Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

MINING FILM THAT DOESN’T CUT CORNERS

Brattices play a vitally important role in mining. These concrete, wood, or cloth partitions are erected within mine shafts for providing ventilation. By dividing a single shaft into two parts with a brattice, air can be delivered down one section of the shaft, and then ventilated out through the other side. Following the 1862 Hartley…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share
MINING FILM THAT DOESN’T CUT CORNERS

Get featured

Want to get featured in MarketScale Engineering & Construction?

Create a free MarketScale workspace and get your company's expertise featured across our Engineering & Construction coverage. No credit card, no demo required.

Request an invite

Brattices play a vitally important role in mining. These concrete, wood, or cloth partitions are erected within mine shafts for providing ventilation. By dividing a single shaft into two parts with a brattice, air can be delivered down one section of the shaft, and then ventilated out through the other side. Following the 1862 Hartley Colliery Disaster in Northumberland, England which saw 204 men die of carbon monoxide poisoning following a mining accident where the shaft became blocked by a beam, UK government regulators mandated that collieries have at least two shafts. To this day, brattices remain essential as they are leveraged to direct air currents throughout the entirety of an underground mining structure.

While permanent brattices typically utilize a wood or concrete design, temporary brattices make use of cloth curtains. To ensure superior ventilation and minimize the risk of fire, the curtains are usually made out of flame retardant materials. Pres-Flex, a division of Presco, engineers vinyl films formulated with flame retardants, making them ideal for use in the construction of brattice curtains. Our films meet the stringent flame specifications established by the Mine Safety and Health Administration (MSHA). We understand that well-made, self-extinguishing brattice curtains could mean the difference between life and death for miners, so we never cut corners and take our obligation to meet the MSHA standards seriously.

In fact, our film exceeds the MSHA 30 CFR 7.27 test for flame resistance of brattice cloth. For operations that require special cold crack properties, we can custom formulate films so that they can be used in frigid winter conditions. Our films are available in a variety of colors including double polished clear and mine safety yellow. Additionally, we are able to customize the thicknesses and roll sizes to suit the unique needs of an operation. And to help meet your sustainability goals, Pres-Flex mining film is 100% recyclable.

For over 20 years, Presco has developed leading Pres-Flex Mining Film for use in the construction of brattice curtains for underground mines. We’ve used our experience to engineer a durable, flexible vinyl material that helps to ensure worker safety and exceed the standards outlined by MSHA. Our specialized, technical know-how enables us to create custom formulations, subject to minimums and lead times. To learn more about high-quality Pres-Flex Engineered Film extruded right here in the United States, learn more today!

Read more at garagecabinets.com

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Get your team featuredSee how it works15 minutes, straight to a calendar.

Follow Engineering & Construction Insights

Get new expert content in your inbox.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

HUD’s 24-month mass timber modular project goes after the cost driver: shipping the modules

HUD’s 24-month mass timber modular project goes after the cost driver: shipping the modules

HUD is funding a 24-month Washington State University project to redesign modular housing modules around transport and fast site assembly. Shipping is the design constraint. A 2023 Journal of Building Engineering review of 2009–2021 modular CLT projects suggests faster construction timelines, but logistics choices still decide feasibility.

  • 01In modular housing, transportation is becoming a first-order engineering spec, the module that is cheapest to build can still be the most expensive to move.
  • 02The 2023 review found 2D modular CLT projects were, on average, transported farther and built faster than 3D ones, so configuration choice shapes both transport reach and install time.

Sep 5, 2026

Insurance and moisture controls now dictate mass timber schedules

Insurance and moisture controls now dictate mass timber schedules

Mass timber can go up as little as one day per floor. But builder’s risk and property insurance can be harder to place and pricier, largely tied to moisture exposure during construction. Metropolis says mass timber is mainstreaming across North America.

  • 01The schedule advantage is real, but it is only bankable if the project has a funded moisture-control plan from mill to dry-in.
  • 02Insurance has become an early design input for mass timber, forcing owners to lock in risk controls and documentation before procurement.
  • 03For mid-rise and campus projects, mass timber’s headline benchmark is cycle time per floor, which shifts schedule risk onto crane picks, staging, moisture protection, and inspection windows.

Sep 5, 2026

Dallas is still building big, but U.S. apartment deliveries fell 41%

Dallas is still building big, but U.S. apartment deliveries fell 41%

Apartment deliveries in the U.S. decreased by 41% in the first half of 2026, according to Yardi Matrix data. Despite this national trend, Dallas/Fort Worth led in both multifamily and industrial deliveries.

  • 01Apartment deliveries in the U.S. dropped 41% in H1 2026.
  • 02Dallas/Fort Worth led the nation in multifamily and industrial deliveries.

Aug 29, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512