Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

Is Infrastructure To Blame For California’s Port Problems?

From Los Angeles to Long Beach, cargo ships are backed up off the coast. The supply chain snafu leaves ships vying for the same docks and often backs them up for as much as a week. At its peak, as many as 40 ships and 14,000 containers float aimlessly around the sea, and businesses are…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share

From Los Angeles to Long Beach, cargo ships are backed up off the coast. The supply chain snafu leaves ships vying for the same docks and often backs them up for as much as a week. At its peak, as many as 40 ships and 14,000 containers float aimlessly around the sea, and businesses are often left wondering when they’ll get their shipments.

What is causing this major issue in the supply chain?

Voice of B2B, Daniel Litwin, talked on MarketScale TV with Tray Anderson, Industrial & Logistics Leader, Americas, Cushman & Wakefield, a leading commercial real estate services firm, about America’s infrastructure, COVID, and supply chain management and how these things fuel these supply chain issues.

The ASCE’s 2021 America Infrastructure Report Card upgraded to a B- from a C+, as port infrastructure improved over the past four years. With those improvements, a funding gap of $15.5 billion must be met to enhance waterside infrastructure over the next ten years.

Anderson noted the log jam at the ports in California is a pre-pandemic issue. They are already operating at near capacity, and when there are large surges, especially during COVID, you start to see this backup.

“These ports are not operating at 60 percent capacity; day-to-day, they’re already operating at near-peak capacity,” Anderson said. “And when you have these surges the pandemic has pushed, what I call ‘lumpy demand,’ that’s when you have these backups.”

Over time the backlogs get worked down, but not quickly.

The infrastructure projects take time, and the ROI isn’t immediate. Routing selection is also something that suppliers and businesses are doing to alleviate backup issues.

Follow us on social media for the latest updates in B2B!

Twitter – @MarketScale

Facebook – facebook.com/marketscale

LinkedIn – linkedin.com/company/marketscale

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one expert. Imagine publishing your whole team.

This article was produced through MarketScale. Create a free workspace and turn your own team's expertise into articles, video, and social posts. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

AI moves from back office to job site in construction's next build-out

AI moves from back office to job site in construction's next build-out

McCarthy Building Companies has entered a multimillion-dollar agreement with Palantir to enhance AI adoption. However, RICS experts highlight that data readiness and organizational culture pose significant challenges. This development signals a shift in integrating AI within construction sectors.

  • 01McCarthy Building Cos. signs a major deal with Palantir.
  • 02Data readiness is a critical hurdle for AI integration.
  • 03Organizational culture impacts AI adoption in construction.

Jul 11, 2026

South Korea commits $7.5 billion to AI-autonomous manufacturing as smart factory count hits 30,000

South Korea commits $7.5 billion to AI-autonomous manufacturing as smart factory count hits 30,000

South Korea is investing $7.5 billion in advancing AI-autonomous manufacturing, with a significant increase in smart factories, now totaling 30,000. The initiative also targets the development of 100 AI manufacturing zones throughout the country.

  • 01South Korea invests $7.5 billion in AI-autonomous manufacturing.
  • 02There are currently 30,000 smart factories in South Korea.
  • 03The government aims to develop 100 AI manufacturing zones.

Jul 11, 2026

Construction's productivity crisis: why ML cost forecasting and off-site methods are converging

Construction's productivity crisis: why ML cost forecasting and off-site methods are converging

U.S. construction productivity has decreased since 1968. Machine learning models and off-site construction methods are becoming pivotal in bridging this productivity gap by providing accurate cost forecasting and efficient building practices.

  • 01U.S. construction productivity has been declining since 1968.
  • 02Machine learning models offer enhanced cost forecasting capabilities.
  • 03Off-site construction methods contribute to improved project efficiency.

Jul 10, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512