Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

Smart Control Panels Are Powering the Backbone of AI!

The article discusses the role of smart control panels in supporting the infrastructure of modern data centers, which are crucial for the growth of artificial intelligence applications. Kasa Controls and Automation offers custom-designed control panels that enhance data center operations with automation and resilience. This is essential to meet the surging demands of hyperscale and edge data centers driven by AI workloads.

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

By Engineering And Construction · AiControl PanelsEngineeringFlexibility
Share
Smart Control Panels Are Powering the Backbone of AI!

Key takeaways

01

Smart control panels are essential for managing modern data centers.

02

Kasa Controls and Automation customizes panels for AI-driven data centers.

03

Demand for these advanced panels is rising alongside AI's growing infrastructure needs.

Get featured

Want to get featured in MarketScale Engineering & Construction?

Create a free MarketScale workspace and get your company's expertise featured across our Engineering & Construction coverage. No credit card, no demo required.

Start free

The AI Boom Is Fueling Data Center Growth — And Smart Control Panels Are Powering the Backbone

As artificial intelligence continues to revolutionize industries—from finance and healthcare to manufacturing and logistics—the demand for data processing power has exploded. At the heart of this digital transformation lies the modern data center: a complex, high-density environment that must operate with precision, efficiency, and resilience.

But behind the blinking servers and humming racks is an unsung hero: the often overlooked custom-designed control panel. And at Kasa Controls and Automation, we’re poised to help build data center control panels to our customers’ exacting specifications.

AI’s Appetite for Infrastructure

AI workloads are unlike traditional computing tasks. They require:

  • Massive parallel processing
  • High-speed data throughput
  • Constant uptime and cooling precision
  • Dynamic power distribution

This has led to a surge in hyperscale and edge data centers, each demanding more sophisticated environmental and power management systems. According to industry analysts, global data center capacity is expected to double in the next five years, driven largely by AI and machine learning applications.

The Hidden Complexity of Data Center Operations

While AI models get the spotlight, a real challenge lies deep within a control center in managing the physical environment that keeps them running. Data centers must maintain:

  • Tight temperature and humidity control
  • Redundant power systems
  • Fire suppression and safety protocols
  • Real-time monitoring and diagnostics

This is where custom-made control panels come into play.

Smart Panels: The Brains Behind the Brawn

Kasa’s custom control panels can be built to your design to bring automation, visibility, and responsiveness to the data center floor. Our panel shop has over 40,000 square feet of environmentally controlled workspace and nearby storage space, which means no panel project or quantity is too big or too small. We offer high-quality, well-organized panels with wire labels equally spaced and highly visible. A Kasa Control panel has a reputation for being neat, tidy, and even “pretty”.

Plus, we have over 50 years of experience and knowledge in the panel build business for many industries, including manufacturing, automotive, food & beverage, water/wastewater industries, and now data centers, too. Our panel build solutions include:

  • UL508a & UL698a Certified Panels
  • ISO 9001-2015 testing and checkout
  • Engineering review before starting a build
  • Built to your specs or custom design
  • Custom Enclosures
  • On-Site FAT testing and support
  • Custom labels and tags
  • World-wide shipping

Our control panels will integrate seamlessly with building management systems (BMS), SCADA platforms, and IoT sensors to provide per your engineering:

  • Real-time environmental monitoring
  • Automated alerts and fault detection
  • Energy optimization and load balancing
  • Remote diagnostics and predictive maintenance

Well-made Kasa data center control panels are easy to service, long-lasting, safe, and extremely reliable – all necessities in an AI-driven world where downtime is not an option.

Future-Proofing with Flexibility

Every data center is unique. That’s why Kasa offers customized, modular, scalable control panel solutions tailored to your specifications. Whether it’s a hyperscale buildout or a retrofit of a legacy site, our panels are designed for:

  • Rapid deployment
  • Cybersecurity compliance
  • Integration with AI-based analytics tools

Conclusion: Building the Backbone of AI

As AI continues to reshape the digital landscape, the infrastructure supporting it must evolve just as rapidly. At Kasa Controls and Automation, we’re proud to be part of that evolution—manufacturing control panels that make data centers smarter, safer, and more efficient.

