Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

AI Is Forcing a Rethink of Data Center Infrastructure at Every Level

AI workloads are driving unprecedented growth in data center power density, with average rack densities more than doubling in two years and global demand projected to triple by 2030. Greg Crumpton and Matt Caldwell of Hyper Solutions discuss how modular manufacturing models and digital-first processes can help the industry scale. They also highlight a critical skilled labor shortage that threatens to constrain infrastructure buildout if not addressed at the education pipeline level.

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Promoted content from Straight Outta Crumpton on MarketScale.

By Greg Crumpton · Artifical IntelligenceData Center DemandsData Center InfrastructureHyper Solutions
Share

Key takeaways

01

Average rack power densities have more than doubled in two years — from ~8 kW to 17 kW — and are expected to reach 30 kW by 2027.

02

Hyper Solutions operates nine UL-listed satellite manufacturing facilities using a unified digital process to deliver scalable, consistent power infrastructure.

03

A growing skilled labor gap threatens data center expansion, making early recruitment at the high school and middle school level increasingly urgent.

Get featured

Want to get featured in MarketScale Engineering & Construction?

Create a free MarketScale workspace and get your company's expertise featured across our Engineering & Construction coverage. No credit card, no demo required.

Start free

The data center industry is being redefined by AI’s demand for faster, denser, and more scalable infrastructure. According to McKinsey, average rack power densities have more than doubled in just two years. It went from approximately 8 kW to 17 kW, and is expected to hit 30 kW by 2027. Global data center power demand is projected to triple by 2030, reaching 170–220 gigawatts. This rapid growth is forcing a redesign of traditional infrastructure, placing unprecedented strain on utilities, manufacturers, and the skilled labor pipeline.

Can infrastructure and workforce capacity scale quickly enough to meet AI’s surging data center demands without breaking the system?

On Straight Outta Crumpton, host Greg Crumpton welcomes Matt Caldwell, Director of AI/Cloud Data Centers at Hyper Solutions, for a candid conversation about the pressures shaping the modern data center ecosystem. They discuss how AI workloads are upending long-established design norms, why modular manufacturing may offer a more resilient solution, and how labor shortages threaten to slow the entire market. Caldwell also shares how Hyper’s unique digital-first model enables scalable, repeatable quality across a distributed manufacturing network.

Key Highlights:

  • Density Rewrites the Rulebook: Traditional data centers were designed around ~4 kW racks; today’s AI applications require vastly more, prompting major shifts in cooling, power, and facility planning.
  • Hyper’s Scalable Manufacturing Model: Hyper Solutions produces PDUs, RPPs, and switchboards through a network of nine UL-listed satellite facilities, all driven by a unified digital process that ensures consistency and real-time visibility.
  • Workforce Urgency: Caldwell underscores a critical labor gap, urging the industry to recruit earlier, targeting high school and even middle school students to meet the rising demand for trades and technical expertise in construction and operations.

Matt Caldwell is a seasoned data center executive with over 20 years of experience supporting hyperscale and colocation clients across AI and cloud infrastructure. He has led global account strategy and mission-critical operations at industry leaders including Schneider Electric, Siemens, Trane, and Albireo Energy. Caldwell specializes in scalable design, modular power systems, and digital-first infrastructure delivery and now serves as the Director of AI/Cloud Data Centers at Hyper Solutions.

Straight Outta Crumpton

Part of this channel

Straight Outta Crumpton

Greg Crumpton on why relationships are the foundation of business

Visit the channel

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Get your team featuredSee how it works15 minutes, straight to a calendar.

About the author

Greg Crumpton
Greg CrumptonVice President

Straight Outta Crumpton Greg's personal & professional goals are to serve the people that he am working with and/or for. He carries this mantra in his professional life and his home life. Having 40+ years as a full-service mechanical and mission critical environments contractor with a heavy emphasis on service, maintenance and repair. Greg specialize in mission critical cooling (Heat Rejection) and electrical infrastructures, as well as the comfort cooling surrounding them. As a continual entrepreneur, several markets strike him as interesting. As varied as you could imagine, they range from Coffee with my bud's at www.CommonPlaceCoffee.com, all the way to serving as an adviser for several start-ups in the emerging technology world via www.aGlobalVenture.com & www.AtomPower.com and others. Giving back to his community is of equal importance to him, www.apparo.org and Animal Welfare are just a couple ways of doing just that.

