Why Momentive says city data centers need sealant built for 1,000-foot towers

Planners are pushing urban data centers toward glass facades. Bull argues high-load structural silicone glazing—like the 30 psi UltraGlaze SSG4600 used on Austin’s 1,025-foot Waterline tower—can help support heavier security glass and tighter enclosure performance in new multi-story builds.

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

By MarketScale Newsroom · Momentive Performance MaterialsStructural Silicone GlazingData Center ConstructionCurtain Wall
Share
Why Momentive says city data centers need sealant built for 1,000-foot towers

Key takeaways

01

When a city insists a data center look like an office building, the sealant holding the glass ends up doing work for the cooling plant.

02

Rifle-rated UL 752 Level 7 glazing runs about 15 pounds per square foot, so the security rating and the sealant's 30 psi design strength belong in the same specification review.

03

The supertall-sealant case applies mainly to new urban builds; most operating U.S. data centers can't shut down for facade replacement and harden their glass through retrofit shields instead.

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

Waterline, a 74-story supertall tower in Austin, rises 1,025 feet and is the tallest building in Texas. UltraGlaze SSG4600 Structural Glazing Sealant, which provides 30 psi tensile design strength, was selected for its glass facade. Momentive, which makes that sealant, says the same high-load capability is now essential on a building that looks nothing like a luxury supertall: the urban data center.

The argument comes from Errol Bull, an application development leader at Momentive Performance Materials, in a piece glassonweb.com published on November 9, 2026. Building Enclosure ran a version of the article on October 28. Bull starts with location. He writes that proximity to end users and the demand for ultra-low latency have pushed infrastructure into city centers, with up to 97% of facilities now developed in or near metropolitan areas.

Cities change the brief. Expensive land forces developers to build up, and Bull says planning boards routinely turn down multi-story windowless concrete boxes in favor of glass-fronted designs that fit the streetscape. Swap concrete for ordinary windows, though, and the building risks weaker physical security, more solar heat gain, heavier HVAC loads and a worse Power Usage Effectiveness (PUE) rating. That leaves one practical question for the developer and the facilities lead who will run the site: what holds the glass, and what does that choice do to the server hall?

A glass coat around a concrete core

The glass doesn't go everywhere. In Bull's description, server halls stay heavily shielded from direct sun, while expansive glazing covers administrative offices, perimeter circulation zones and technical workstations. The people-facing parts of the building get daylight. The equipment stays in the dark.

In a conventional curtain wall, every pane is held in place by exterior pressure plates, bulky metal caps and exposed fasteners. According to Bull, those parts block sightlines, collect dirt and debris, and spoil the smooth, flush look that city planners favor. Structural silicone glazing (SSG) does away with the external retainers. The glass is bonded directly to an aluminum subframe, which leaves the exterior flush.

For a design team, that layout changes where the hard engineering sits. The glazed zones are mostly perimeter space, but they wrap the secure core, so the curtain wall has to meet a mission-critical building's standard for security and airtightness even where no servers sit behind it.

Heavy security glass on a thin bead

Glass is rigid. Building frames are not; they deflect under wind, shift with temperature and drift in seismic events. Mechanical fixings pin the glass at points and concentrate stress at its edges. A continuous elastomeric silicone bond spreads those loads along the whole joint and passes them into the subframe, working, as Bull puts it, as a built-in shock absorber.

High-load sealants were engineered for supertall towers facing high-altitude wind shear, severe thermal cycling and seismic drift. Momentive's Waterline case study shows the product class in use: UltraGlaze SSG4600, which provides 30 psi tensile design strength, high tear resistance and durable elasticity, was selected for the expansive glass facade of the 1.25-million-square-foot development designed by Kohn Pedersen Fox. Win-Con was the glazing contractor. Bull argues the same strength lets facade engineers specify much heavier multi-laminate security, acoustic and thermal glass on a data center while keeping joints narrow.

