Skip to content
‹ Back to IndustriesIndustrial IoT

A3's final mobile robot safety standard is written for the sites running the robots

ANSI/A3 R15.08-3-2026 is now available from A3. It completes the three-part R15.08 series for industrial mobile robot (IMR) safety. Part 3 is written for the sites that run the robots. It covers risk assessment, management of change, employee training and periodic reviews and inspections, so safety work continues in day-to-day operation after deployment.

This story was produced through MarketScale. See how Industrial IoT teams put it to work with AI Visibility (GEO).

By MarketScale Newsroom · · Association for Advancing AutomationA3AnsiR15.08
Share
Listen to the audio brief

Key facts, context, and what it means.

AUDIO
0:00—
A3's final mobile robot safety standard is written for the sites running the robots

Key takeaways

01

The robot maker documents the environment a mobile robot was built for, and Part 3 makes the operating site responsible for managing changes to the environment the robot actually works in.

02

Part 1 was reaffirmed in 2026 with no technical changes, while Part 3 spells out what users must do to operate IMR applications safely.

03

Sites running fixed cells and mobile robots may use one safety program, because R15.08-3 was written alongside R15.06 Part 3.

Free workspace

Turn your Industrial IoT expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

A3 has completed its three-part R15.08 safety standard series for industrial mobile robots. The final piece is written for the people who run the robots every day.

ANSI/A3 R15.08-3-2026, formally titled Part 3: Use of IMR Applications, completes the three-part R15.08 series. A3 announced on September 29 that it was available, though the store listing gives a publication date of April 23, 2026. A3 says Part 3 deals specifically with the responsibilities of users operating mobile robot applications in the workplace.

It addresses risk assessment, the handling of change, training for employees, and inspections and reviews done at regular intervals. Its requirements and guidance aim to hold risk at an acceptable level in day-to-day operations and over the full lifecycle of the machinery.

The question for a site is what it owns once the integrator's commissioning work is finished.

A robot whose surroundings keep changing

ANSI's blog post on Part 1 opens with a busy distribution center, where people, forklifts, equipment and inventory are always on the move. An industrial mobile robot (IMR) adds one more moving element to that floor while it handles material, supports assembly, tows and lifts loads, runs quality checks or removes waste.

That is the difference from a traditional industrial robot, which ANSI says typically works within a defined, stationary workspace. An IMR moves through the facility and interacts with changing surroundings. So its risk picture can shift even when nobody touches the robot. That helps explain why the series needed a third document aimed at the people who control those surroundings day to day.

Builder, integrator, then the site

How long the series took, and what the last piece costs

2020
Part 1, the manufacturer's requirements, first published; reaffirmed in 2026 with no technical changes
2023
Part 2 published, covering integration into specific applications and fleets
$165
List price of the Part 3 PDF in A3's store, before member discounts
77 pages
Length of Part 3, the user-side document

ANSI; A3 Store

The vocabulary shifts as the series moves downstream, and that shift tells you where the work goes. Part 1 is built around the specified operating environment (SOE), which the ANSI post says the manufacturer documents. Part 1 describes the basic hazards of IMRs in an industrial environment in Clause 3.12 and sets requirements to eliminate those risks or reduce them enough.

Part 2 covers IMRs adapted for particular applications and deployed in a particular operating environment. It also covers groups of IMRs working as one system, which the standard calls an industrial mobile robot fleet (IMRF). ANSI describes Part 3 as setting out user responsibilities for safe operation in the specific operating environment, and A3's store listing says it emphasizes management of change of both the IMR application and the current operating environment (COE).

That suggests a mobile robot's safety case starts with what the builder wrote down, and that keeping it valid is a continuing job on the floor. Part 1 points the same way. It calls risk assessment an iterative process and requires key "information for use" to be passed to the system integrator and ultimately the end user. Part 3 is where that information arrives, and where the iterations become the site's job.

Three acronyms track the handoff. The SOE, or specified operating environment, is what the manufacturer documents under Part 1. The IMRF is Part 2's term for IMRs operating together as a system, and the COE, or current operating environment, is what Part 3's management of change covers alongside the IMR application.

The manufacturer's side has stayed put. The ANSI post says the 2026 edition of Part 1 is a reaffirmation with no technical differences from the 2020 text. Its name changed from ANSI/RIA to ANSI/A3 only because the Robotic Industries Association is now called A3. With Part 1 unchanged and Part 3 aimed at users, the newest work in the series could fall mostly on the sites that run the robots.

ANSI says the three parts together set up a safety framework running from robot design through integration and operation. A3 also sells Parts 1, 2 and 3 as a bundle. For a site that only ever saw the integrator's paperwork, that bundle could be a practical way to read the manufacturer and integration documents its own obligations build on.

What the site's safety program has to hold

According to A3's store listing, Part 3 emphasizes safe use, treats risk assessment as central, and covers personnel safety over the full lifecycle of the machinery. Two of its topics stand out because a commissioning checklist can't finish them: management of change and periodic reviews and inspections. Each is something a site keeps doing, and doesn't simply sign off once.

A3's own outline of the series makes the same point in one word. Part 1 covers the robot, Part 2 covers systems and applications, and Part 3 covers the "continued use" of IMR applications in day-to-day operations. That word marks the point where safety stops being an event at deployment and becomes a running process.

Part 3 also has a twin. According to A3, it was written in tandem with the third part of the ANSI/A3 R15.06 standard for industrial robot safety, so users receive consistent direction on operating robot systems safely, fixed or mobile. Some facilities run caged or collaborative arms in cells and mobile robots in the aisles. For them, the paired documents suggest a single safety program could handle both, rather than two separate programs built on different logic.

