Skip to content
‹ Back to IndustriesEngineering & Construction

Applied Digital Redefines Modern Computing with Unmatched Hosting Power for NVIDIA H100 Servers

Applied Digital is a leader in data center infrastructure, focusing on hosting power for NVIDIA H100 servers. The company designs data centers with the capability to handle the demands of AI model training and real-time inference, accommodating higher latencies for training but ensuring low latency for deployment.

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Promoted content from Applied Digital on MarketScale.

By Software And Technology · · AiAi-first Business PodcastApplied DigitalData Center
Share

Key takeaways

01

Applied Digital is reshaping data center infrastructure with a focus on hosting NVIDIA H100 servers.

02

Their facilities are designed to manage heavy-duty AI model workloads, considering latency needs.

03

Wes Cummings discusses the unique challenges of AI training and inference in a podcast episode.

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

As the digital landscape continues to evolve at a rapid pace, Applied Digital emerges as a key player in reshaping data center infrastructure. In a recent episode of the AI-First Business Podcast, the spotlight was on Applied Digital’s pioneering approach to meeting the burgeoning demands of modern computing.

Host Tina Yazdi welcomed Wes Cummings, CEO and Chairman of Applied Digital, to discuss the revolutionary high-power density data centers that are setting new standards in the industry. The conversation delved into the unique challenges and solutions in hosting multiple Nvidia H100 servers, a task beyond the capabilities of conventional data centers. Cummings highlighted the company’s focus on building facilities specifically designed for heavy-duty workloads like AI training, which require extensive computational power and can tolerate higher latency.

Applied Digital’s facilities are engineered to efficiently manage these tasks, even with higher latency levels.
— Wes Cummings, CEO and Chairman at Applied Digital

Cummings explained the technical nuances of AI model training, a process central to technologies like ChatGPT. He emphasized the need for data centers capable of handling the immense power requirements and data transfers involved in training AI models. Unlike traditional data centers, Applied Digital’s facilities are engineered to efficiently manage these tasks, even with higher latency levels. This design is particularly crucial for the training phase of AI, where large amounts of data are processed over extended periods.

Furthermore, Cummings discussed the role of these data centers in the inference phase of AI, where trained models are deployed in lower latency environments for real-time interactions. He stressed that while training can tolerate higher latencies, the inference phase demands environments with lower latency for optimal performance.

While training can tolerate higher latencies, the inference phase demands environments with lower latency for optimal performance.

Part of this channel

Applied Digital

News, updates, and expert insights from Applied Digital.

Visit the channel

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.

About the author

SA
Software And Technology
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

North Texas Data Centers Boom, Mechanical Trades Constrain

North Texas Data Centers Boom, Mechanical Trades Constrain

Mechanical trades now shape liquid-cooled data center schedules

  • 01DFW data center construction faces mechanical workforce constraints
  • 02Mechanical trades are crucial for data center deployment timelines.

Nov 2, 2026

Brock's 3D scaffold model replaced 1,400+ standby hours with <25

Brock's 3D scaffold model replaced 1,400+ standby hours with <25

Brock Group executives Enrique Zavala and Brent Roscoe argue scaffolding belongs in the BIM model from the start of an industrial project. BIC Magazine reports one Brock 3D model replaced more than 1,400 budgeted standby hours with under 25 hours of rework. Peer-reviewed studies support BIM-based planning and forecasting, while noting scaffold modeling and laser scanning still demand specialized skills.

  • 01On one three-month project, BIC Magazine reports, a Brock 3D scaffold model left one minor field change and under 25 labor hours of rework against more than 1,400 budgeted standby hours.
  • 02A 2017 IAARC paper found scaffolding is usually left out of the BIM model, and a June 2024 MDPI case study found scan-to-BIM needs specialized equipment and skills, so the gains are not automatic.

Nov 2, 2026

CivDot robots shift surveyors to control and spot checks

CivDot robots shift surveyors to control and spot checks

On robotic layout jobs, the surveyor's work shifts to setting control and spot-checking the machine's marks.

  • 01On robotic layout jobs, the surveyor keeps the control network and the spot checks, the two tasks that decide whether thousands of machine-set marks are right.
  • 02Autonomy is most advanced offshore and underground, where work is risky and costly; routine low-risk jobs are adopting it more slowly.

Nov 1, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

About the Experts

SA
Software And Technology
WC
Wes Cummings

CEO and Chairman

Applied Digital

Wes Cummings leads Applied Digital as the CEO and Chairman. He focuses on building high-power density data centers designed for AI workloads.

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512