Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

Full Facility Tour

&nbp; We’re at the frick facility for Johnson Controls here in Waynesboro, Pennsylvania. Ed, this is the controls manufacturing area where we make our QuadM HD unity panels, as well as all the other control panels here in Waynesboro. The panels we make here at Frick, they’re they’re used to control compressors and other industrial…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share

Get featured

Want to get featured in MarketScale Engineering & Construction?

Create a free MarketScale workspace and get your company's expertise featured across our Engineering & Construction coverage. No credit card, no demo required.

Start free

&nbp;

We’re at the frick facility for Johnson Controls here in Waynesboro, Pennsylvania.

Ed, this is the controls manufacturing area where we make our QuadM HD unity panels, as well as all the other control panels here in Waynesboro. The panels we make here at Frick, they’re they’re used to control compressors and other industrial refrigeration equipment. At Frick is the market leader We have the most advanced panels providing controls, communications capabilities, and all that you need to control your industrial refrigeration facility.

This is the first station in the Quantum HD Unity. Flown line assembly process. Here on the bench, they put the back plate and then assemble the components that have won that back plate. We have a couple sub assemblies that are put together, and then the components that are here within easy reach are all tied together on this back plate. Once this backplate assembly is completed, it’s moved over to the panel.

The enclosure is put here on the cart, and then the sub assemblies are installed in the panel. Each of these sub assemblies are wired together in the panel with the harnesses and wiring. Additional components are added. After those components are added, then the package harness is added here at the bottom of the panel, and this completes the assembly process.

This flow line the panel to be assembled very quickly and allows us to meet our customers’ needs for shipping panels on short notice. Once the quad of HD Unity compressor panel is assembled, the cart in the panel is rolled over here to the test station for testing. The first thing the tester will is he takes the test harnesses and wires those into the panel tying them into the analog and digital boards. Then he runs through the test process the tester will communicate to the analog and digital boards and verify that each of the channels, as well as the wiring is assembled and working properly.

After the hardware is tested, then the software is updated through the Ethernet port to the latest software.

In addition, the set points for this panel that are specific to that customer site are loaded to the panel. This allows the panel to be configured and ready to ship to the customer site for install and be configured for the equipment that it’s going to be installed on.

These are the large assembly tables. Here are the ECS assembly area. These are used to build the large PLC cabinets. They’re used for our PLC plant controls.

This is an Allen Bradley back plate. Here you can see the Allen Bradley hardware. It’s wired up to the HOA switches. This is all used to control a full refrigeration facility.

And these are custom programmed to meet the customer’s needs. Once this PLC back plate is all wired together. The whole back plate is mounted in this cabinet. It’s tested by the PLC programmer.

And then shipped to the customer site. By this large table, the team is building a Quad of HD unity system panel. This is used to control the system parts of the refrigeration facility, including the condenser vessel, evaporator, engine room. This uses the same analog and digital boards that we use on our compressor panels.

It’s all tied together and then controlled from the interface.

This panel is installed in the large cabinet and then shipped to the customer site where it’s wired in and set up to configure those parts of the refrigeration system.

Hi. This is Doug. We’re on a compressor assembly shop floor.

This is a compressor model that we’re building today. It has the discharge housing and the rotor housing bolted together and then right here is the the set of rotors that’ll be going into this machine. The operator will pick these up with a crane. He will bring them back over here after he pivots this table.

This will be vertical. He will drop the two rotors into the machine, then he will both the inlet housing and the slide valve assembly onto this machine button it up and you’ll be ready to go test for leaks over to dip tank. So this is food and beverage assembly. A lot of units coming through here now.

We’re quite busy. As you can see, This unit here, the compressor and motor have now been mounted. All these components down here were added over on the flow line. What happens here after the the motor and the compressor have been mounted, we start running all the tubing, added on other devices to the unit, then what we do is we pump it full of air and we soap it down and check it for leaks.

If we have any leaks, we go ahead and take care of those right away. Then we we hook it up to the vacuum pump, we evacuate the unit We hold that evacuation for two hours. Once it passes the evacuation test, we’ll button it all up and send it over to be washed for paint.

So now we’re in our paint area. So what happens here is after assembly processes complete. We bring the package over here. We set it on this wash pad and we wash it all down real good, get any oils or debris off of it, then we dry it off real good with compressed air, make sure everything’s dry and clean, and then we will mask off any components that we don’t want want to be painted.

