Skip to content
‹ Back to IndustriesEngineering & Construction

NYSE Mayhem Traced to a Staffer Who Left a Backup System Running

(Bloomberg) — More than 700 miles from Wall Street, the New York Stock Exchange’s backup data center on Cermak Road in Chicago is supposed to safeguard US markets, standing by at all hours in case disaster ever strikes the world’s largest venue for trading shares. When markets are closed, it participates in a well-worn routine,…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

·
Share
NYSE Mayhem Traced to a Staffer Who Left a Backup System Running

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

(Bloomberg) — More than 700 miles from Wall Street, the New York Stock Exchange’s backup data center on Cermak Road in Chicago is supposed to safeguard US markets, standing by at all hours in case disaster ever strikes the world’s largest venue for trading shares.

When markets are closed, it participates in a well-worn routine, with NYSE staffers turning on and off systems to ensure everything works. But heading into Tuesday, an NYSE employee failed to properly shut down Cermak’s disaster-recovery system — leading to a disaster.

That human error, described by people with direct knowledge of NYSE’s internal operations, is what triggered wild market swings when trading opened Tuesday morning in Manhattan. The chaos affected more than 250 companies including Wells Fargo & Co., McDonald’s Corp., Walmart Inc. and Morgan Stanley, in some cases sending stock prices swinging by 25 percentage points in a matter of minutes.

The episode has prompted the exchange to cancel thousands of trades at a cost that’s still being determined. Meanwhile, market professionals and day traders are rattled and waiting for the exchange to elaborate on what it publicly called a “manual error” involving its “disaster recovery configuration.”

“They’re going to need to come up with something better” to assuage investors and regulators, said Joseph Saluzzi, a partner and co-founder of Themis Trading LLC, whose firm avoided losses. “Though systems fail, and we understand that, there’s zero tolerance when it comes to the opening and the close.”

Read more: Schwab criticizes NYSE over system failure that roiled trading

In plainer English, according to one of the people, the turmoil resulted because the backup system in Cermak was left running. That misled the exchange’s computers to treat the 9:30 a.m. opening bell as a continuation of trading, and so they skipped the day’s opening auctions that neatly set initial prices.

Without that routine step, orders flowed through at prices all over the place. That soon tripped circuit breakers designed to prevent violent market swings, setting off alarms on screens across the investing world.

NYSE executives spent hours pinpointing the problem until they were confident there wouldn’t be further fallout, said the people, who spoke on the condition they not be identified discussing the internal matter. Officials also began reviewing whether the dislocated trades could be labeled “clearly erroneous” under the market’s rules and then canceled. Shortly before 3 p.m. Tuesday, the exchange announced that it would unwind the most egregious transactions.

Fielding Claims

NYSE has yet to determine how much the debacle may cost. It’s already fielding claims from firms under the exchange’s rules, the people said. Those affected have until Friday, three days after the event, to describe any damages.

The venue gathers about $500,000 per month for a fund to compensate exchange members — mostly broker-dealers representing their investor clients — when such mishaps occur. Decisions on claims for Tuesday’s episode will be made by the end of the month.

Behind closed doors, NYSE executives are grappling not just with the potential cost, but the impact on the exchange’s reputation. They’re in contact with regulators and lawmakers to explain what happened. And they plan to examine the platform’s procedures and management, potentially reworking rules to be more flexible and provide further protections.

The exchange hadn’t determined as of late Wednesday whether anyone would face disciplinary action.

Charles Schwab Corp., the brokerage catering to retail investors, openly criticized the NYSE on Wednesday, saying it’s disappointed by how the incident was handled and that individuals may not get a fair shake when it comes to compensation. Schwab said the episode should also raise concerns about regulatory proposals that could push more trading onto stock exchanges.

“Unfortunately, the NYSE has not owned up to their full responsibility and retail investors will have to go through a lengthy process to correct orders, with no guarantee of a reasonable outcome,” Schwab spokesperson Mayura Hooper said. “It further heightens our concerns that routing even greater levels of retail orders to the exchanges will dramatically reduce the quality of the investing experience for America’s retail investors.”

More stories like this are available on

bloomberg.com

©2023 Bloomberg L.P.

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

What a tilt-up credential tells you about a project supervisor

What a tilt-up credential tells you about a project supervisor

The ACI/TCA program separates examination knowledge from verified field experience. That distinction helps teams review qualifications more clearly.

  • 01Technician certification establishes the written-examination requirement.
  • 02Supervisor certification also requires verified construction, tilt-up and supervisory experience.
  • 03Match the exact credential and relevant work history to the responsibility being considered.

Nov 10, 2026

Veolia to treat a 3-million-person wastewater load at Arauco's Brazil pulp mill

Veolia to treat a 3-million-person wastewater load at Arauco's Brazil pulp mill

Veolia will design and implement the industrial effluent treatment plant for Arauco's US$4.6 billion Sucuriú pulp mill in Inocência, Mato Grosso do Sul, Brazil. The plant will be capable of treating 10,600 cubic meters of wastewater per hour. Veolia says the organic load is equivalent to that of a municipality of 3 million inhabitants. It will use its biofilm activated sludge process, which aims to maximize treatment capacity within a compact footprint, ahead of the mill's expected late 2027 start of operations.

  • 01The plant will treat 10,600 cubic meters an hour at a 3.5 million-tonnes-a-year mill, with wording that suggests a reference design for next-generation builds.
  • 02Veolia’s design targets a compact footprint and includes belt presses to dewater sludge, making sludge handling part of the treatment system.

Nov 9, 2026

Case's N Series small dozers keep the same engines and rebuild the cab

Case's N Series small dozers keep the same engines and rebuild the cab

Case says its updated small dozers keep the same engine, with changes centered on cab controls, a new display and operator customization.

  • 01With the engine unchanged, the M-to-N story is cab controls, operator profiles and improved sightlines.
  • 02With the 650N now on electric-over-hydraulic blade control, Case says its entire dozer lineup uses EH blade control.

Nov 9, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512