Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

KEEP THE SURFACE OF YOUR ICE RINK READY WITH CONDENSATION SOLUTIONS

There’s no doubt that ice rinks must maintain a smooth surface, otherwise skating would be treacherous. If condensation is an issue, this is no easy task. The temperature elements of ice rinks are complex. It’s not just about keeping the ice frozen. Rather the ice has to offer the best performance, but condensation is a…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share
KEEP THE SURFACE OF YOUR ICE RINK READY WITH CONDENSATION SOLUTIONS

There’s no doubt that ice rinks must maintain a smooth surface, otherwise skating would be treacherous. If condensation is an issue, this is no easy task. The temperature elements of ice rinks are complex. It’s not just about keeping the ice frozen. Rather the ice has to offer the best performance, but condensation is a saboteur ice quality.

To eliminate condensation, a continuous flow of dry air is blown over the ice sheet. This prevents condensation from developing on the ice and surrounding surfaces. To achieve these ideal conditions, Polygon delivers climate control solutions for ice rinks, preventing condensation and improving the quality of the ice rink.

Condensation Impacts Ice Surfaces

Even though ice rinks maintain the much-needed temperatures to keep the floor frozen. As temperatures rise outside, high humidity and dew points compromise the ice. The culprit condensation becomes a problem for ice arenas because of the drips.

Most ice arena buildings have metal roofs and fiberglass insulation with a plastic liner. As humidity rises, water begins to drip from the ceiling. These drips then freeze on the surface, creating bumps and build-up. Then facility managers have to continually work to get the surface even so that it’s viable for skating. Condensation is a significant problem for ice rinks, and without the proper dehumidifying equipment, instead of skating on thin ice, it will be too thick.

With the need to stay open year-round, the industry needs an answer to condensation challenges. That answer is a desiccant dehumidifier.

How Desiccant Dehumidifiers Work

A desiccant dehumidifier does the job of preserving the ice surface by keeping dry and holding temperatures below the ambient dew point. These dehumidifiers apply dry air to the arena above the ice sheet. This action drives moisture out and keeps the dew point low, reducing the chance of condensation.

To determine the specific equipment needed for each rink, Polygon measures the arena and ice sheet. With this information, we deliver our best recommendation of the number or size of dehumidifiers.

Polygon’s Desiccant Dehumidifiers Are Ideal for Ice Rinks

Our equipment keeps the surface dry and operational with the right balance of air sailing across the top of the ice. Our solution keeps arenas in business year-round, with the quality of ice at optimum no matter the weather outside. Our engineers ensure the optimum dew point is maintained throughout the ice sheet areas. Then condensation is no longer an issue. Not only does it take care of condensation, but it also inhibits fog. It also helps protect the equipment needed to maintain the ice surface and the structure from corrosion. It’s a simple concept, but one that keeps these structures operating as they should and reduces the overall cost for ongoing maintenance, previously caused by condensation. Learn more about Polygon solves humidity problems for ice rinks by reading our case study.

Read more at polygongroup.com

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one expert. Imagine publishing your whole team.

This article was produced through MarketScale. Create a free workspace and turn your own team's expertise into articles, video, and social posts. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

AI moves from back office to job site in construction's next build-out

AI moves from back office to job site in construction's next build-out

McCarthy Building Companies has entered a multimillion-dollar agreement with Palantir to enhance AI adoption. However, RICS experts highlight that data readiness and organizational culture pose significant challenges. This development signals a shift in integrating AI within construction sectors.

  • 01McCarthy Building Cos. signs a major deal with Palantir.
  • 02Data readiness is a critical hurdle for AI integration.
  • 03Organizational culture impacts AI adoption in construction.

Jul 11, 2026

South Korea commits $7.5 billion to AI-autonomous manufacturing as smart factory count hits 30,000

South Korea commits $7.5 billion to AI-autonomous manufacturing as smart factory count hits 30,000

South Korea is investing $7.5 billion in advancing AI-autonomous manufacturing, with a significant increase in smart factories, now totaling 30,000. The initiative also targets the development of 100 AI manufacturing zones throughout the country.

  • 01South Korea invests $7.5 billion in AI-autonomous manufacturing.
  • 02There are currently 30,000 smart factories in South Korea.
  • 03The government aims to develop 100 AI manufacturing zones.

Jul 11, 2026

Construction's productivity crisis: why ML cost forecasting and off-site methods are converging

Construction's productivity crisis: why ML cost forecasting and off-site methods are converging

U.S. construction productivity has decreased since 1968. Machine learning models and off-site construction methods are becoming pivotal in bridging this productivity gap by providing accurate cost forecasting and efficient building practices.

  • 01U.S. construction productivity has been declining since 1968.
  • 02Machine learning models offer enhanced cost forecasting capabilities.
  • 03Off-site construction methods contribute to improved project efficiency.

Jul 10, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512