That weight is the part a security director will recognize. An October 5 guide from Impact Security, which makes the DefenseLite retrofit systems, calls glass the single weakest point in a data center's building envelope. UL 752 ballistic levels range from Level 1, 9mm handgun protection at roughly 1.2 inches thick, to Level 7, AR-15 rifle rounds at about 1.6 inches and 15 pounds per square foot.

What the bond has to carry

30 psi
Tensile design strength of the supertall-grade structural silicone Momentive proposes for urban data centers
About 1.2 in
Approximate thickness of UL 752 Level 1 glazing, rated against a 9mm handgun
About 1.6 in
Approximate thickness of UL 752 Level 7 glazing, rated against AR-15 rifle rounds
15 lb/sq ft
Approximate weight of Level 7 glazing, the load a facade joint must manage at the top of the rating scale

Momentive Performance Materials; Impact Security

Put the two sources together and the procurement link is plain, even though neither states it outright: the higher the security rating chosen for street-facing glass, the more the structural joint has to carry. A security spec and a sealant spec written by separate teams could easily end up with nobody checking that the two match.

Where the facade meets the cooling plant

Bull's second argument concerns humidity. A server hall's cooling and humidity strategy, he writes, is only as good as the enclosure around it. A continuous silicone seal limits air infiltration and thermal bridging through the glazed envelope, keeping unconditioned outside air and moisture out. That helps the HVAC system prevent condensation on hardware, lightens the load on the cooling plant and protects the tight relative humidity limits server halls run within.

When a city insists a data center look like an office building, the bead of silicone holding the glass ends up doing work for the cooling plant. Impact Security's guide makes a parallel point from the glass side: for data centers, even modest reductions in peak cooling demand translate directly into lower operating costs and improved power usage effectiveness.

Why the chemistry matters: acrylic and polyurethane sealants are built on carbon-to-carbon polymer chains that UV light breaks down over time, leading to shrinking, hardening and cracking. Silicone's backbone is silicon-oxygen, the same bond found in glass and quartz, and Momentive says that bond is stronger than the energy natural UV light delivers.

Durability is the claim that matters over a building's life. Bull cites a 40-year outdoor weathering study measuring hardness, resilience, flexibility and adhesion, in which silicone sealants consistently outperformed acrylic and polyurethane alternatives and kept their structural integrity and flexibility without cracking or chalking. Neither version of his article identifies the study. For project teams, that suggests verification should come from their own testing rather than the trade article.

Moving the bonding indoors

Schedule is the third argument. Stick-built glazing is put together and sealed on site, which makes it slow and labor-heavy, and cold temperatures, rain and high humidity can all hold it up. Bull says fabricators can use fast-cure one- and two-part silicones with adjustable work patterns to bond and cure unitized panels inside a climate-controlled facility, then send the finished units out for installation. He writes that today's SSG sealants reach primerless adhesion rates as high as 96% on hard-to-bond substrates such as ceramic frits, fluoropolymer coatings and anodized aluminum. In the Building Enclosure version, Bull adds that assembling panels off site lowers on-site labor risk and reduces the need for extensive scaffolding.

For a developer racing to bring AI or cloud capacity online, removing the weather from the facade critical path is the most bankable part of the pitch. In Momentive's Waterline case study, primerless adhesion, rapid strength build-up and a flexible working time helped support Win-Con's installation across the tower's extensive facade system.

The case has a clear boundary. Impact Security notes that most U.S. data centers in operation are existing buildings where shutting down for a facade replacement isn't feasible, and those sites usually harden glass with shields mounted over existing panes. Bull's argument is for new multi-story urban builds. Facade choice also isn't the only route to coordinating the envelope: Saint-Gobain, for one, markets fire-rated glazing, panelized walls and insulation for data centers as a single integrated package meant to reduce handoffs between trades.

