Skip to content
‹ Back to IndustriesEngineering & Construction

Kasa’s Emulation Reduces Testing from 4 Weeks to 1

Kasa has developed a solution to enhance the efficiency of airport baggage handling systems by reducing testing time from four weeks to one week. Their Kontrol Studio upgrades the system with advanced technology ensuring secure and efficient operation. This improvement addresses common issues faced by unmanaged systems, aiming for more reliable and economical airport operations.

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Promoted content from Kasa on MarketScale.

By Kasa · · Airport Baggage Handling SystemsAirport Operations EfficiencyAirport TechnologyBaggage System Upgrade
Share
Kasa’s Emulation Reduces Testing from 4 Weeks to 1

Key takeaways

01

Kasa's Kontrol Studio reduces testing time from four weeks to one week.

02

Upgrading servers rather than frequent maintenance is more economical and efficient.

03

Kasa partners with Rockwell Automation’s Emulate3D for seamless integration.

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

Now more than ever companies are seeking ways to make their systems and processes more efficient and automated. This is especially important with the staffing shortages seen in almost every industry, and the airport operations industry is no exception.

Airport baggage handling systems (BHS) are a key factor in ensuring airlines remain on schedule and depart their planes on time. When BHS servers run unmanaged for extended periods of time, there are many issues that can arise and compromise the software, including viruses and hardware failure, which would cause costly emergency maintenance and backups due to the system not being fully operational.

Many airports request maintenance when they notice glitches; however, this is merely just a ‘bandaid’ for the problem. Instead of frequently ordering service, upgrading the server is a better option that’s more economical, efficient and secure for the long term.

How Baggage Handling Systems Work

Baggage handling systems are comprised of upper- and lower-level controls. The lower consists of the programmable logic controller where the primary function is to manage the conveyers themselves, like turning the belts on and off, tracking and managing bags, interfacing with the explosive detective system and securing the bag within a given space.

In contrast, the upper-level controls give operators a graphical view of the status of the system, manages the data processed throughout the day and compiles that data into a printable format for reporting.

Upgrading Your BHS with Kasa’s Kontrol Studio

Kasa, a controls and automation company, created Kontrol Studio to ensure BHS servers are running efficiently and securely by upgrading the upper-level system with significantly advanced graphics, services, alarm systems and reporting. Based on the newest technology to manage data efficiently, the reporting function can manage large amounts of data to create a more readable report.

With sophisticated human-machine interface software, the reporting is browser-based, and those with access can view it on their device like a webpage. Because it’s not individually licensed, operators have much more flexibility. The end result is a system that ensures bags get to the proper aircraft in the most efficient manner.

Kasa Ensures Speedy Integration for Minimal Downtime

To provide a seamless integration, Kasa partners with Rockwell Automation’s Emulate3D. The dynamic digital twin software allows Kasa to virtually test the system with the new upper-level code before even going on site, significantly cutting down the weeks dedicated to testing — a process that normally takes 2-4 weeks now only takes one.

Instead of worrying about debugging code on site, the team can focus on making minor adjustments where needed to time BHS tracking and merging perfectly. This allows the Transportation Security Administration’s (TSA) planning guidelines and design standards tests to be successfully completed virtually prior to the live integration, significantly diminishing the number of surprises on site and further reducing time to completion.

Kasa Works with the Customer in Mind

Kasa planned, tested and implemented the Kontrol Studio upgrade for the Sioux Falls Regional Airport (FSD) in South Dakota. Throughout the project, integrators worked hard to ensure the most seamless integration, asking the question, “What can we do that’s in our control to make us more successful at startup?” This mindset can be seen through the thorough testing and emulation before running the upgrade live.

Every on-site test went as expected because of this planning. First, the tests are run virtually, and then TSA and the customer are invited to witness the second round of pre-testing. TSA officials commented the emulation took much less time than anticipated and was one of the smoothest FAT [factory acceptance testing] they had ever encountered.

Additionally, Rick Milner, head of maintenance at FSD, also the process seamless: “I would like to thank everyone involved with this upgrade for making it a quick, smooth, professional transition. Plan your work, work your plan has always prevailed as a productive way of getting projects completed.”

Plan your work, work your plan…

Rick Milner, FSD Head of Maintenance

Clearly, Kasa makes upgrading your BHS server quick, painless and thoroughly planned. To learn more about Kasa and its Kontrol Studio for BHS visit www.kasacontrols.com/bhs or contact Katie Guy.

Kasa

Part of this channel

Kasa

Industrial Automation & Finishing Systems

Visit the channel

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.

About the author

K
Kasa
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

Autodesk Forma's November update lets admins assign project access through Autodesk Assistant

Autodesk Forma's November update lets admins assign project access through Autodesk Assistant

Autodesk's November Forma release includes construction updates, many of them useful to administrators running large project portfolios. Administrators can add existing hub members to multiple projects through Autodesk Assistant and push template updates to hubs that already have them. Closeout gets handover exports filtered by location.

  • 01Authorized Forma administrators can add existing hub members to multiple projects through Autodesk Assistant on manage.autodesk.com. The feature is initially available to eligible customers with projects hosted on US servers.
  • 02Forma can automatically map Revit levels and areas into the Location Breakdown Structure, and handover exports can be filtered by Location—so teams that set up Locations early may be able to reuse that structure to organize closeout packages.
  • 03Assistant's new PDF reading takes one file at a time, up to 4.5 MB, and keeps it out of the project record. Any answer the project needs on file still has to be saved there by hand.

Nov 18, 2026

About half of mechanical contractors rate BIM-to-shop links highly

About half of mechanical contractors rate BIM-to-shop links highly

Nearly all mechanical contractors that use BIM already model, and 86% have linked BIM to fabrication software. Only about half say that link works well. MSUITE's workflow guide proposes dated work packages, with need dates taken from the field's install sequence and field issues sent back to VDC tied to each package. The reason: fabrication lead times run three to six weeks, install sequences change routinely, and the shop can be the last to hear.

  • 01Nearly every mechanical contractor already models; the weak point is the wire to the shop, which 86% have installed and only about half say works well.
  • 02The next gap sits one link further down: only 35% of contractors say their BIM and fabrication links to ERP and project management systems work well.

Nov 18, 2026

Why the Ellison Institute's 80-metric-ton sun-tracking dome is built to move slowly

Why the Ellison Institute's 80-metric-ton sun-tracking dome is built to move slowly

Crews in Oxford have removed the membrane from the Ellison Institute of Technology's 20-meter observatory dome, showing an 80-metric-ton steel frame that rotates to shade the glazed timber shell. The frame could turn fully in 10 minutes but is designed for tiny sun-tracking steps. Precision is the hard part.

  • 01The Ellison dome's 80-metric-ton steel frame could spin a full circle in 10 minutes, and it is engineered to spend its days creeping after the sun in small, exact steps.
  • 02For kinetic shading, the useful questions concern positioning accuracy, repeated start-and-stop cycling, behavior in occupied rooms, and long-term noise, reliability and maintenance—not just how fast the frame can rotate.
  • 03Comfort and energy gains from the rotating shade are design intent until the building runs through full seasons, so operating data is the signal that will confirm or complicate the case.

Nov 17, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

About the Expert

K
Kasa

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512