Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

Building a Drone Infrastructure Using UAS Traffic Management: Drones in America

Welcome to this week’s episode of “Drones in America,” a MarketScale podcast hosted by Grant Guillot. Guillot leads the Unmanned Aircraft Systems Practice Team for Adams and Reese, a law firm that practices across the Southern U.S. and in Washington, D.C. On “Drones in America,” Guillot and industry leaders, influencers and experts explore the rapidly growing commercial drone industry…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share
Building a Drone Infrastructure Using UAS Traffic Management: Drones in America

Get featured

Want to get featured in MarketScale Engineering & Construction?

Create a free MarketScale workspace and get your company's expertise featured across our Engineering & Construction coverage. No credit card, no demo required.

Request an invite

Welcome to this week’s episode of “Drones in America,” a MarketScale podcast hosted by Grant Guillot.

Guillot leads the Unmanned Aircraft Systems Practice Team for Adams and Reese, a law firm that practices across the Southern U.S. and in Washington, D.C.

On “Drones in America,” Guillot and industry leaders, influencers and experts explore the rapidly growing commercial drone industry in the U.S., guiding you through the complex web of technology, policy and more.

In this week’s episode, which focuses on unmanned aircraft systems (“UAS”) traffic management (“UTM”), Guillot is joined by Amit Ganjoo, Founder and CEO of ANRA Technologies, and Ken Stewart, CEO of AiRXOS, part of GE Aviation

ANRA is an official NASA collaborator for their UTM solution and is closely working with NASA and the FAA-approved UAV test sites. ANRA’s platform has been used for multiple UTM national campaigns as well as FAA Research Transition Team (“RTT”) demonstrations.

AiRXOS, part of GE Aviation, provides reliable, safe UTM platforms, a wide-range of regulatory services, and powerful hardware, thereby expanding advanced operations and safely integrating unmanned traffic into the National Air Space (“NAS”).

The FAA defines UTM as a “traffic management” ecosystem for uncontrolled operations that is separate from, but complementary to, the FAA’s Air Traffic Management (“ATM”) system. UTM development will ultimately identify services, roles and responsibilities, information architecture, data exchange protocols, software functions, infrastructure, and performance requirements for enabling the management of low-altitude uncontrolled drone operations. In short, UTM provides the FAA, drone operators, and other stakeholders with the means to communicate and coordinate efforts.

ANRA and AiRXOS were participants in Phase 1 and have been selected to participate in Phase 2 of the UTM Pilot Program (“UPP), an initiative established by the FAA to define an initial set of industry and FAA capabilities required to support UTM operations. The UPP is meant to foster infrastructure to manage the widespread expansion of drone operations within the NAS, including goods delivery, infrastructure inspection, search and rescue, and agricultural monitoring.

Guillot, Ganjoo, and Stewart also discuss the importance of BVLOS (beyond the visual line of sight) operations, Remote ID, and the efforts of industry leaders and groups such as Lisa Ellman with the Commercial Drone Alliance to encourage public acceptance of drones.

Catch up on all episodes of Drones In America!

Join host Grant Guillot of the law firm, Adams and Reese for Drones in America with new episodes available where ever podcasts are found.

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Get your team featuredSee how it works15 minutes, straight to a calendar.

Follow Engineering & Construction Insights

Get new expert content in your inbox.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

HUD’s 24-month mass timber modular project goes after the cost driver: shipping the modules

HUD’s 24-month mass timber modular project goes after the cost driver: shipping the modules

HUD is funding a 24-month Washington State University project to redesign modular housing modules around transport and fast site assembly. Shipping is the design constraint. A 2023 Journal of Building Engineering review of 2009–2021 modular CLT projects suggests faster construction timelines, but logistics choices still decide feasibility.

  • 01In modular housing, transportation is becoming a first-order engineering spec, the module that is cheapest to build can still be the most expensive to move.
  • 02The 2023 review found 2D modular CLT projects were, on average, transported farther and built faster than 3D ones, so configuration choice shapes both transport reach and install time.

Sep 5, 2026

Insurance and moisture controls now dictate mass timber schedules

Insurance and moisture controls now dictate mass timber schedules

Mass timber can go up as little as one day per floor. But builder’s risk and property insurance can be harder to place and pricier, largely tied to moisture exposure during construction. Metropolis says mass timber is mainstreaming across North America.

  • 01The schedule advantage is real, but it is only bankable if the project has a funded moisture-control plan from mill to dry-in.
  • 02Insurance has become an early design input for mass timber, forcing owners to lock in risk controls and documentation before procurement.
  • 03For mid-rise and campus projects, mass timber’s headline benchmark is cycle time per floor, which shifts schedule risk onto crane picks, staging, moisture protection, and inspection windows.

Sep 5, 2026

Dallas is still building big, but U.S. apartment deliveries fell 41%

Dallas is still building big, but U.S. apartment deliveries fell 41%

Apartment deliveries in the U.S. decreased by 41% in the first half of 2026, according to Yardi Matrix data. Despite this national trend, Dallas/Fort Worth led in both multifamily and industrial deliveries.

  • 01Apartment deliveries in the U.S. dropped 41% in H1 2026.
  • 02Dallas/Fort Worth led the nation in multifamily and industrial deliveries.

Aug 29, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512