How To Prepare Your Cooling Towers for Winter

With the cooler months upon us, it is important to prepare your cooling towers for freezing temperatures. Even in extremely icy conditions, cooling towers can be operated successfully if proper precautions and protocols are followed. A frozen cooling tower is a major issue for business operations as well as from a cost standpoint. Now is…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share

Get featured

Want to get featured in MarketScale Engineering & Construction?

Create a free MarketScale workspace and get your company's expertise featured across our Engineering & Construction coverage. No credit card, no demo required.

Start free

With the cooler months upon us, it is important to prepare your cooling towers for freezing temperatures. Even in extremely icy conditions, cooling towers can be operated successfully if proper precautions and protocols are followed. A frozen cooling tower is a major issue for business operations as well as from a cost standpoint. Now is the time to prepare for winter weather.

Winter Cooling Tower Problems

As with any outdoor equipment, ice can form and collect on cooling towers if the conditions are right. This ice can form and even be exacerbated by the operation of the cooling tower itself.

The location of ice formation on the cooling tower is important to understand. Ice at the air inlet and on the fans can lead to major operational issues and extensive damage, whereas ice on the structure may be less of an immediate concern.

Cooling tower fans are delicate and cannot operate optimally when obstructed. Ice formation poses as major threat to the fans in terms of equipment damage and loss of functionality. The expansion of water as it freezes, and shear weight of the building ice can deform the fans. Even after the ice is removed, the effectiveness of the fans can be greatly diminished. Also, as fans freeze up, the efficiency of the cooling tower declines rapidly which can halt operations completely if left untreated.

Ice formation on the structure may not pose an immediate threat to the performance of the cooling tower, but it should not be overlooked. The building of ice can add tremendous weight and stress to the cooling tower supports and cause costly damage. Also, ice can dislodge from the cooling tower structure, resulting in a falling brick of ice that can damage equipment and put personnel at risk.

Regardless of where ice formation is observed, actions should be taken to remedy the ice situation and implement preventative measures.

Operating a Cooling Tower In Winter

There are many different methods to successfully operating a cooling tower in winter conditions. These can vary depending on the location, operation, and other specifics of the equipment itself. Even so, there are some common themes to help make winter cooling tower operations go smooth.

  • Conduct Regular Inspections – This should be done year-round to ensure equipment is in good order and functioning properly. Increase the frequency of inspections during freezing conditions to identify ice formation before it becomes a major problem.
  • Begin Cold Weather Operations Proactively – Don’t wait until the outside air temperature hits freezing to implement your cold weather protocol. It is much easier (and less costly!) to prevent the formation of ice rather than be reactive to ice that is already present.
  • Maintain Heat Load – Ensure there is a constant heat load on the cooling tower during cold weather to prevent ice from forming
  • Sustain Flow Rates – Low flow rates increase the likelihood of freezing. Maintain flow rates above the design minimum to help prevent the cooling tower from freezing.
  • Manage Airflow – Control flow rate of air in each individual cooling tower cell to keep temperatures above freezing. Differences in airflow between cells can create localized freezing.
  • Do Not Manually Remove Ice – Ice buildup on the cooling tower should be allowed to melt off in order to prevent damage to equipment that could occur during ice removal. Furthermore, falling ice can occur when removing ice from a cooling tower and this is a significant personal safety hazard.
  • Consult Manufacturer Guidelines – Check the manufacturer recommendations for cold weather instructions to ensure operational aspects of the specific cooling tower are not overlooked.

Winter temperatures pose a serious threat to cooling towers, but these risks can be mitigated with a proactive and proper approach to cold weather management. As a global leader in custom programs for boilers, cooling, and process water systems, Chem-Aqua knows what it takes to keep integral process systems running strong even when being exposed to extreme conditions.

Click here to learn more about Chem-Aqua and our commitment to service.

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Get your team featuredSee how it works15 minutes, straight to a calendar.

Follow Engineering & Construction Insights

Get new expert content in your inbox.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free plan

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale workspace, up to 10 people
One professional video edit a month for qualifying companies
Media requests to your crowd, remote recording, AI writing tools
$0, no credit card, nothing that expires

More Engineering & Construction Insights

Packaging robots can beat labor long term on cost, PMMI argues

Packaging robots can beat labor long term on cost, PMMI argues

PMMI's Tom Egan wrote in Processing Magazine that adding packaging automation and robotics can now be justified as more cost-effective over the long term than the high cost of labor in food, beverage and CPG plants. Separately, Packaging World describes AI-enabled AMRs from ABB and Agilox that automate material movement between packaging stations. The remaining gap is adoption among smaller manufacturers.

  • 01Two reference points for infrastructure-light material movement: ABB's Flexley Mover P603 carries 1,500 kg with sub-centimeter positioning and no floor markers, and Agilox's OFL lifts 800 kg pallets on peer-to-peer fleet software with no central traffic controller, per Packaging World.
  • 02The open ground is small and mid-sized manufacturers: MTC's Mike Wilson counts tens of thousands of UK SMEs with no robotic automation at all and expects cobots to take most of that growth.
  • 03A robotics business case should include procurement, not only line labor: a June 2026 China Journal of Accounting Research study found heavy robot adopters spread buying across more suppliers, gaining resilience but losing inventory efficiency and adding transaction costs.

Sep 18, 2026

Xtellio brings telematics to jobsite tools and heaters

Xtellio brings telematics to jobsite tools and heaters

Xtellio launched a two-tier telematics platform in March 2026: 32 battery-powered Xense sensors for small tools and wired Pro-Xentral devices for excavators, light towers and heaters. The company claims a 10-year battery life. Data is delivered through open APIs, which Xtellio frames as customer ownership of the data, aimed at rental and construction fleets where small assets have gone largely untracked.

  • 01Xtellio’s stated 10-year battery life for its Bluetooth Xense sensors is the key spec to test in the field; if it holds up, tagging hundreds of tools can look like a one-time install rather than a recurring battery-maintenance program.
  • 02For rental houses and contractors running mixed fleets, the sharper question is no longer which machines have telematics but whether the heaters, light towers and hand tools do, and whether that data lands in the same system.
  • 03Open APIs and “data liberation” are part of Xtellio’s pitch, and the coverage frames that as a prompt for RFP questions: what the APIs expose, where data can be sent, and whether customers can take historical data if they switch providers.

Sep 18, 2026

Senate bill would double smart water grants to $50 million a year

Senate bill would double smart water grants to $50 million a year

S. 2388, the Water Infrastructure Modernization Act of 2025, would double an EPA water tech pilot to $50 million a year through 2028. Grants would cover design, construction, training and operations for leak detection, advanced metering and AI analytics, WaterWorld reported. Planning and maintenance stay on the utility's tab.

  • 01Under S. 2388 as WaterWorld describes it, feasibility studies are not grant-eligible, so a utility would have to pay to build the case for a smart water project before applying for help building the project itself.
  • 02The bill's eligible list puts advanced digital design and construction management tools in the same bucket as meters and sensors, which would give a utility's capital delivery team a claim on the same grant as its field operations group.
  • 03The existing pilot program's authorization runs through 2026, per WaterWorld; the bill would extend it to 2028, and its last reported status was 'introduced' as of Aug. 12, 2025.

Sep 17, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512