Because in the age of AI, it’s not just about processing data. It’s about controlling the environment where that data lives.

If you would like to speak to our Control Panel team, contact Shawn Cadman at scadman@kasacontrols.com or by phone at 785-819-4040.

And if you’d like to learn more about our panel shop, check out our panel build page and panel build videos at Panel Build | Kasa Controls & Automation.

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Get your team featuredSee how it works15 minutes, straight to a calendar.

About the author

EA
Engineering And Construction

Follow Engineering & Construction Insights

Get new expert content in your inbox.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free plan

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale workspace, up to 10 people
One professional video edit a month for qualifying companies
Media requests to your crowd, remote recording, AI writing tools
$0, no credit card, nothing that expires

More Engineering & Construction Insights

Packaging robots are now cheaper than labor over the long run, PMMI says

Packaging robots are now cheaper than labor over the long run, PMMI says

PMMI's Tom Egan wrote in Processing Magazine that adding packaging automation and robotics can now be justified as more cost-effective over the long term than the high cost of labor in food, beverage and CPG plants. Separately, Packaging World describes AI-enabled AMRs from ABB and Agilox that automate material movement between packaging stations. The remaining gap is adoption among smaller manufacturers.

  • 01Two reference points for infrastructure-light material movement: ABB's Flexley Mover P603 carries 1,500 kg with sub-centimeter positioning and no floor markers, and Agilox's OFL lifts 800 kg pallets on peer-to-peer fleet software with no central traffic controller, per Packaging World.
  • 02The open ground is small and mid-sized manufacturers: MTC's Mike Wilson counts tens of thousands of UK SMEs with no robotic automation at all and expects cobots to take most of that growth.
  • 03A robotics business case should include procurement, not only line labor: a June 2026 China Journal of Accounting Research study found heavy robot adopters spread buying across more suppliers, gaining resilience but losing inventory efficiency and adding transaction costs.

Sep 18, 2026

Xtellio brings telematics to jobsite tools and heaters

Xtellio brings telematics to jobsite tools and heaters

Xtellio launched a two-tier telematics platform in March 2026: 32 battery-powered Xense sensors for small tools and wired Pro-Xentral devices for excavators, light towers and heaters. The company claims a 10-year battery life. Data is delivered through open APIs, which Xtellio frames as customer ownership of the data, aimed at rental and construction fleets where small assets have gone largely untracked.

  • 01A 10-year battery claim on a bolt-on Bluetooth sensor is the benchmark to hold any small-asset telematics vendor against; it decides whether tagging hundreds of tools is a one-time job or a recurring maintenance chore.
  • 02For rental houses and contractors running mixed fleets, the sharper question is no longer which machines have telematics but whether the heaters, light towers and hand tools do, and whether that data lands in the same system.
  • 03Open APIs and customer-owned data are now part of the pitch from a telematics hardware maker, which gives buyers a concrete contract clause to ask for: where can the data be sent, and who controls it once the asset is on rent.

Sep 18, 2026

Senate bill would double smart water grants to $50 million a year

Senate bill would double smart water grants to $50 million a year

S. 2388, the Water Infrastructure Modernization Act of 2025, would double an EPA water tech pilot to $50 million a year through 2028. Grants would cover design, construction, training and operations for leak detection, advanced metering and AI analytics, WaterWorld reported. Planning and maintenance stay on the utility's tab.

  • 01Under S. 2388 as WaterWorld describes it, feasibility studies are not grant-eligible, so a utility would have to pay to build the case for a smart water project before applying for help building the project itself.
  • 02The bill's eligible list puts advanced digital design and construction management tools in the same bucket as meters and sensors, which would give a utility's capital delivery team a claim on the same grant as its field operations group.
  • 03The existing pilot program's authorization runs through 2026, per WaterWorld; the bill would extend it to 2028, and its last reported status was 'introduced' as of Aug. 12, 2025.

Sep 17, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

About the Expert

EA
Engineering And Construction

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512