Three checks before the shop drawings

For an operator whose next site sits under a planning board that wants glass, a few questions are worth putting to the facade engineer and glazing contractor early:

  1. What forced-entry or ballistic rating has security chosen for the street-facing glass, and has the structural joint been designed for that unit's weight?
  2. Which glass coatings and frame finishes are on this project, and has adhesion been tested on those exact substrates? Momentive's own case study advises customers to rely on their own evaluation rather than reported results.
  3. Where glazing forms part of a fire separation near server or electrical rooms, who owns the interface between the curtain wall and the fire-rated assembly?

The sealant line in a curtain wall package rarely crosses a mechanical engineer's or security director's desk. On a glass-fronted city data center, it touches both of their jobs, so it should get their review before the shop drawings are approved.

Featured companies

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.

About the author

MarketScale Newsroom
MarketScale NewsroomEditorial Team, MarketScale

The MarketScale Newsroom reports on the companies, technologies, and trends shaping 16 B2B industries. It turns primary sources and expert commentary into clear, useful coverage for the people doing the work.

B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

IndexBox sees panelized buildings growing 5.3% a year if panel plants keep up

IndexBox sees panelized buildings growing 5.3% a year if panel plants keep up

IndexBox forecasts the global panelized buildings market to grow 5.3% a year from 2026 to 2035, with residential housing at about 45% of 2026 demand. Factory capacity is the catch. Limited mass timber and specialized steel framing capacity will hold growth back in some regions, and IndexBox expects investment in new plants and automation to ease those bottlenecks by the late 2020s.

  • 01Panels swap scarce framing crews for factory hours, and through the late 2020s the factory hours for mass timber and specialized steel framing are scarce too.
  • 02Housing is 45% of panelized demand, but commercial and institutional projects are expected to grow faster because owners are paying for schedule certainty; warehouse and campus owners are closest to that shift.
  • 03Mid-scale volumetric modular plants are estimated to need 60% to 70% utilization to break even; panel lines use different equipment, but the report argues the same fixed-cost logic can make order-book visibility important before adding shifts or lines.

Nov 11, 2026

Requests for Paebbl's carbon-storing cement substitute far outstrip what it can produce

Requests for Paebbl's carbon-storing cement substitute far outstrip what it can produce

Rebond 300 replaces up to 30% of cement in concrete with no equipment changes. In a Holcim and Goldbeck floor slab trial at C30/37, its workability, setting time and finishing matched the reference mix. Demand exceeds what Paebbl can produce, and closing that gap is now its main challenge.

  • 01After Rebond 300 runs through a standard ready-mix plant and hits C30/37 with no schedule change, buyers’ next questions shift to supply and allocation—how many tonnes Paebbl can ship—alongside price and how much of the mix to commit.
  • 02If Rebond 300 displaces up to 30% of cement yet can cut embodied carbon by up to 40%, the figures imply a negative footprint beyond simple substitution; Paebbl cites a verified -149 kg CO2e per tonne of product, with results depending on mix design.

Nov 11, 2026

ABC's Hensel Phelps Diverge partnership puts field tests ahead of vendor demos

ABC's Hensel Phelps Diverge partnership puts field tests ahead of vendor demos

Carolinas contractors need field-tested evidence on new tools now. ABC's Construction Backlog Indicator reached 8.7 months in September, yet more than a quarter of contractors expect thinner margins.

  • 01A contractor with 8.7 months of work booked has time to pilot new tools. A contractor expecting thinner margins has less room to pay for a tool that only worked in the demo.
  • 02Diverge tests construction tools in controlled pilots and on active jobsites, and ABC can pass along what holds up. Contractors still need to choose what to pilot and define the metric that will decide it.
  • 03In South Carolina, a 1099 specialist brought in to run a tech pilot faces two separate state classification tests. Passing one does not settle the other.

Nov 10, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

About the Expert

MarketScale Newsroom
MarketScale Newsroom

Editorial Team

MarketScale

The MarketScale Newsroom reports on the companies, technologies, and trends shaping 16 B2B industries. It turns primary sources and expert commentary into clear, useful coverage for the people doing the work.

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512