Advanced Automation: How an Industrial Contracting Project Manager Handles Supply Chain

Project managers play key roles in ensuring that jobs stay on track, on time and on budget; and the supply chain challenges over the last two years have made their job even harder. Advanced Automation Host Josh Gravelle welcomed Jeff Smith, project manager of Boulter Industrial Contractors, to share how his company minimizes the strain. Boulter, an industrial…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share

Get featured

Want to get featured in MarketScale Engineering & Construction?

Create a free MarketScale workspace and get your company's expertise featured across our Engineering & Construction coverage. No credit card, no demo required.

Start free

Project managers play key roles in ensuring that jobs stay on track, on time and on budget; and the supply chain challenges over the last two years have made their job even harder. Advanced Automation Host Josh Gravelle welcomed Jeff Smith, project manager of Boulter Industrial Contractors, to share how his company minimizes the strain. Boulter, an industrial contracting company since 1892, provides transportation, rigging, steel fabrication, custom crating and packaging, and more.

At Boulter, Smith manages logistical projects for just about any customer needs and enjoys the variety, planning and coordination involved. Reciprocatively, customers appreciate the partnership with Boulter since they only work with one contractor to handle any project needs.

However, the pandemic has thrown a wrench in the supply chain, and Boulter immediately felt the pains. “Materials for crating and packaging have been an issue with lumber shortage. The steel shop has, too,” Smith explained. “Things we could get next-day now could have a lead time of eight weeks.”

Smith described how many projects, like a brewery in Rochester, came to a halt: “The project was underway, and then the pandemic hit. The job site wasn’t ready, so we received the tanks and stored them until they were ready.” Thankfully, once construction began, Boulter could finish the project, delivering and installing the catwalks successfully.

Smith continued to talk about how Boulter is taking measures to minimize the supply chain issues, such as:

  • Ensuring superior internal and external communication
  • Logging accurate paperwork
  • Accounting for delays in scheduling
  • Ordering early and extra resources
  • Investing in new technology

For more information on manufacturing, storage, shipping and transportation needs, contact Boulter today.

