Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

Is Infrastructure To Blame For California’s Port Problems?

From Los Angeles to Long Beach, cargo ships are backed up off the coast. The supply chain snafu leaves ships vying for the same docks and often backs them up for as much as a week. At its peak, as many as 40 ships and 14,000 containers float aimlessly around the sea, and businesses are…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share

From Los Angeles to Long Beach, cargo ships are backed up off the coast. The supply chain snafu leaves ships vying for the same docks and often backs them up for as much as a week. At its peak, as many as 40 ships and 14,000 containers float aimlessly around the sea, and businesses are often left wondering when they’ll get their shipments.

What is causing this major issue in the supply chain?

Voice of B2B, Daniel Litwin, talked on MarketScale TV with Tray Anderson, Industrial & Logistics Leader, Americas, Cushman & Wakefield, a leading commercial real estate services firm, about America’s infrastructure, COVID, and supply chain management and how these things fuel these supply chain issues.

The ASCE’s 2021 America Infrastructure Report Card upgraded to a B- from a C+, as port infrastructure improved over the past four years. With those improvements, a funding gap of $15.5 billion must be met to enhance waterside infrastructure over the next ten years.

Anderson noted the log jam at the ports in California is a pre-pandemic issue. They are already operating at near capacity, and when there are large surges, especially during COVID, you start to see this backup.

“These ports are not operating at 60 percent capacity; day-to-day, they’re already operating at near-peak capacity,” Anderson said. “And when you have these surges the pandemic has pushed, what I call ‘lumpy demand,’ that’s when you have these backups.”

Over time the backlogs get worked down, but not quickly.

The infrastructure projects take time, and the ROI isn’t immediate. Routing selection is also something that suppliers and businesses are doing to alleviate backup issues.

Follow us on social media for the latest updates in B2B!

Twitter – @MarketScale

Facebook – facebook.com/marketscale

LinkedIn – linkedin.com/company/marketscale

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one Engineering & Construction expert. Imagine publishing your whole team.

This article was produced through MarketScale. Create a free workspace and turn your own team's Engineering & Construction expertise into the articles, video, and social content B2B marketing buyers in your industry are searching for. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

Albany's construction sector signals growth from Regeneron's $2B expansion to rising contractor billings

Albany's construction sector signals growth from Regeneron's $2B expansion to rising contractor billings

Albany's construction sector is experiencing growth fueled by Regeneron's $2 billion expansion in Saratoga and an increase in contractor billings. Several new regional offices are opening, contributing to a busy construction cycle in the Capital Region.

  • 01Regeneron is investing $2 billion in its Saratoga facilities, boosting the local construction sector.
  • 02Contractor billings in the Capital Region are on the rise, indicating a growth trend in construction activity.
  • 03The opening of new regional offices is supporting the expansion of construction efforts in the area.

Jul 20, 2026

MasTec acquires Superior Group for $1.65B as grid buildout drives contractor consolidation

MasTec acquires Superior Group for $1.65B as grid buildout drives contractor consolidation

MasTec has acquired Superior Group for $1.65 billion in an all-cash deal, enhancing its utility portfolio. This acquisition comes as the clean energy sector is set to grow with upcoming federal awards. The acquisition brings in specialized electrical crews and equipment to MasTec.

  • 01MasTec acquired Superior Group for $1.65 billion in an all-cash transaction.
  • 02The acquisition strengthens MasTec's utility portfolio with specialized electrical crews and equipment.
  • 03The deal prepares MasTec for forthcoming federal clean energy awards.

Jul 19, 2026

Automated factories are raising the bar on efficiency. Here's where the benchmark sits in 2026

Automated factories are raising the bar on efficiency. Here's where the benchmark sits in 2026

Automated factories are significantly enhancing efficiency in manufacturing. Notable examples include Foxconn's lighthouse factory achieving a 45% cost reduction and GM's heavily robotized EV plant, which showcase the evolving standards in industry practices. These advancements set new benchmarks for world-class manufacturing as of 2026.

  • 01Foxconn's lighthouse factory achieved a 45% cost reduction through automation.
  • 02GM's EV plant features extensive use of robots, highlighting automation's role in efficiency.
  • 03New benchmarks in manufacturing are being established by advancements in factory automation.

Jul 18, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512