Drugmakers' standalone devices need EU certification before EMA reviews the drug
Drugmakers pairing therapies with standalone devices may face added device regulatory responsibilities, including potentially becoming the device’s legal manufacturer. In the EU, a notified body must certify the device before the European Medicines Agency begins its drug review. That sequencing can put device certification directly on the drug’s launch timeline.
This story was produced through MarketScale. See how Healthcare teams put it to work with Executive Thought Leadership.
Key takeaways
In the EU, a standalone device's notified body certificate comes before EMA starts the drug review, so any slip in device certification pushes back the start of the drug assessment.
A general device clearance in the US is expected to show compatibility with at least one approved drug, validated for dose, rate, route and configuration, which means novel delivery systems with no drug track record will likely need a pharma co-development partner.
Before committing to an off-the-shelf device, check whether its cleared intended use covers the drug; repackaging or re-sterilizing it calls for bridging data and may require the device maker to change its labeling.
Free workspace
Turn your Healthcare expertise into content.
Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.
A drug company that ships its therapy with a standalone device picks up a second job: legal manufacturer of a medical device. That job came with a detailed map this month at the AFDO/RAPS Combination Products Summit in Baltimore, where a panel of industry specialists and an FDA reviewer walked through what changes once a pharma sponsor owns the hardware too.
Porsche Sanders, regulatory group director at Roche subsidiary Genentech, told the session that drugmakers are increasingly turning to standalone physical devices to improve the patient experience and set their therapies apart, according to Ferdous Al-Faruque's report in Regulatory Focus. The cost of that choice, as she framed it, is moving away from a drug-centric mindset: learning device regulatory pathways and accepting the responsibilities that come with being the device's legal manufacturer.
For the regulatory lead who owns a launch plan, the most consequential detail came from the European side of the table.
Two EU reviews that run in sequence
Jara Benke, senior product specialist at TÜV SÜD, laid out the mechanics. A drug paired with a standalone device goes through two independent reviews. First, a notified body certifies the device, which Sanders noted includes a conformity assessment of the manufacturer's quality management system for the CE mark. Only after that certificate is issued can the European Medicines Agency start its drug approval assessment.
In Europe, the device certificate acts as the gate. EMA will not start assessing the drug until the notified body completes its work, and until then the two reviewers operate on separate tracks. Benke said no contact between the agency and the notified body is planned at any stage, whether the device is still being certified or the drug is under review.
That ordering makes device certification a predecessor task for the drug filing. A delay at the notified body pushes back the date EMA can begin. For a sponsor that has scheduled device certification as a parallel workstream running alongside drug development, the sequence Benke described suggests the project plan may need redrawing, with the certificate sitting directly upstream of the EMA submission.
It also explains why Sanders urged sponsors to engage European health authorities early. With no planned hand-off between the two reviewers, the sponsor is the only party carrying the timeline from one review to the next.
The clinical evaluation consultation procedure (CECP) is the only interface between EMA and a notified body. Under Article 54 of the EU Medical Device Regulation, it applies to certain high-risk Class III and Class IIb devices at the end of certification, when an independent expert panel reviews the clinical evidence, the device's novel features and clinical procedures, and its benefit-risk balance.
The procedure can also come back after launch. Benke said a change in the device's intended purpose can trigger the CECP postmarket, while a change in the device's indications does not automatically do so. Lifecycle teams planning label work on a combined product would do well to classify each proposed change against that distinction before assuming the expert panel is out of the picture.
Settling the FDA lead center first
For the US, Sanders said engaging early should resolve fundamental questions, beginning with which FDA regulatory pathway suits the product. She called early alignment critical and pointed to the request for designation, an FDA tool she described as useful for reaching it.
Engaging early helps a sponsor settle which FDA product center should lead the review and what testing the product will need. It is also a chance to talk with several offices inside a center so their data expectations line up before the sponsor commits to a study design.
Her US checklist covered user and stakeholder alignment, technical considerations and labeling strategy. Her more pointed advice was about the clinical program. Sanders noted that many people working on these products come from drug companies without much standalone device experience. For that reason, she argued, cross-functional teams should discuss early on what the clinical evaluation will involve. A study may require device endpoints, and pharmaceutical teams know these less well when working on combination products.