When reviewing a mobile robot deployment against Part 3, ask which site changes your current process actually sends back to risk assessment. Part 3's management-of-change scope covers the operating environment as well as the robot application itself.

Who the series is written for

The series defines "industrial" broadly. The ANSI post on Part 1 says the term covers the production of goods and related services. It lists manufacturing, laboratory, pharmaceutical, warehousing, distribution and logistics sites, plus other workplaces not usually thought of as strictly industrial.

That boundary could be the main limit on the reading above. ANSI says Part 1's guidance is aimed mainly at industrial environments that are structured or semi-structured, where the people who work with the robots have been trained. For a site where untrained people regularly share space with the fleet, Part 3 could be a starting point and not a full answer. The training requirement in Part 3 suggests the same thing from the other side: the user's obligations appear to assume trained people work around the robots.

The standards body's own membership spans that chain. A3 says its members represent more than 1,500 organizations, among them end users and system integrators, manufacturers and component suppliers, plus consulting firms, research groups and academic institutions. The organization that wrote Part 1 for builders also counts Part 3's audience among its members.

The user side is also growing. The ANSI post cites Packaging World figures: in 2025, mobile robots accounted for 32% of robotics revenue in the U.S. packaging and processing industry, and that share is projected to reach 45% by 2031. In that sector, more of the robot budget is going to machines that move through shared space. That is the kind of operation where changes to the surrounding environment, which Part 3 asks users to manage, are part of daily work.

Next dates on A3's calendar

A3's upcoming events include the International Robot Safety Conference in Detroit, November 3 to 5, 2026. The A3 Business Forum follows in Orlando on January 18 to 20, 2027, and the Automate show in Las Vegas on May 10 to 13, 2027.

For sites with mobile fleets already running, the practical step is to compare the current inspection and change-review routine against a 77-page document that now spells out what the user owns.

Featured companies

Your experts belong here

Every story in MarketScale Industrial IoT starts with a company putting its controls engineers, plant-floor specialists, and integration partners on the record. Buyers are already reading this topic. The only question is whose experts they find.

Plant and controls buyers research deep before contact, and your engineers get to shape that research.

Book DemoSee how it works15 minutes, straight to a calendar.

About the author

MarketScale Newsroom
MarketScale NewsroomEditorial Team, MarketScale

The MarketScale Newsroom reports on the companies, technologies, and trends shaping 16 B2B industries. It turns primary sources and expert commentary into clear, useful coverage for the people doing the work.

B2B Weekly

The week in Industrial IoT, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Industrial IoT: are you visible to AI?

Before they reach out, Industrial IoT buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Industrial IoT expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your controls engineers, plant-floor specialists, and integration partners into the articles, video, and social content Industrial IoT buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Industrial IoT Insights

Schneider Electric and AWS aim to cut the gateways between plant control and AI

Schneider Electric and AWS target fewer gateways between control and AI

Schneider Electric unveiled an AWS integration for EcoStruxure Automation Expert at SPS 2026 in Nuremberg. Function blocks on the plant floor can apply AI built with Amazon Bedrock and SageMaker while aiming to reduce gateways and custom interfaces. The design is intended to make it easier to reuse and deploy proven AI applications across machines and sites.

  • 01A sharper question for industrial AI projects: how many gateways, protocol converters and custom interfaces sit between the controller and the model—and which layers can be reduced or reused?
  • 02Deterministic control and time-critical processing stay on the plant floor, which lets plants adopt the architecture one machine or one site at a time without replacing existing control systems.

Nov 26, 2026

GM's reported 20% robot push asks suppliers to show automation plans in bids

GM's reported 20% robot push asks suppliers to show automation plans in bids

General Motors reportedly aims to raise North American factory automation 20% by 2028 and wants bidding suppliers to share their own automation plans. That puts robotics into how a quote is judged. Supplier Strattec shows a credible answer: 11% of assembly stations automated, with about a one-year payback.

  • 01Automation is becoming part of how GM judges a supplier quote: companies bidding on new contracts are reportedly asked to lay out their own automation plans.
  • 02A usable benchmark from a Big Three supplier: Strattec says 11% of its assembly stations are automated today, believes the share can rise above 50% over time, and says completed automation projects paid back in about a year as it automates tasks like placement and manual screw driving.
  • 03Every automated station adds controls that can stop a line, so OEM support, spare parts and backed-up PLC programs belong in the plan before the cell is promised in a bid.

Nov 26, 2026

Most plants never send technicians' repair notes back to their predictive maintenance models

Most plants never send technicians' repair notes back to their predictive maintenance models

IoT Analytics expects the smart maintenance market to grow from $8.1 billion in 2025 to $20.4 billion by 2032. The weakest link sits after the repair. In most plants, the technician's closeout note never reaches the predictive model, so work-order discipline in the CMMS matters as much as sensors or AI.

  • 01The cheapest upgrade in a $20.4 billion market may be a required field on a work order that asks one question: was the fault real?
  • 02Nick Haase of MaintainX estimates that within about five years, half of maintenance and reliability professionals will have hit retirement age—making it urgent to turn closeout knowledge into structured data.
  • 03Gousto's jump from 70% to 98.5% mechanical availability, with repair time cut from one hour to 15 minutes, is a useful benchmark for what wiring alerts straight into work orders can return.

Nov 22, 2026

Explore More Industrial IoT Insights

Read more expert perspectives from across Industrial IoT.

Browse Industrial IoT Hub

About the Expert

MarketScale Newsroom
MarketScale Newsroom

Editorial Team

MarketScale

The MarketScale Newsroom reports on the companies, technologies, and trends shaping 16 B2B industries. It turns primary sources and expert commentary into clear, useful coverage for the people doing the work.

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Industrial IoT and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512