Skip to content
‹ Back to IndustriesEngineering & Construction

PRESCO FLAGS PLAY CRITICAL ROLE IN KEEPING FOUR-LEGGED FRIENDS SAFE

Sometimes a traditional fence doesn’t work for keeping your pets in your yard. They may dig around it or even jump over it. Pet owners across the country began to use technology instead through the development of invisible fences. These fences work with collars that respond when near the outline of the wall. If the…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

·
Share
PRESCO FLAGS PLAY CRITICAL ROLE IN KEEPING FOUR-LEGGED FRIENDS SAFE

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

Sometimes a traditional fence doesn’t work for keeping your pets in your yard. They may dig around it or even jump over it. Pet owners across the country began to use technology instead through the development of invisible fences. These fences work with collars that respond when near the outline of the wall. If the warning sound is ignored, a mild electronic shock is delivered to the animal. They keep pets within boundaries and can offer them access to a pet door.

A crucial part of pet containment fence training is boundary flags. These colorful marking flags become a training tool that alerts the pet to not breach the boundary, else the collar will respond. They are critical in pet training as a visual cue. Presco marking flags are used in this application, helping pet owners and pets visualize the “fence.”

The Shift to Invisible Fencing

Compared with all other options, fenceless boundaries are less maintenance than those made of wood, vinyl, or chain. Beyond maintenance concerns, regular fences made of traditional materials don’t always do the job. The better solution is invisible fencing, which has gained popularity in the last decade. It’s even possible now for the “smart” collar, used in connection with the fence, to report data back to pet owners, including activity levels and health vitals. These types of pet fences are also cost-effective when compared to other boundary options.

Flags Critical Part of Training

Boundary flags are placed around the outline of the invisible fence to provide a visual cue for the pets. The collars activate within a few feet of the boundary flags, so they are best placed just inside the line. To find the right spots, you’ll need to remove the collar and proceed to walk toward the fence. When it beeps, and the test light tool illuminates, place a boundary flag there. Repeat this until you have flags every 10 ft. These flags, although small, play a significant role in keeping pets safe.

How We Make Our Flags

The boundary flags we manufacture have attributes that make them long-lasting. They are wind tear resistant and remain intact even in frigid weather. Presco flags are glued to the staff; not wrapped. Wrapped flags have weaknesses, often not holding up in rain or wind. You’ll be counting on those flags to continue to guide your pet while unattended, so they need to be durable. We’re glad to be part of a system that keeps four-legged friends safe.

Read more at presco.com

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

How Kaufmann fits a timber module factory into six trucks

How Kaufmann fits a timber module factory into six trucks

Kaufmann Bausysteme sets up timber module production in rented industrial halls near large projects, moving its equipment in six trucks within three weeks. The Austrian builder's rail-fed line delivers about one module an hour at up to 95% prefabrication. Kaufmann now wants to license that process abroad, charging per module.

  • 01For large timber-module runs, Kaufmann avoids long-distance shipping of finished modules by moving its production setup instead: the equipment fits in six trucks, production can start in a rented hall within three weeks, and the setup can be dismantled within a week.
  • 02The portable part is the documented process. Prescribed workstation tasks, a QR code per module and photo records at each stage let a newly trained local crew turn out the same module in a rented hall.
  • 03A per-module licence fee is the milestone to watch: Kaufmann is exploring a franchise model, and if the Montana support or New Zealand enquiries become a signed licence, its manufacturing playbook and digital system could become something other builders license and pay for per module.

Nov 28, 2026

Global I-joist market $2.6B in 2024, mass timber $990.4M

Global I-joist market $2.6B in 2024, mass timber $990.4M

RedBuilt’s November releases cite a $2.6 billion global I-joist market in 2024 and a $990.4 million global mass timber construction market in 2024, though the article notes the figures may reflect different scopes. The mass timber release highlights hybrid systems pairing timber with LVL, I-joists, open-web trusses and glulam. RedBuilt also urges teams to involve the engineered wood supplier at schematic design, when key structural choices get set.

  • 01Market figures for wood construction cover very different scopes, from $990.4 million for mass timber to a $44.2 billion timber construction forecast for 2035. Check which definition a number uses before it goes into a business case.
  • 02Wood framing can run 15-20% cheaper than steel at the shell level, but only when span, insurance and how long the owner holds the building line up. Truss and joist depth also sets ceiling heights and duct routing, so the comparison has to happen before construction documents start.

Nov 28, 2026

Only 1 in 15 Mexico data center projects clears Fibra Mty's due diligence

Only 1 in 15 Mexico hyperscale projects wins Fibra Mty sign-off

Fibra Mty reviews roughly 15 potential hyperscale data center projects in Mexico and typically signs off on one. Panelists said CFE/CENACE interconnections can take three to four years, so developers need a verifiable path to power—along with permits and water—before hyperscalers will sign build-to-suit deals.

  • 01With grid connections in Mexico taking three to four years, the power path sets a data center's calendar before construction starts, and Fibra Mty passes only about 1 in 15 hyperscale projects it reviews.
  • 02Queretaro holds 72% of Mexico's active data center megawatts; Monterrey, Saltillo, Guanajuato and Jalisco work as alternatives only where transmission capacity and environmental permits check out site by site.
  • 03A sharper BTS-bid question: with roughly 42-week waits for transformers and switchgear, are long-lead power orders aligned to the same energization date as the grid connection?

Nov 27, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512