Once we have it all masked off, we’ll take it And these doors on this paint booth open up will open up the doors, pick the F and B package up with the crane, and take it into the paint booth. We will close the doors. The painter will go in there. He will spray prime coat on the on the package itself. And then before that dries, he’s able to spray a top coat on there.

Once he sprayed the top coat on there, he exits the booth and he turns on the cure cycle.

Heaters come on and then the paint booth heats up to, I believe, a hundred and forty degrees. It holds that for about an hour and a half. Makes that paint dry real good. Gives it a nice durable and nice look to it.

So we are still here in the final assembly shop. We are in the YPS Bay right now. As you can see, we are building a couple of refrigerant recirculator packages behind me. We have another one here and then another one over here to my right.

So we’re utilizing the YPS bay to build food and beverage packages because our our business is very, very good right now, and we’ve had to repurpose floor space to build food and beverage packages.

Transcript ordered

Video TranscriptExpand ↓

We're at the frick facility for Johnson Controls here in Waynesboro, Pennsylvania. Ed, this is the controls manufacturing area where we make our QuadM HD unity panels, as well as all the other control panels here in Waynesboro. The panels we make here at Frick, they're they're used to control compressors and other industrial refrigeration equipment. At Frick is the market leader We have the most advanced panels providing controls, communications capabilities, and all that you need to control your industrial refrigeration facility. This is the first station in the Quantum HD Unity. Flown line assembly process. Here on the bench, they put the back plate and then assemble the components that have won that back plate. We have a couple sub assemblies that are put together, and then the components that are here within easy reach are all tied together on this back plate. Once this backplate assembly is completed, it's moved over to the panel. The enclosure is put here on the cart, and then the sub assemblies are installed in the panel. Each of these sub assemblies are wired together in the panel with the harnesses and wiring. Additional components are added. After those components are added, then the package harness is added here at the bottom of the panel, and this completes the assembly process. This flow line the panel to be assembled very quickly and allows us to meet our customers' needs for shipping panels on short notice. Once the quad of HD Unity compressor panel is assembled, the cart in the panel is rolled over here to the test station for testing. The first thing the tester will is he takes the test harnesses and wires those into the panel tying them into the analog and digital boards. Then he runs through the test process the tester will communicate to the analog and digital boards and verify that each of the channels, as well as the wiring is assembled and working properly. After the hardware is tested, then the software is updated through the Ethernet port to the latest software. In addition, the set points for this panel that are specific to that customer site are loaded to the panel. This allows the panel to be configured and ready to ship to the customer site for install and be configured for the equipment that it's going to be installed on. These are the large assembly tables. Here are the ECS assembly area. These are used to build the large PLC cabinets. They're used for our PLC plant controls. This is an Allen Bradley back plate. Here you can see the Allen Bradley hardware. It's wired up to the HOA switches. This is all used to control a full refrigeration facility. And these are custom programmed to meet the customer's needs. Once this PLC back plate is all wired together. The whole back plate is mounted in this cabinet. It's tested by the PLC programmer. And then shipped to the customer site. By this large table, the team is building a Quad of HD unity system panel. This is used to control the system parts of the refrigeration facility, including the condenser vessel, evaporator, engine room. This uses the same analog and digital boards that we use on our compressor panels. It's all tied together and then controlled from the interface. This panel is installed in the large cabinet and then shipped to the customer site where it's wired in and set up to configure those parts of the refrigeration system. Hi. This is Doug. We're on a compressor assembly shop floor. This is a compressor model that we're building today. It has the discharge housing and the rotor housing bolted together and then right here is the the set of rotors that'll be going into this machine. The operator will pick these up with a crane. He will bring them back over here after he pivots this table. This will be vertical. He will drop the two rotors into the machine, then he will both the inlet housing and the slide valve assembly onto this machine button it up and you'll be ready to go test for leaks over to dip tank. So this is food and beverage assembly. A lot of units coming through here now. We're quite busy. As you can see, This unit here, the compressor and motor have now been mounted. All these components down here were added over on the flow line. What happens here after the the motor and the compressor have been mounted, we start running all the tubing, added on other devices to the unit, then what we do is we pump it full of air and we soap it down and check it for leaks. If we have any leaks, we go ahead and take care of those right away. Then we we hook it up to the vacuum pump, we evacuate the unit We hold that evacuation for two hours. Once it passes the evacuation test, we'll button it all up and send it over to be washed for paint. So now we're in our paint area. So what happens here is after assembly processes complete. We bring the package over here. We set it on this wash pad and we wash it all down real good, get any oils or debris off of it, then we dry it off real good with compressed air, make sure everything's dry and clean, and then we will mask off any components that we don't want want to be painted. Once we have it all masked off, we'll take it And these doors on this paint booth open up will open up the doors, pick the F and B package up with the crane, and take it into the paint booth. We will close the doors. The painter will go in there. He will spray prime coat on the on the package itself. And then before that dries, he's able to spray a top coat on there. Once he sprayed the top coat on there, he exits the booth and he turns on the cure cycle. Heaters come on and then the paint booth heats up to, I believe, a hundred and forty degrees. It holds that for about an hour and a half. Makes that paint dry real good. Gives it a nice durable and nice look to it. So we are still here in the final assembly shop. We are in the YPS Bay right now. As you can see, we are building a couple of refrigerant recirculator packages behind me. We have another one here and then another one over here to my right. So we're utilizing the YPS bay to build food and beverage packages because our our business is very, very good right now, and we've had to repurpose floor space to build food and beverage packages.

