Skip to content
‹ Back to IndustriesEngineering & Construction

Listen: Getting Wired, High-Def and Interactive at the Smithsonian with Jason Barak of D3 LED

One interesting characteristic that most historic buildings have in common: not a lot of electrical outlets, generally speaking. That makes introducing modern technology into these spaces, especially ones as revered and iconic as the Smithsonian… a challenge; even then, the electrical requirements are just a small part of the project. On today’s podcast, our…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

·
Share
Listen: Getting Wired, High-Def and Interactive at the Smithsonian with Jason Barak of D3 LED

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

One interesting characteristic that most historic buildings have in common: not a lot of electrical outlets, generally speaking. That makes introducing modern technology into these spaces, especially ones as revered and iconic as the Smithsonian… a challenge; even then, the electrical requirements are just a small part of the project.

On today’s podcast, our host spoke with the Executive Vice President of Business Development for D3 LED, Jason Barak. They discussed the recent project D3 completed for the Smithsonian, called “The Gateway,” diving in to some of the challenges associated with implementing a new concept in an older edifice, how several early ideas didn’t make it off of the drawing board, and the moment that a visitor first experienced the final product. “It’s just one of the most unique user experiences I’ve ever seen,” Barak said.

Sean Heath: Today, I have the pleasure of having a conversation with my close personal friend, Jason Barak. He’s the Executive Vice-President of Business Development for D3 LED. Jason, my friend, how are you today?

Jason Barak: Hi. I’m doing great, Sean. Thanks for having me today.

SH: Hey, I have to say I’m thrilled I get a chance to talk to you because the last time we spoke, we didn’t have an opportunity to talk about a project you got to work on with the Smithsonian.

JB: It’s one of those projects that I could talk about for days. Literally, it just has so many interesting aspects of it, and the story of how it came together is just amazing.

SH: Well, let’s do sort of like a debrief or a postmortem, okay? Let’s start off with what was the challenge or what was the, I don’t want to say problem, but what was the opportunity that the Smithsonian was trying to address? Let’s start just on the first page. What was going on?

JB: So it actually started with the Smithsonian Channel who wanted to have a presence, a larger presence at the Smithsonian. And in the Visitors Center, which is in the Castle Building, they wanted to do something unique, something to really pull people in as they’re entering the Smithsonian for the first time and learning about what’s going on there.

Our partner, Potion Design, brought us in as they had this concept of putting together this interactive touch table with a giant LED wall, and it’s called “The Gateway”. Now, this building was built in 1849. So it had a lot of unique architecture and different aspects of it that needed our attention. So it was pretty cool how it came together working with the folks there at the Smithsonian, the Smithsonian Channel Team, and then also the folks over at Potion.

SH: Now, not a lot of wall outlets in a building built in the 1800s. So let’s leave the power supply challenge out of this because I’m really interested in the artistic approach that you took and just the sheer mechanical challenges that you had. How did that project turn into a project for D3? It seems like it would have been a natural progression, but what was the process?

JB: Yeah. So that’s a really good question, Sean, because with something like this, you are looking at so many different aspects of a project. It’s kind of what we term a D3 is, fit, form, and function. First, you look at the environment, an environment that’s already built from 1849. How do you fit the technology in there? And then form, what are you going to do, just grow something up against the wall or is it going to integrate a little bit with the architecture? Is it going to be LED, LCD? What’s it going to be? And then the function of it, not only what does it function, but how does it function.

So those three key areas were explored by both D3 and Potion putting together a feasibility study, and then some conceptual decks for both the channel and the institution to look at. So we were able to get through that process and finally got to a point where they decided that they wanted a large screen above this entryway, but then had these legs on either side that kind of came down so that people’s eyes could really focus on all aspects of the screen. It could really tell a very big story.

For the latest news, videos, and podcasts in the Pro AV Industry, be sure to subscribe to our industry publication.

Follow us on social media for the latest updates in B2B!

Twitter – @ProAVMKSL

Facebook – facebook.com/marketscale

LinkedIn – linkedin.com/company/marketscale

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

Element’s Charlotte lab makes tensile specimens from turbine blade roots

Element’s Charlotte lab makes tensile specimens from turbine blade roots

Element Materials Technology’s Charlotte lab wire-EDMs one-eighth-inch cylinders from the root of a turbine blade and low-stress grinds them into tensile specimens—work value stream manager Daniel Steele says he’s not aware other labs do at this size. The lab, which invested $3.2 million in 2019 according to Aerospace Manufacturing and Design, is adding creep and stress rupture frames under a lease signed in January.

  • 01The extraction know-how has a paper trail: Aerospace Manufacturing and Design reported in March 2019 that Element’s $3.2 million Charlotte investment included EDM plunge machines—and that Charlotte was the first Element lab to install them for extracting cylindrical specimen blanks.
  • 02Deloitte's November 2025 outlook put manufacturing construction spending down 7% year over year by July 2025, so a lab adding floor space and creep frames is growing inside one of the few pockets Deloitte flagged for expansion.

Sep 30, 2026

NMHC survey: 37% raised pricing on projects on hold

NMHC survey: 37% raised pricing on projects on hold

NMHC's September construction survey found 37% of respondents repriced shelved projects upward, versus 17% in June. Starts slowed too: 29% of firms started fewer projects, and a growing share saw labor and material costs outrun inflation.

  • 01Upward repricing of projects held three to six months rose from 17% of survey respondents in June to 37% in September, while downward repricing fell from 38% to 14%.

Sep 28, 2026

CMHA’s 2026 report estimates paver and wall production

CMHA’s 2026 report estimates paver and wall production

CMHA's 2026 Hardscape Production Report combines confidential survey data from 41 manufacturers with broader industry estimates to track segmental concrete pavement and retaining wall production in the US and Canada.

  • 01CMHA surveyed 26 pavement and 38 segmental retaining wall (SRW) producers, with many making both products, combining confidential data with broader industry estimates.
  • 02NALP forecasts mild to moderate 2026 growth with regional variation, as inflation pressures consumers and landscapers struggle to hire qualified crews and maintain margins.
  • 03Manufacturers expect future product innovation around sustainability, stormwater management, design flexibility, and installation efficiency.

Sep 28, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512