Skip to content
‹ Back to IndustriesEngineering & Construction

The Lights Are Going Down on a Throwaway Equipment Culture

Simply throwing out electrical equipment and updating to ‘this year’s model’ is wasteful, expensive and causes problems of pollution and toxins, especially in emerging economies. It does not have to be this way.     “We have noticed that the vast majority of issues that organizations tend to blame on software are actually about hardware components and…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

·
Share

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

Simply throwing out electrical equipment and updating to ‘this year’s model’ is wasteful, expensive and causes problems of pollution and toxins, especially in emerging economies. It does not have to be this way.  

“We have noticed that the vast majority of issues that organizations tend to blame on software are actually about hardware components and can be repaired,” says Willian Santos of ABI Electronics. PCB components can be recovered, repaired and replaced as good as new. 

Even better than that: the components can be fine-tuned to become more appropriate to the needs of the user or to perform at a higher standard, like after-sales tuning of automobiles. 

On top of that, the cost of recover, repair and reuse can be very cost-effective. It can be less than 10% of the cost of new equipment. 

ABI Electronics first appeared on the radar with news of several contract wins across the world, with air forces, other military forces, and rapid transit systems. Metro Sao Paulo in Brazil, one of the largest cities in the world, has been practicing scheduled maintenance, servicing and repair of electronic components in its trains and traffic control systems for decades, as has the UK’s Royal Air Force, which means that the principle and technology is established.  

60 million tonnes of electronic waste is thrown away across the world, every year. Pressure on the environment and from consumers and environmental lobbies mean that this level of disposal is unacceptable.  

While a lot of OEMs are wedded to the model of selling new capital equipment as often and as much as possible, the world is changing. Equipment life will be extended, one way or another, either by the customer using equipment and training modules from ABI Electronics or similar companies, or the OEMs can do it themselves. They can offer a 360-degree package, that will include maintenance, service and repair, along the servitization model. 

As it is routine for repaired equipment to operate to at least the same standard as new units, there is little excuse for the traditional model to persist. The lights are going down on the throwaway society. 

The Covid-19 pandemic has further emphasised the value of repair over replacement. New equipment takes time to arrive and may require training of operatives and users. Equipment that is already on site and is monitored by the maintenance department and can be quickly fixed on site, offers more uptime and availability. 

This may require a rethink in colleges and universities, who are turning out people who know only how to create apps. The need for skills in repair and maintenance is growing and is likely to accelerate, as more businesses adopt the circular economy approach, to put servitization to work for them and to extend useful equipment life.  

Check Out Previous Episodes of All Systems Go Here!

Follow us on social media for the latest updates in B2B!

Twitter – @MarketScale

Facebook – facebook.com/marketscale

LinkedIn – linkedin.com/company/marketscale

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

IndexBox sees panelized buildings growing 5.3% a year if panel plants keep up

IndexBox sees panelized buildings growing 5.3% a year if panel plants keep up

IndexBox forecasts the global panelized buildings market to grow 5.3% a year from 2026 to 2035, with residential housing at about 45% of 2026 demand. Factory capacity is the catch. Limited mass timber and specialized steel framing capacity will hold growth back in some regions, and IndexBox expects investment in new plants and automation to ease those bottlenecks by the late 2020s.

  • 01Panels swap scarce framing crews for factory hours, and through the late 2020s the factory hours for mass timber and specialized steel framing are scarce too.
  • 02Housing is 45% of panelized demand, but commercial and institutional projects are expected to grow faster because owners are paying for schedule certainty; warehouse and campus owners are closest to that shift.
  • 03Volumetric modular plants are estimated to need 60% to 70% utilization to break even, so the useful question for a panel supplier is how far out the specific production line is booked.

Nov 11, 2026

Requests for Paebbl's carbon-storing cement substitute far outstrip what it can produce

Requests for Paebbl's carbon-storing cement substitute far outstrip what it can produce

Rebond 300 replaces up to 30% of cement in concrete with no equipment changes. In a Holcim and Goldbeck floor slab trial at C30/37, its workability, setting time and finishing matched the reference mix. Demand exceeds what Paebbl can produce, and closing that gap is now its main challenge.

  • 01Once a carbon-storing binder clears a standard ready-mix plant and a C30/37 pour with no schedule change, the question that decides adoption is supply: how many tonnes, at what price, in what share of the mix.
  • 02If Rebond 300 displaces up to 30% of cement yet can cut embodied carbon by up to 40%, the figures imply a negative footprint beyond simple substitution; Paebbl cites a verified -149 kg CO2e per tonne of product, with results depending on mix design.

Nov 11, 2026

ABC's Hensel Phelps Diverge partnership puts field tests ahead of vendor demos

ABC's Hensel Phelps Diverge partnership puts field tests ahead of vendor demos

Carolinas contractors need field-tested evidence on new tools now. ABC's Construction Backlog Indicator reached 8.7 months in September, yet more than a quarter of contractors expect thinner margins.

  • 01A contractor with 8.7 months of work booked has time to pilot new tools. A contractor expecting thinner margins has less room to pay for a tool that only worked in the demo.
  • 02Diverge tests construction tools in controlled pilots and on active jobsites, and ABC can pass along what holds up. Contractors still need to choose what to pilot and define the metric that will decide it.
  • 03In South Carolina, a 1099 specialist brought in to run a tech pilot faces two separate state classification tests. Passing one does not settle the other.

Nov 10, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512