Skip to content
‹ Back to IndustriesEngineering & Construction

Three Reasons Contractors Prefer Leica iCON Construction Layout for BIM

Using robotic total stations in conjunction with building information modeling (BIM) is a proven way to boost the accuracy and speed of construction layout. Contractors have realized significant project savingsby implementing this approach. But maximizing the benefits requires a solution that integrates seamlessly with the modeling process. You need complete confidence that the model created in…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

·
Share
Three Reasons Contractors Prefer Leica iCON Construction Layout for BIM

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

Using robotic total stations in conjunction with building information modeling (BIM) is a proven way to boost the accuracy and speed of construction layout. Contractors have realized significant project savingsby implementing this approach. But maximizing the benefits requires a solution that integrates seamlessly with the modeling process. You need complete confidence that the model created in the office is being built accurately in the field, as well as the ability to identify and avoid possible problems before they arise.

That’s why contractors are increasingly turning to the Leica iCON Construction Layout Solution. Based on the Leica iCON robot robotic total station and controlled by a single operator using field software on a tablet PC, this system provides reliable accuracy, increased productivity and natural workflow integration. But besides those basic benefits, there are three key reasons iCON stands out as a digital layout and BIM solution:

1. Ease of use

Contractors that have used other robotic total stations repeatedly emphasize they are impressed with the simplicity of the iCON solution. Easy to learn and apply in the field, the technology provides a fast return on investment. Transferring the data between the field and office is simple and streamlined with no need for multiple imports, exports and data conversions, which provides a substantial time savings.

2. Powerful capabilities

While the iCON solution provides noteworthy productivity gains on any layout project, it excels on complex projects with angles and curves. Laying out surfaces and slope lines is fast and easy thanks to built-in routines and automated workflows.

3. Smart integrations

Leica Geosystems’ key innovation with the iCON solution is its approach to integrations. For example, the use of the Industry Foundation Classes (IFC) format, which is the industry-standard format for 3D building information modeling, enables iCON data to be used for 3D BIM in the field without the need to waste considerable time, manpower, or expensive hardware converting to another format. Contractors don’t have to manually create and input layout information—they can simply work with the model data directly in the office or field.

The iCON solution is a suite of interoperable hardware and software systems designed to work together and simplify construction layout. The iCON software is adaptable to other systems such as the Leica builder series total stations, allowing contractors with existing infrastructure access to the same easy BIM integration. Along with the Leica iCON total stations, the iCON build software can also be combined with the Leica iCON GNSS and iCON field controller, opening up new integration options.

The Best of BIM

BIM offers clear benefits for large projects. Compared to traditional methods, robotic total stations are a natural extension of BIM. They also remove the potential for human error from manual surveying techniques and can cut layout time in half. The seamless integration of iCON allows you to take full advantage of the time and accuracy advantages BIM provides, enabling you to maximize your return on investment. It’s no wonder so many contractors choose the iCON solution.

Read more at bimlearningcenter.com

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

North Texas Data Centers Boom, Mechanical Trades Constrain

North Texas Data Centers Boom, Mechanical Trades Constrain

Mechanical trades now shape liquid-cooled data center schedules

  • 01DFW data center construction faces mechanical workforce constraints
  • 02Mechanical trades are crucial for data center deployment timelines.

Nov 2, 2026

Brock's 3D scaffold model replaced 1,400+ standby hours with <25

Brock's 3D scaffold model replaced 1,400+ standby hours with <25

Brock Group executives Enrique Zavala and Brent Roscoe argue scaffolding belongs in the BIM model from the start of an industrial project. BIC Magazine reports one Brock 3D model replaced more than 1,400 budgeted standby hours with under 25 hours of rework. Peer-reviewed studies support BIM-based planning and forecasting, while noting scaffold modeling and laser scanning still demand specialized skills.

  • 01On one three-month project, BIC Magazine reports, a Brock 3D scaffold model left one minor field change and under 25 labor hours of rework against more than 1,400 budgeted standby hours.
  • 02A 2017 IAARC paper found scaffolding is usually left out of the BIM model, and a June 2024 MDPI case study found scan-to-BIM needs specialized equipment and skills, so the gains are not automatic.

Nov 2, 2026

CivDot robots shift surveyors to control and spot checks

CivDot robots shift surveyors to control and spot checks

On robotic layout jobs, the surveyor's work shifts to setting control and spot-checking the machine's marks.

  • 01On robotic layout jobs, the surveyor keeps the control network and the spot checks, the two tasks that decide whether thousands of machine-set marks are right.
  • 02Autonomy is most advanced offshore and underground, where work is risky and costly; routine low-risk jobs are adopting it more slowly.

Nov 1, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512