Put the two halves of her advice together and the logic gets clearer. The lead center and the data expectations of its offices shape what a study has to show, and device endpoints are the category pharma teams have the least practice designing. So the device conversation probably belongs with the protocol drafters from day one, not with reviewers brought in once the design is set. That is why Sanders put the cross-functional conversation at the front of the process.
A large market measured on other products
Drug-device combination products, global forecast
IndustryARC
Those figures, from research firm IndustryARC, give a sense of scale. The firm puts North America at 40.12% of 2025 revenue and forecasts the US market alone to reach $81.00 billion by 2032. Its product segments run from drug-eluting stents, the largest, through antimicrobial catheters, advanced wound care products and bone graft substitutes to closed-loop glucose monitors paired with insulin pumps.
The standalone delivery devices discussed in Baltimore appear to be a different build, so the growth rate likely says little about how many drugmakers will take on device manufacturer duties. The firm does list complex dual regulatory approval among the category's main challenges, noting that it can lengthen development timelines and raise costs. That is the market-level version of the sequencing problem Benke described.
Three ways to source the device
Andrea Gray, a biomedical engineering advisor at FDA's Center for Biologics Evaluation and Research, described the arrangements sponsors actually use. Each moves the work to a different place.
A separate device partner
When the drug and device makers are different companies, Gray said both must treat the product as a whole. The drug sponsor has to confirm drug quality holds up in that specific device; the device maker has to confirm the device delivers that drug as intended. In practice, she said, that means building device considerations into drug quality elements and drug considerations into device development.
Their quality agreements need to spell out how each side notifies the other of changes, how they share data and how they coordinate when problems arise, including sharing postmarket safety information and possibly running joint root cause investigations. Because the two labels depend on each other, the separate applications also need aligned regulatory timelines.
Building it in-house
A drugmaker developing the device itself faces a different set of questions, Gray said: whether it has the design and manufacturing capability, and whether it can meet quality management and postmarket safety reporting requirements for each submission type.
IndustryARC's report points to the same pressure from the market side. It names manufacturing complexity as a major hurdle, because keeping quality, sterility and stability consistent across both the drug and device components takes specialized expertise and advanced facilities. For a sponsor weighing the in-house route, that is the capability gap Gray's questions are designed to expose.
One-way labeling and off-the-shelf devices
Gray also covered one-way labeling, in which the drug's labeling names a specific device while the device has general labeling, or vice versa. Today, a device maker pursuing a general clearance is expected to demonstrate compatibility with at least one drug that is already approved in a compatible presentation, validated for the dose, rate, route and configuration given in that drug's labeling. Novel delivery systems with no drug delivery history will find that bar hard to clear and would likely need a pharmaceutical partner and a co-development pathway.
Gray called the off-the-shelf route, where a drug sponsor takes a general labeling approach with an existing device, another common scenario. It looks like the way to skip the legal manufacturer job entirely, and sometimes it is. Viability, she said, rests on careful reading of the device's current cleared or approved intended use and indications for use.
Her conditions show where it stops working. If the proposed use falls outside the device's cleared or approved intended use, or the sponsor repackages the device out of its original primary packaging or re-sterilizes it, bridging data is needed to support the clinical study. Commercialization may then require the device maker to update its labeling or build a custom device, which brings the sponsor back to a partnership with a quality agreement at its center.
Before choosing an off-the-shelf device, ask two things: does its cleared intended use already cover our dose, rate, route and configuration, and will anything in our supply chain repackage or re-sterilize it? A yes to the second, or a no to the first, means bridging data and probably a labeling conversation with the device maker.
The data every route requires
Across all the scenarios she presented, Gray said one requirement holds: drug-device compatibility data showing the device does not harm drug quality and the drug does not compromise the device. Partner, in-house or off-the-shelf, that dataset is the shared deliverable.
Which route fits depends on one early question: whose cleared or approved labeling already covers this drug in this configuration? Where the answer is nobody's, the sponsor is heading toward co-development or its own device program, and in Europe that program's certificate will decide when EMA starts the clock on the drug.
Sources
Your experts belong here
Every story in MarketScale Healthcare starts with a company putting its clinicians, service-line leaders, and field engineers on the record. Buyers are already reading this topic. The only question is whose experts they find.
Service-line buyers vet vendors quietly, and your clinicians become the proof they find while doing it.
About the author
The MarketScale Newsroom reports on the companies, technologies, and trends shaping 16 B2B industries. It turns primary sources and expert commentary into clear, useful coverage for the people doing the work.