Power, Cooling, and Risk: What It Takes to Bring a 100MW AI Data Center Online

The construction of AI data centers, particularly those exceeding 100 megawatts, introduces new challenges in transitioning from construction to operational phases. Operators must verify entire systems like power and cooling to ensure they withstand real-world conditions. As AI demand rises, mastering these transitions is crucial for success.

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Promoted content from Applied Digital on MarketScale.

By Applied Digital · Ai Data CentersApplied DigitalData Center DesignData Center Operations
Share

Key takeaways

01

The industry is adept at building data centers but struggles with scaling AI facilities.

02

Facilities surpassing 100 megawatts require testing of entire systems, not just equipment.

03

The commissioning phase is vital and involves sophisticated, months-long system validation.

Get featured

Want MarketScale to feature Engineering & Construction?

Book a 15-minute demo and we'll map your Engineering & Construction expertise to the content buyers are searching for.

Book a demo

The industry knows how to build data centers. What it’s still figuring out is how to turn on AI factories at scale. With facilities now crossing 100 megawatts—far beyond the 5 to 10 megawatt norm of traditional builds—operators are no longer just validating equipment. They’re testing whether entire systems—power, cooling, controls, and the teams behind them—can hold together under real-world conditions. As AI demand accelerates, that transition from construction to live operations is becoming one of the most critical—and least understood—phases of the data center lifecycle. When you flip the switch on a 100-megawatt AI facility, what determines whether it runs smoothly—or starts to break? Architects of Acceleration Volume II opens with a closer look at what it really takes to bring an AI data center online—focusing on the commissioning phase where infrastructure is tested, systems are validated, and facilities transition from construction to live operations. Host Philbert Shih, Founder and Managing Director of Structure Research, sits down with Laura Laltrello, COO, and Stephen Lattimer, VP of Design & Engineering at Applied Digital. Together, they unpack the critical and often misunderstood phase of commissioning—where AI infrastructure moves from theoretical readiness to real-world performance under load. The discussion centers on the operational, technical, and organizational realities of bringing hyperscale AI facilities online. What you’ll learn… Commissioning at scale is not a checklist—it’s a months-long systems validation process, often beginning 30–45 days after groundbreaking and intensifying in the final stretch before readiness for service (RFS). Mechanical systems—especially cooling—pose the greatest operational risk, requiring constant recalibration as real-world conditions diverge from design assumptions. Success hinges on coordination, sequencing, and communication, with early planning, vendor alignment, and in-person collaboration proving essential to meeting aggressive timelines. Laura Laltrello serves as the Chief Operating Officer of Applied Digital, where she leads operational execution and strategy for large-scale AI and data center infrastructure. She brings nearly 20 years of executive leadership experience across data centers, building technologies, and energy systems, along with a strong track record of managing multi-billion-dollar P&Ls and delivering complex global projects. Prior to Applied Digital, she held senior leadership roles at Honeywell and Lenovo, where she scaled global services businesses, led enterprise operations, and drove major transformations in infrastructure and technology delivery. Stephen Lattimer is the Vice President of Data Center Design at Applied Digital, where he focuses on the design of data center infrastructure. He previously served as a Data Center Architect at Flexential and spent nearly three decades at Sturgeon Electric in roles ranging from electrician to project lead. His career reflects deep, hands-on experience in electrical systems, project execution, and data center development. This progression from field roles to leadership gives him a practical, ground-level perspective on designing and delivering complex infrastructure projects. Article written by MarketScale.

Part of this channel

Applied Digital

News, updates, and expert insights from Applied Digital.

Visit the channel

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Get your team featuredSee how it works15 minutes, straight to a calendar.

About the author

AD
Applied Digital

Follow Engineering & Construction Insights

Get new expert content in your inbox.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

Procore acquires DroneDeploy for $845M, giving construction teams a direct line from drone data to project management

Procore acquires DroneDeploy for $845M, giving construction teams a direct line from drone data to project management

Procore has acquired DroneDeploy for $845 million, enhancing its construction project management capabilities. This acquisition integrates drone-based reality capture data with Procore's project management tools, streamlining the workflow between site data capture and management. The integration aims to improve efficiency and reduce gaps in construction project workflows.

  • 01Procore acquired DroneDeploy for $845 million.
  • 02The acquisition integrates drone data directly into construction project management.
  • 03This integration is expected to improve construction project efficiency and reduce data workflow gaps.

Aug 7, 2026

What Challenges Are Manufacturers Facing Under Annex 1?

What Challenges Are Manufacturers Facing Under Annex 1?

Manufacturers are facing significant challenges under Annex 1, which regulates sterile production processes. Compliance with these regulations is critical for maintaining product safety and quality. Identifying potential risks and implementing effective control measures are key aspects for manufacturers to address.

  • 01Annex 1 presents challenges in maintaining sterile production processes for manufacturers.
  • 02Compliance with Annex 1 regulations is crucial for product safety and quality.
  • 03Manufacturers must identify risks and implement effective control measures.

Aug 3, 2026

What Are the Biggest Challenges Pharmaceutical Manufacturers Are Facing Today?

What Are the Biggest Challenges Pharmaceutical Manufacturers Are Facing Today?

Pharmaceutical manufacturers face significant challenges such as ensuring quality control, navigating regulatory requirements, and managing supply chain disruptions. These issues are intensified by the need for innovation and rapid response to market demands. Companies must balance these factors to remain competitive in the industry.

  • 01Quality control is a major challenge for pharmaceutical manufacturers.
  • 02Regulatory compliance is essential but can be complex and time-consuming.
  • 03Supply chain disruptions require strategic management and contingency planning.

Aug 3, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

About the Experts

AD
Applied Digital
PS
Philbert Shih

Founder and Managing Director

Structure Research

LL
Laura Laltrello

COO

Applied Digital

SL
Stephen Lattimer

VP of Design & Engineering

Applied Digital

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512