How to Create Modularity in Data Centers

Edge Data Centers and Modularity: What Does It Really Mean? Modularity in data center construction has been around for over a decade. It began by taking the simple concept of standard, shipping container configurations and converting them into modular data centers but has since evolved into fully designed and prefabricated data center modules. For the…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

·
Share
How to Create Modularity in Data Centers

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

Edge Data Centers and Modularity: What Does It Really Mean?

Modularity in data center construction has been around for over a decade. It began by taking the simple concept of standard, shipping container configurations and converting them into modular data centers but has since evolved into fully designed and prefabricated data center modules.

For the most part, these modules still match shipping container form factors, but they now exhibit designs much better suited for IT implementations with improvements in cost and performance.

The benefits of going modular have made it an intriguing option for many new construction projects – but there are many considerations you’ll need to keep in mind to make any modular project a success.

The Two Central Categories of Modularity in Data Centers

With the emergence of edge computing and increasing demand for IT support and applications closer to the end user, modular design can help organizations save on both implementation time and costs without sacrificing key functionality, scalability or performance.

The challenge, then, is that the term “modularity,” just like the terms “cloud” or even “edge,” can be interpreted in many different ways based on the particular discussion or project at hand.

Let’s try to clear up some of that murkiness. To begin, we’ll better define modularity by splitting it into two main buckets – modular components that are utilized for a traditional data center configuration and fully complete modular IT solutions.

Modular components can literally be any type of data center component that can be placed on a skid or platform, assembled in a factory environment, then shipped to the site for final integration.

This can include chiller systems, power distribution and UPS systems, air handlers, and even modular or segmented data halls (white space) that are shipped onsite. The primary objective of any of these solutions is to improve efficiencies and save on site construction time.

On the other end of the spectrum is what is defined as the prefabricated or modular IT data center. This type of data center is comprised of three primary elements – cooling, power distribution and the IT enclosure.

These systems can be part of an IT solution provided by and IT OEM, can be solution-based and tailored to a specific application and use case, or can be agnostic to the IT application or environment. The challenge is how these elements are designed, sized and configured for your organization’s unique IT application and load.

What to Consider when Choosing a Modular IT Data Center

There is a growing demand for complete IT modular solutions in multiple markets for edge or other specific application deployments. With that growth comes multiple vendors that offer full, end-to-end IT modularization. How these vendors approach modularity is a critical element to understand, as modular solutions do operate differently than more traditional data center implementations.

As an example, modular data centers have a much more tightly coupled power and cooling relationship with the IT than is found in a traditional raised floor data center environment. For cooling, this means that the reaction time is quite a bit different when the IT power load cycles up or down or if the cooling fails.

A good illustration of this is a typical conference room that we will assume holds about 12 people. Further assume that there are seven people in the room one day in July, and the air conditioner stops working. Given the size of the room and the fact that it was sized for more people than are present, you may not even notice the AC is out for quite a while or until air in the room starts to get stuffy.

This is comparable to loosing a CRAC or CRAH unit in a traditional data center where, due to capacity sizing, typical rack IT load, etc., you can potentially lose a cooling unit that may not affect the IT for quite some time, if at all.

Now, assume you are in a car, still in July, with a friend. The AC in the car goes out. You would probably notice it almost immediately, and it would get very uncomfortable very quickly.

This is analogous to how modular closely coupled cooling works. The reaction time if the IT load changes dramatically or you have a cooling failure is much more pronounced and immediate, so you must take that into account in your capacity planning.

Notice we have not mentioned failover, redundancy, N+1, tier levels, etc., which, for any data center, would be part of the planning process. Yes, these elements still matter, but they are considered a bit differently given how failover and redundancy function in a modular application.

For modular IT deployments, TAS recommends that you consider the following elements as part of your planning:

1. Understanding your application and the actual application dynamics. What are you supporting from an IT perspective, how does the application function, and what are the IT load characteristics or power operating ranges you expect to see?

2. How much IT and IT infrastructure do you need to support the application and the use case? How much IT and how many IT racks are you going to deploy to support the application requirements, and what is the kW/rack load dynamics?