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Get your team featuredSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free plan

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale workspace, up to 10 people
One professional video edit a month for qualifying companies
Media requests to your crowd, remote recording, AI writing tools
$0, no credit card, nothing that expires

More Engineering & Construction Insights

Packaging robots can beat labor long term on cost, PMMI argues

Packaging robots can beat labor long term on cost, PMMI argues

PMMI's Tom Egan wrote in Processing Magazine that adding packaging automation and robotics can now be justified as more cost-effective over the long term than the high cost of labor in food, beverage and CPG plants. Separately, Packaging World describes AI-enabled AMRs from ABB and Agilox that automate material movement between packaging stations. The remaining gap is adoption among smaller manufacturers.

  • 01Two reference points for infrastructure-light material movement: ABB's Flexley Mover P603 carries 1,500 kg with sub-centimeter positioning and no floor markers, and Agilox's OFL lifts 800 kg pallets on peer-to-peer fleet software with no central traffic controller, per Packaging World.
  • 02The open ground is small and mid-sized manufacturers: MTC's Mike Wilson counts tens of thousands of UK SMEs with no robotic automation at all and expects cobots to take most of that growth.
  • 03A robotics business case should include procurement, not only line labor: a June 2026 China Journal of Accounting Research study found heavy robot adopters spread buying across more suppliers, gaining resilience but losing inventory efficiency and adding transaction costs.

Sep 18, 2026

Xtellio brings telematics to jobsite tools and heaters

Xtellio brings telematics to jobsite tools and heaters

Xtellio launched a two-tier telematics platform in March 2026: 32 battery-powered Xense sensors for small tools and wired Pro-Xentral devices for excavators, light towers and heaters. The company claims a 10-year battery life. Data is delivered through open APIs, which Xtellio frames as customer ownership of the data, aimed at rental and construction fleets where small assets have gone largely untracked.

  • 01Xtellio’s stated 10-year battery life for its Bluetooth Xense sensors is the key spec to test in the field; if it holds up, tagging hundreds of tools can look like a one-time install rather than a recurring battery-maintenance program.
  • 02For rental houses and contractors running mixed fleets, the sharper question is no longer which machines have telematics but whether the heaters, light towers and hand tools do, and whether that data lands in the same system.
  • 03Open APIs and “data liberation” are part of Xtellio’s pitch, and the coverage frames that as a prompt for RFP questions: what the APIs expose, where data can be sent, and whether customers can take historical data if they switch providers.

Sep 18, 2026

Senate bill would double smart water grants to $50 million a year

Senate bill would double smart water grants to $50 million a year

S. 2388, the Water Infrastructure Modernization Act of 2025, would double an EPA water tech pilot to $50 million a year through 2028. Grants would cover design, construction, training and operations for leak detection, advanced metering and AI analytics, WaterWorld reported. Planning and maintenance stay on the utility's tab.

  • 01Under S. 2388 as WaterWorld describes it, feasibility studies are not grant-eligible, so a utility would have to pay to build the case for a smart water project before applying for help building the project itself.
  • 02The bill's eligible list puts advanced digital design and construction management tools in the same bucket as meters and sensors, which would give a utility's capital delivery team a claim on the same grant as its field operations group.
  • 03The existing pilot program's authorization runs through 2026, per WaterWorld; the bill would extend it to 2028, and its last reported status was 'introduced' as of Aug. 12, 2025.

Sep 17, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512