find instead of a competitor.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Professional AV, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Professional AV: are you visible to AI?

Before they reach out, Professional AV buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Professional AV expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your integrators, design engineers, and product specialists into the articles, video, and social content Professional AV buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Professional AV Insights

Clear-Com Arcadia is the intercom hub at a Łódź skills centre running Dante and NETGEAR

Clear-Com Arcadia is the intercom hub at a Łódź skills centre running Dante and NETGEAR

Clear-Com's Arcadia Central Station is the central production communications hub at Łódź's Sectoral Skills Centre for Recording and Sound Reinforcement, connecting studios, control rooms, lecture rooms and other areas. The building's infrastructure is based on NETGEAR AV Series switches and a Dante Audio-over-IP network. Students get hands-on experience with wired, wireless and IP-based intercom workflows.

  • 01The Łódź centre's network runs on NETGEAR AV Series switches with Dante audio-over-IP, which Commercial Audio's CTO said made Clear-Com an ideal fit.

Oct 6, 2026

Telefónica fits its new Madrid broadcast monitoring room with an 11.4-meter Alfalite LED wall

Telefónica fits its new Madrid broadcast monitoring room with an 11.4-meter Alfalite LED wall

Telefónica Servicios Audiovisuales has commissioned an 11.4-meter Alfalite UHD Finepix 1.2 LED wall for a new TSAmediaHUB monitoring room in Aravaca, Madrid. Servers feed it over NDI, so sources can be distributed centrally and layouts adapted to the needs of each operation.

  • 01Fed over NDI video-over-IP, Telefónica's Aravaca wall makes the arrangement of broadcast feeds a server setting that can be adapted for each operation.

Oct 3, 2026

Transcoding moves to the cloud. Intercom, tally and shading stay at the venue

Transcoding moves to the cloud. Intercom, tally and shading stay at the venue

Vendors draw the same line: transcoding and graphics move to the cloud, while intercom, tally and camera shading stay on site. Riedel says the connection back to on-site talent, cameras, tally and IFB can still undermine the production or the business case. Hybrid looks like where things settle.

  • 01Dillon’s analysis suggests hybrid cloud-plus-venue production is where things settle, making on-site hardware for latency-bound work a long-term facility plan item.
  • 02Interoperability standards such as SMPTE ST 2110 and NMOS handle the plumbing. The question to put to vendors now is how their systems provision, configure, tear down and monitor services alongside other vendors' gear.

Oct 1, 2026

Explore More Professional AV Insights

Read more expert perspectives from across Professional AV.

Browse Professional AV Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Professional AV and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512