3. What other factors affect your IT application or sizing requirements?

From the above information, you can start to size and optimize your modular solution to your actual application and IT operating environment. This will allow you to better optimize IT infrastructure elements, module costs and final operating costs.

This approach also allows you to optimize for your actual application using the three elements of modularity we discussed earlier – power, cooling and the IT enclosure matching each to your specific application and operating requirements.

Working Alongside TAS to Find Your Ideal Solution

With those two central categories of modular data centers in mind, you can better approach your own project and find the right solution for your needs. You’ll need to consider available site construction time, overall timeline, costs and more, but you’ll be more informed to think about these factors in a meaningful way.

Here are a few other key considerations you’ll need to keep in mind:

– Do you have a very specific location in mind? Traditional, stick-built data centers require more rigidity in their placement, while modular solutions can essentially be built anywhere.

– What amount of scalability do you need? Modular construction often offers more ability to expand the data center in the future than traditional construction.

– What about powering the data center, itself? Smaller footprints are typical with modular solutions, which can mean savings on power and cooling costs.

Choosing to partner with an experienced industry leader like TAS can also help ensure you choose the right modular data center solution for you.

TAS leverages a proven and robust supply chain and expert teams, working alongside you to complete the optimal project for you. To learn more, contact TAS today.

—

Follow us on social media for the latest updates in B2B!

Twitter – @MarketScale

Facebook – facebook.com/marketscale

LinkedIn – linkedin.com/company/marketscale

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

IndexBox sees panelized buildings growing 5.3% a year if panel plants keep up

IndexBox sees panelized buildings growing 5.3% a year if panel plants keep up

IndexBox forecasts the global panelized buildings market to grow 5.3% a year from 2026 to 2035, with residential housing at about 45% of 2026 demand. Factory capacity is the catch. Limited mass timber and specialized steel framing capacity will hold growth back in some regions, and IndexBox expects investment in new plants and automation to ease those bottlenecks by the late 2020s.

  • 01Panels swap scarce framing crews for factory hours, and through the late 2020s the factory hours for mass timber and specialized steel framing are scarce too.
  • 02Housing is 45% of panelized demand, but commercial and institutional projects are expected to grow faster because owners are paying for schedule certainty; warehouse and campus owners are closest to that shift.
  • 03Volumetric modular plants are estimated to need 60% to 70% utilization to break even, so the useful question for a panel supplier is how far out the specific production line is booked.

Nov 11, 2026

Requests for Paebbl's carbon-storing cement substitute far outstrip what it can produce

Requests for Paebbl's carbon-storing cement substitute far outstrip what it can produce

Rebond 300 replaces up to 30% of cement in concrete with no equipment changes. In a Holcim and Goldbeck floor slab trial at C30/37, its workability, setting time and finishing matched the reference mix. Demand exceeds what Paebbl can produce, and closing that gap is now its main challenge.

  • 01After Rebond 300 runs through a standard ready-mix plant and hits C30/37 with no schedule change, buyers’ next questions shift to supply and allocation—how many tonnes Paebbl can ship—alongside price and how much of the mix to commit.
  • 02If Rebond 300 displaces up to 30% of cement yet can cut embodied carbon by up to 40%, the figures imply a negative footprint beyond simple substitution; Paebbl cites a verified -149 kg CO2e per tonne of product, with results depending on mix design.

Nov 11, 2026

ABC's Hensel Phelps Diverge partnership puts field tests ahead of vendor demos

ABC's Hensel Phelps Diverge partnership puts field tests ahead of vendor demos

Carolinas contractors need field-tested evidence on new tools now. ABC's Construction Backlog Indicator reached 8.7 months in September, yet more than a quarter of contractors expect thinner margins.

  • 01A contractor with 8.7 months of work booked has time to pilot new tools. A contractor expecting thinner margins has less room to pay for a tool that only worked in the demo.
  • 02Diverge tests construction tools in controlled pilots and on active jobsites, and ABC can pass along what holds up. Contractors still need to choose what to pilot and define the metric that will decide it.
  • 03In South Carolina, a 1099 specialist brought in to run a tech pilot faces two separate state classification tests. Passing one does not settle the other.

Nov 10, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512