Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

April Showers Bring More Than May Flowers

Just as warmer weather and rising humidity can affect mood and clothing decisions, it can also impact the performance and appearance of walk-in coolers or freezers. That’s why spring is the perfect time to assess equipment for potential problems to ensure optimal operation during the long, hot months of summer. Failing coolers or freezers can…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Promoted content from KPS Global on MarketScale.

Share
April Showers Bring More Than May Flowers

Just as warmer weather and rising humidity can affect mood and clothing decisions, it can also impact the performance and appearance of walk-in coolers or freezers. That’s why spring is the perfect time to assess equipment for potential problems to ensure optimal operation during the long, hot months of summer.

Failing coolers or freezers can result in massive financial losses. However, Ben Franklin once quoted, “An ounce of prevention is worth a pound of cure,” and there’s no better time than spring to perform a preventative checkup.

Spring Checkup Checklist

  • Check for Undesired Condensation: As spring temperatures warm, the air will hold more moisture and dew point temperatures will increase. As moist air enters a walk-in and is chilled, condensation or frost can appear. This typically occurs on strip curtains, or, if no strip curtains are present, snow or frost may build up and accumulate on product, walls, doors, and racks. Examine strip or air curtains to ensure all air blocking parts are working properly. All vinyl strips are in place and sealing to one another Torn or damaged strips are replaced The strip curtain is properly sized for the door. Adjust air curtain vanes to ensure properly positioned.
  •  Discover Moisture Access Points:  To check that door seals and gaskets are properly sealing, enter the walk-in, close the door, and turn off the unit’s lights. Replace seals and gaskets that allow light to seep in.  Moist air can enter beneath door sweeps if improperly set. Use a screwdriver to accurately adjust door sweeps as necessary—they should be raised or lowered to ensure proper contact with the threshold

While mitigating losses after a failure demonstrates skill, preventing losses in the first place demonstrates intelligence and business acumen. Prevent expensive breakdowns and extend valuable equipment life—prepare for the dog days of summer with a thorough inspection of walk-in coolers and freezers.

To address excess condensation or any equipment maintenance need, contact KPS Global®, the industry-leading manufacturer of insulated panel systems, supplier of aftermarket parts and replacement equipment, and provider of seamless installation services. Their factory-trained service technicians have over 250 years of combined experience and all their work is backed by a 90-day labor warranty. Learn more about KPSG field service solutions at https://kpsglobal.com/services/field-services-tech/.

Read more at kpsglobal.com

KPS Global

Part of this channel

KPS Global

Insulated panel systems for every cold storage application.

Visit the channel →

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one expert. Imagine publishing your whole team.

This article was produced through MarketScale. Create a free workspace and turn your own team's expertise into articles, video, and social posts. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

AI moves from back office to job site in construction's next build-out

AI moves from back office to job site in construction's next build-out

McCarthy Building Companies has entered a multimillion-dollar agreement with Palantir to enhance AI adoption. However, RICS experts highlight that data readiness and organizational culture pose significant challenges. This development signals a shift in integrating AI within construction sectors.

  • 01McCarthy Building Cos. signs a major deal with Palantir.
  • 02Data readiness is a critical hurdle for AI integration.
  • 03Organizational culture impacts AI adoption in construction.

Jul 11, 2026

South Korea commits $7.5 billion to AI-autonomous manufacturing as smart factory count hits 30,000

South Korea commits $7.5 billion to AI-autonomous manufacturing as smart factory count hits 30,000

South Korea is investing $7.5 billion in advancing AI-autonomous manufacturing, with a significant increase in smart factories, now totaling 30,000. The initiative also targets the development of 100 AI manufacturing zones throughout the country.

  • 01South Korea invests $7.5 billion in AI-autonomous manufacturing.
  • 02There are currently 30,000 smart factories in South Korea.
  • 03The government aims to develop 100 AI manufacturing zones.

Jul 11, 2026

Construction's productivity crisis: why ML cost forecasting and off-site methods are converging

Construction's productivity crisis: why ML cost forecasting and off-site methods are converging

U.S. construction productivity has decreased since 1968. Machine learning models and off-site construction methods are becoming pivotal in bridging this productivity gap by providing accurate cost forecasting and efficient building practices.

  • 01U.S. construction productivity has been declining since 1968.
  • 02Machine learning models offer enhanced cost forecasting capabilities.
  • 03Off-site construction methods contribute to improved project efficiency.

Jul 10, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512