Skip to content
‹ Back to IndustriesEngineering & Construction

Squared Away by SMC Squared: Understanding the BOT Model for Outsourced IT: Ecolab Digital Center’s GCC Transfer

When Fortune 500 company Ecolab, a worldwide leader in energy, water and hygiene technologies and services, found themselves with a lack of available talent to execute on big ideas they turned to experts at SMC Squared. Gabrielle Bejarano sits down with Malahar Pinnelli, VP of Technology and Managing Director at Ecolab Digital Center (EDC); Supriya…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

·
Share
Squared Away by SMC Squared: Understanding the BOT Model for Outsourced IT: Ecolab Digital Center’s GCC Transfer

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

When Fortune 500 company Ecolab, a worldwide leader in energy, water and hygiene technologies and services, found themselves with a lack of available talent to execute on big ideas they turned to experts at SMC Squared.

Gabrielle Bejarano sits down with Malahar Pinnelli, VP of Technology and Managing Director at Ecolab Digital Center (EDC); Supriya Ambuga, Senior Director of Human Resources at Ecolab Digital Center; and Jessica Parker, Senior Director of Client Success at SMC Squared, to discuss Ecolab Digital Center’s Global Capability Center and their successful experience with SMC Squared’s GCC model and recent transition in Bangalore, India.

Bangalore is a center of technology and innovation. Companies aim to hire capable talent, “who can be responsible for driving technology innovation,” Pinnelli said.

SMC Squared’s business model is unique, providing strategic partners with the ability to accelerate their digital innovation and identifying high-performing teams through a build-optimize-transfer GCC model. “SMC Squared’s model is focused on building an asset over three years using the expense dollars given to the vendor partners,” Pinnelli said.

They follow a Global Capability Center – Build, Operate, Transfer Model:

Year One: Leader-first approach – find and build the right leadership team for the project

Year Two: Build to Scale – create the depth in capabilities and establish any new capabilities

Year Three: Optimize the team – create a sustainable graduate recruitment program to find talent

SMC Squared takes all the associated risks, and one of their most vital assets to training and retaining employees is incorporating culture from the beginning.

Using a global “one-team” approach, SMC Squared creates a seamless integration.

“Transfer is never easy; it’s a messy affair. But in this model, this is all part of the plan. The timeline is defined, the expectations are set, and the culture is built, so it’s all about executing the plan,” Pinnelli said, noting that the transition of 400 people for Ecolab was flawless because of the culture that SMC created from the beginning.

“A very critical piece here is the culture building,” Ambuga added.

“The way we brought team members on from the beginning is really about bringing on people as Ecolab employees from the beginning. They’re hired to fit those needs,” Parker said.

For more episodes, please visit the Squared Away Podcast series, and to learn more, visit SMC2’s website.

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

Which Trimble Connect AI tools contractors can actually use today

Which Trimble Connect AI tools contractors can actually use today

Six of the 10 AI capabilities Trimble listed at Dimensions, including scheduling and invoice matching, are available now. Change order drafting from the Document Crunch acquisition is still in development, and WorksManager Drone reaches dealers in January 2027. Plan pilots by ship date.

  • 01Six of the 10 AI capabilities Trimble listed at Dimensions are available today; contract-risk change order drafting, the feature closest to a general contractor's margin, is still in development.
  • 02Standardized AI safety labels on every current Connect agent give procurement and risk teams a document to ask any construction AI vendor for.

Nov 15, 2026

Lilly breaks ground on $3.5B Pennsylvania injectables plant whose first named drug is still in trials

Lilly breaks ground on $3.5B Pennsylvania injectables plant whose first named drug is still in trials

Eli Lilly broke ground on a $3.5 billion injectable-medicines manufacturing facility in Fogelsville, Pennsylvania, expected to be operational by 2031. The site is intended to add capacity for next-generation obesity medicines, including retatrutide, which Lilly is studying in several Phase 3 clinical trials. Lilly says the facility will use machine learning, AI and digitally integrated systems, and the site head describes the goal as a fully automated process from receiving materials through the warehouse.

  • 01Lilly cited scale figures that highlight the data burden in its process: more than 5,000 documented steps per production run and imaging and inspection of every pen more than 70 times before it ships.
  • 02Watch whether Lehigh Valley reuses the designs from Lilly's other injectable sites in Kenosha, Concord and Research Triangle Park, since a standardized network means equipment and systems choices proven at one site could repeat at the next.

Nov 14, 2026

Why Momentive says city data centers need sealant built for 1,000-foot towers

Why Momentive says city data centers need sealant built for 1,000-foot towers

Planners are pushing urban data centers toward glass facades. Bull argues high-load structural silicone glazing—like the 30 psi UltraGlaze SSG4600 used on Austin’s 1,025-foot Waterline tower—can help support heavier security glass and tighter enclosure performance in new multi-story builds.

  • 01When a city insists a data center look like an office building, the sealant holding the glass ends up doing work for the cooling plant.
  • 02UL 752 Level 7 glazing protection is indicated at about 1.6 inches thick; ensuring security glass weight and facade joint capacity align is critical.
  • 03The supertall-sealant case applies mainly to new urban builds; most operating U.S. data centers can't shut down for facade replacement and harden their glass through retrofit shields instead.

Nov 13, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512