Skip to content
‹ Back to IndustriesEngineering & Construction

Living Live: Decentralized IP and SDI Routing

On this episode of Living Live with Ross Video, host Tyler Kern was joined by Ross Video Marketing Product Manager, Connectivity & Control Todd Riggs to discuss the ins and outs of decentralized IP and SDI routing. While these aren’t new topics, a focus on IP transport topologies and a move to UHD and 4K…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

·
Share
Living Live: Decentralized IP and SDI Routing

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

On this episode of Living Live with Ross Video, host Tyler Kern was joined by Ross Video Marketing Product Manager, Connectivity & Control Todd Riggs to discuss the ins and outs of decentralized IP and SDI routing.

While these aren’t new topics, a focus on IP transport topologies and a move to UHD and 4K productions have spurred a new look.

“Both of these things are stressing some equipment that we’ve had, traditionally, so we’re having to work around some of those issues within the equipment,” Riggs said. “But there’s also some promise with some of this that’s allowing us to explore different workflows.”

In the past, the way to build a large-scale router involved leveraging combiners, tie lines and more that could facilitate those bigger infrastructures.

As technological advancements were made, these large-scale routers shrunk down to a single chassis. However, even these infrastructures didn’t have the bandwidth required for today’s applications.

Now, with decentralized IP, unprecedented distributed models are able to be scaled to sizes that weren’t possible in the past.

However, there is no one-size-fits-all solution, even for a frontier this promising.

“In fact, I would probably say that, for the majority of customers, a decentralized model probably doesn’t make sense,” Riggs said. “(That’s) simply because I don’t know people that have unlimited budgets, and cost is a factor. These models tend to be a bit more expensive up front just because of the way you build these out.”

Still, these decentralized models are helping shift workflows by providing scalability and ways to link multiple sites together in a much more efficient manner than single-frame models.

For the latest news, videos, and podcasts in the Pro AV Industry, be sure to subscribe to our industry publication.

Follow us on social media for the latest updates in B2B!

Twitter – @MarketScale

Facebook – facebook.com/marketscale

LinkedIn – linkedin.com/company/marketscale

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

Which Trimble Connect AI tools contractors can actually use today

Which Trimble Connect AI tools contractors can actually use today

Six of the 10 AI capabilities Trimble listed at Dimensions, including scheduling and invoice matching, are available now. Change order drafting from the Document Crunch acquisition is still in development, and WorksManager Drone reaches dealers in January 2027. Plan pilots by ship date.

  • 01Six of the 10 AI capabilities Trimble listed at Dimensions are available today; contract-risk change order drafting, the feature closest to a general contractor's margin, is still in development.
  • 02Standardized AI safety labels on every current Connect agent give procurement and risk teams a document to ask any construction AI vendor for.

Nov 15, 2026

Lilly breaks ground on $3.5B Pennsylvania injectables plant whose first named drug is still in trials

Lilly breaks ground on $3.5B Pennsylvania injectables plant whose first named drug is still in trials

Eli Lilly broke ground on a $3.5 billion injectable-medicines manufacturing facility in Fogelsville, Pennsylvania, expected to be operational by 2031. The site is intended to add capacity for next-generation obesity medicines, including retatrutide, which Lilly is studying in several Phase 3 clinical trials. Lilly says the facility will use machine learning, AI and digitally integrated systems, and the site head describes the goal as a fully automated process from receiving materials through the warehouse.

  • 01Lilly cited scale figures that highlight the data burden in its process: more than 5,000 documented steps per production run and imaging and inspection of every pen more than 70 times before it ships.
  • 02Watch whether Lehigh Valley reuses the designs from Lilly's other injectable sites in Kenosha, Concord and Research Triangle Park, since a standardized network means equipment and systems choices proven at one site could repeat at the next.

Nov 14, 2026

Why Momentive says city data centers need sealant built for 1,000-foot towers

Why Momentive says city data centers need sealant built for 1,000-foot towers

Planners are pushing urban data centers toward glass facades. Bull argues high-load structural silicone glazing—like the 30 psi UltraGlaze SSG4600 used on Austin’s 1,025-foot Waterline tower—can help support heavier security glass and tighter enclosure performance in new multi-story builds.

  • 01When a city insists a data center look like an office building, the sealant holding the glass ends up doing work for the cooling plant.
  • 02UL 752 Level 7 glazing protection is indicated at about 1.6 inches thick; ensuring security glass weight and facade joint capacity align is critical.
  • 03The supertall-sealant case applies mainly to new urban builds; most operating U.S. data centers can't shut down for facade replacement and harden their glass through retrofit shields instead.

Nov 13, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512