Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

BEING GREEN MATTERS AT PRESCO

As a leading manufacturer of outdoor marking materials, it’s clear that these materials must be durable. But at Presco, we’re also concerned with how we can reduce our environmental impact. That’s why our manufacturing processes are specifically focused on sustainability, including: Formulating vinyl to use bio-based raw materials Purchasing post-industrial PVC scrap for use in…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share

Get featured

Want to get featured in MarketScale Engineering & Construction?

Create a free MarketScale workspace and get your company's expertise featured across our Engineering & Construction coverage. No credit card, no demo required.

Request an invite

As a leading manufacturer of outdoor marking materials, it’s clear that these materials must be durable. But at Presco, we’re also concerned with how we can reduce our environmental impact. That’s why our manufacturing processes are specifically focused on sustainability, including:

  • Formulating vinyl to use bio-based raw materials
  • Purchasing post-industrial PVC scrap for use in production orders when formulations permit
  • Mixing internal scrap into product orders when applicable
  • Recycling all start up and edge trim scrap into production orders in real-time

In addition to our PVC production processes, Presco added Ethylene Vinyl Acetate (EVA) film extrusion to our capabilities. A member of the polyolefin family, EVA is different than PVC, containing no plasticizers, making it an eco-friendlier alternative to PVC.

Can PVC Products be Eco-Friendly?

Many of our customers have often inquired about how our materials are made and if they include any recycled material. Product lines we manufacture, such as the film supplied for our safety marking products, sewer ducting, and other industrial product lines, have up to 40% of post-industrial regrind content. That percentage is equal to over one million pounds of PVC film that doesn’t end up in our planet’s landfills. Regrind also lowers the formulation cost for customers, so it’s something we’re passionate about continuing.

The PVC Regrind Process

For those products which necessitate the inclusion of PVC, we’ve found that allowing regrind back into general purpose formulations is a concerted way to promote sustainability within PVC manufacturing. At Presco, PVC scrap is processed through our onsite grinders into smaller bits—similar in size and texture to confetti. The regrind is then divided by color and stored until a color and formulation opportunity occurs to reuse the scraps. Regrind is then added to the batches in the compounding process and mixed directly into the PVC dry blend compound. This regrinding keeps tons of PVC from sitting in landfills while reducing the overall amount of PVC debris in the world. Regrind, when used in formulations, also reduces the price of the material, providing significant cost savings to our customers.

Presco Also Offers Biodegradable Flags and Staffs

To further our efforts of responsible, sustainable product manufacturing, Presco also offers a range of biodegradable marking products. Non-toxic to humans, animals, and the environment, our biodegradable flags and are made of non-woven rayon cellulosic material derived from wood pulp. Attached to an all wood 24” staff, Presco’s biodegradable marking flags guarantee complete degradation of the entire product.

No matter what type of film or marking product you need, Presco has the solution, and you can be assured that the solution comes from a company dedicated to reducing its environmental impact. Explore all our capabilities today.

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Get your team featuredSee how it works15 minutes, straight to a calendar.

Follow Engineering & Construction Insights

Get new expert content in your inbox.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

HUD’s 24-month mass timber modular project goes after the cost driver: shipping the modules

HUD’s 24-month mass timber modular project goes after the cost driver: shipping the modules

HUD is funding a 24-month Washington State University project to redesign modular housing modules around transport and fast site assembly. Shipping is the design constraint. A 2023 Journal of Building Engineering review of 2009–2021 modular CLT projects suggests faster construction timelines, but logistics choices still decide feasibility.

  • 01In modular housing, transportation is becoming a first-order engineering spec, the module that is cheapest to build can still be the most expensive to move.
  • 02The 2023 review found 2D modular CLT projects were, on average, transported farther and built faster than 3D ones, so configuration choice shapes both transport reach and install time.

Sep 5, 2026

Insurance and moisture controls now dictate mass timber schedules

Insurance and moisture controls now dictate mass timber schedules

Mass timber can go up as little as one day per floor. But builder’s risk and property insurance can be harder to place and pricier, largely tied to moisture exposure during construction. Metropolis says mass timber is mainstreaming across North America.

  • 01The schedule advantage is real, but it is only bankable if the project has a funded moisture-control plan from mill to dry-in.
  • 02Insurance has become an early design input for mass timber, forcing owners to lock in risk controls and documentation before procurement.
  • 03For mid-rise and campus projects, mass timber’s headline benchmark is cycle time per floor, which shifts schedule risk onto crane picks, staging, moisture protection, and inspection windows.

Sep 5, 2026

Dallas is still building big, but U.S. apartment deliveries fell 41%

Dallas is still building big, but U.S. apartment deliveries fell 41%

Apartment deliveries in the U.S. decreased by 41% in the first half of 2026, according to Yardi Matrix data. Despite this national trend, Dallas/Fort Worth led in both multifamily and industrial deliveries.

  • 01Apartment deliveries in the U.S. dropped 41% in H1 2026.
  • 02Dallas/Fort Worth led the nation in multifamily and industrial deliveries.

Aug 29, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512