Follow Engineering & Construction Insights

Get new expert content in your inbox.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free plan

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale workspace, up to 10 people
One professional video edit a month for qualifying companies
Media requests to your crowd, remote recording, AI writing tools
$0, no credit card, nothing that expires

More Engineering & Construction Insights

Caterpillar and FieldAI partner on physical AI for jobsites

Caterpillar and FieldAI partner on physical AI for jobsites

Caterpillar announced a collaboration with robotics company FieldAI on Sept. 5, 2026, aimed at bringing physical AI and autonomous systems to construction sites and industrial environments, according to Automation News. The companies plan to combine Caterpillar's operational data and engineering with FieldAI's robot foundation models, along with NVIDIA computing and digital twin tools.

  • 01Caterpillar and FieldAI are combining industrial expertise with AI-enabled robot foundation models for construction and industrial site automation.
  • 02Planned applications include autonomous inspections for safety, digital twins for operational insight, and AI-driven simulation for industrial operations.
  • 03The partnership will use NVIDIA accelerated computing and NVIDIA Omniverse for robot-agnostic autonomy technology across multiple robotic platforms.

Sep 11, 2026

Distressed sales are 2% of the housing market, and that should change how contractors plan 2027

Distressed sales are 2% of the housing market, and that should change how contractors plan 2027

Existing home sales fell to 3.98 million in August, but distressed sales remain at just 2% of transactions with prices still rising, signaling an affordability freeze rather than a credit crisis. Residential builders and contractors should plan 2027 capacity around intact homeowner equity, higher inventory creating pre-sale work demand, and regional variations in turnover rather than cutting headcount for a financial downturn.

  • 01Distressed sales at 2% of market (versus roughly one-third during 2008) mean no forced-seller wave or equity destruction, leaving HELOC and cash-out renovation funding intact for contractors
  • 02Supply at 4.9 months and 5.9% year-over-year growth forces sellers to fund pre-sale work on roofs, HVAC, kitchens, and inspections to compete, generating small-ticket trade demand despite lower transaction volume
  • 03Year-to-date sales up 1.6% with 27% all-cash buyers and 15% investor purchases plus strong August wage growth (3.1%) and employment (643,000 jobs since January) support demand in rate-insensitive buyer segments

Sep 10, 2026

JE Dunn Adds Power Generation Unit as Data Centers Grow

JE Dunn Adds Power Generation Unit as Data Centers Grow

JE Dunn Construction announced on Aug. 26, 2026 that it created a power generation unit within its advanced technology group and appointed Ryan Wilson to lead it, according to Construction Dive. The move follows a broader rise in power-related construction work tied to data centers, manufacturing and aging infrastructure.

  • 01JE Dunn named Ryan Wilson, a senior project manager with power and industrial experience, as VP and market lead for its new power generation unit.
  • 02Planned U.S. data center projects increased 203% in five months (March to August 2026), from 666 to 2,019, with Virginia leading at 458 planned projects.
  • 03Power work generates roughly 35% to 40% of Canadian firm WSP Global's U.S. revenue, Clayco launched a power and energy unit in March 2026, and Kiewit and Bechtel were selected for a $33 billion Ohio power project.

Sep 9, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

About the Experts

Greg Crumpton, host of Straight Outta Crumpton
Greg Crumpton

Host, Straight Outta Crumpton

Greg Crumpton is the host of Straight Outta Crumpton, a weekly podcast focused on the art of networking and relationship-building in business services. He is a veteran of the skilled trades and facilities services industry with decades of experience. Crumpton regularly engages top influencers across business services, construction, and infrastructure sectors.

MC
Matt Caldwell

Director of AI/Cloud Data Centers

Hyper Solutions

Matt Caldwell is a data center executive with over 20 years of experience supporting hyperscale and colocation clients across AI and cloud infrastructure. He has led global account strategy and mission-critical operations at Schneider Electric, Siemens, Trane, and Albireo Energy. At Hyper Solutions, he specializes in scalable design, modular power systems, and digital-first infrastructure delivery.

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512