Video TranscriptExpand ↓

Welcome to Advanced Automation, a podcast by Calvary Robotics, where you'll find industry leaders and experts sharing their thoughts on the world of automation. Hello, everyone, and thanks for listening. I'm Josh Gravel, your host for this installment of Advanced Automation. Today, we have with us Jeff Smith. Jeff Smith is a project manager for Bolter Industrial Contractors. Jeff began his career as an ironworker apprentice in nineteen ninety eight before transitioning through the ranks to his current role as project manager in twenty thirteen. With a concept to execution approach and extensive knowledge of steel fabrication, rigging, and preventative maintenance programs, Jeff successfully oversees a range of projects while adhering to the customer's deadline, budget, and scope of work. Jeff, thanks so much for being here. Thank you. So I kinda wanted to start off with having you take us through your timeline, past up to now. You know, early life, schooling, career, that sort of thing. Sure. Early life. I, grew up in Walworth, New York. I moved away for a couple years and moved right back to, the house across the street from where I grew up, as a matter of fact. Played a lot of baseball as a kid, but I also worked. I worked a lot on farms, worked for landscapers. Kinda understood that if I wanted to buy something, I needed to work and make some money. Good lessons right there. And for, schooling prior to joining the workforce? Yeah. I went to Wayne Central High School, and from there, I went to SUNY Morrisville. I started out taking forestry. And as, time went on, kinda discovered that there weren't a lot of job opportunities. So I took welding and electrical and carpentry and anything I possibly could that was skilled trade related, knowing that that was probably the direction I was gonna go after school. My father was in the skilled trades all his life. He was a pipe fitter. He worked for Eastman Kodak right in Rochester. And occasionally, on weekends, I would go with him to different jobs. So I would see different projects going on, see the different trades working, and that really sparked my interest in the trades. Wonderful. Good foundation, it sounds like. Yes. Absolutely. So could you give us an overview of a Volter and what goes on for shipping, the rigging, logistics solutions, and, you know, overall how they play into the global and local aspects of, the supply chain? Walter is a hundred and thirty year old company. Started out as a provider for ice and cold delivery service, you know, the horses and horses and buggies. And through the years, expanded the fleet to trucks and tractor trailers, went moved from, the ice and cold delivery to moving just about anything anybody needs moved. We provide a lot of service to our customers from rigging to steel fabrication, creating and packaging. We try to offer as much as we possibly can to help the customer make their life easier when it comes to completing a project. If they can do more with one contractor, it's a lot easier than having to farm out to several different contractors to complete a project. Absolutely. And I know that Calvary and Volter have had a long relationship, and you've the guys have been wonderful for us over the many years. Speaking of that, how many projects do you think you've managed in your career now? I don't even know how I would count the number of projects. There's been many. A project can be from a half a day to a couple weeks long to several months long to to years. Each one's very interesting. Every project from the four hour project to the month long project is a lot of planning and coordination, between the rigging and transportation scheduling. Scheduling is a big one, for sure. Staying in contact with the customer is is very important. Yeah. Especially as the project manager, I would think. Yes. Absolutely. Can you tell us about one of the more challenging projects that kinda sticks out to you? We recently installed some new tanks for the High Falls Brewery in, downtown Rochester. These are exterior tanks. They were seventy foot tall, fourteen foot in diameter. And, the project was underway, and then the pandemic hit. So the job site wasn't quite ready to receive the tanks, which were already fabricated on their way. So to try and help out the customer as best we could, we had them deliver the tanks right to our yard and said, you know what? We'll take it off your shoulders, we'll unload the tanks to our yard and store them until, you know, the dust settles a little bit and you guys get your groundwork done and you're ready for the tanks. So we did that. We received the tanks. We stored them. And then when the brewery was ready for them, we loaded the tanks up, took them from Webster to Rochester, offloaded the tanks, stood each one individually, tied them all together with catwalks, and created the the finished product that the brewery is looking for with these new tags so they could get them get them piped and get them ready for action. Now correct me if I'm wrong, but there's a nice little video of that either on LinkedIn or YouTube channel that people could check out to see even more about that. Is that right? Yes. That is correct. Yeah. It's quite the project. So as a subcontractor, how have delays and shortages in the supply chain affected business for you? Delays and shortages, have really affected us with materials. Our crating and packaging shop, seeing lumber shortages, lumber price increases, and same with our steel shop. A lot of materials that used to be able to get next day, we may be waiting three, four, up to eight weeks to get some of the materials now. Even though they're they're common, they're just not available. Delays, there's a lot of delays in trucking, which affects our machine installation projects. There may be a project that's been on the books for months that gets delayed because machines are delayed in transit. We're just not receiving them on them on time. These delivery delays really change our schedule on a daily basis. Yeah. Just gotta react to whatever new challenge is thrown at you, I'm sure. Yes. So what measures does Volter has Volter taken to eliminate what they can for these delays or minimize them? We stay in constant communication with our customers and the vendors. Everybody that's involved in a project, we all need to stay in constant communication. If lead times change for a machine that's being built for a customer that's gonna delay that project, We may be able to work with another customer whose machine is running on time or ahead of schedule and just, you know, work with every customer to change our schedule around to try and accommodate everybody as best we can to get everybody's project done and in the time frame that they're looking to get it completed in. Right. So everyone has dealt with shipping delays or shortages during the pandemic. Is there anything that companies can do to better manage their projects to avoid, you know, additional supply chain related stress? A lot of it starts with the paperwork, making sure all the paperwork is in order for for shipping. It's the slightest little thing can hold a sea container or a trailer up at at a port or anywhere where it needs to move from, and it it could delay transportation for for weeks, really, if the paperwork's not in order. Customers, really, because our voice had to deal with the delays and the shortages, a lot of the customers have learned how to account for it. When they're making project schedules, they know that that schedule is liable to slip a little bit due to these delays and the shortages. But everybody's done really well and has tried to avoid setting unrealistic, you know, benchmarks or schedules just knowing that there's possible delays to be dealt with. Yeah. We need a flexibility clause written into all our contracts, I think, at this point. Yes. Correct. And then currently, everyone's kind of got the idea that order early, order extra, and expect delays. Do you think this is the new standard or that things will go back to a prepandemic status status? I feel this is gonna be the new standard for a while. I don't see everything going back to pre pandemic status a hundred percent, but there's there's good reason. There's some positive changes to consider, the way people are dealing with the delays and the shortages. Like I mentioned before, schedules aren't quite as aggressive as they as they used to be. Not all of them. Some are still pretty aggressive, but we we do what we can. Right. It's just the pre pandemic status, I don't think we're gonna see that again for a while. I think it's just dealing with the changes on a day to day basis. And and like I said, customers are doing really well with with dealing with it. Yeah. Considering it's global, I think everybody since everyone's affected, it has to realize that this is going to be part of it, you know? Sure. Have you witnessed any new and emerging technologies that are being used to combat, you know, the supply chain slowdowns? We're seeing a a lot more robotics, smart warehousing, meaning material handling robots inside of warehouses, automated robots for moving materials around. As far as Boulter's concerned, we may eventually see driverless trucks. You know, there's a lot of technology out there. Who knows what's, what's to come? You never know. Yeah. It's exciting exciting time. How speaking of exciting, can you tell us about anything that's happening at Boulter that everyone should know about? In the last year, we actually built a new warehouse, so we create a lot of storage space for a lot of new customer materials and new machines that come in. For ourselves, we've bought a lot of new new equipment, forklifts, trailers, stuff that we use every single day on a day to day basis to complete our projects. Outside of Boulter, we try to work a lot with up and coming possible employees, like kids in BOCES programs. Next May, we're gonna be hosting a career day for BOCES students to kinda introduce them to the skilled trades and and the different aspects of it to see if there's kids that are coming through the ranks that are gonna be interested in in working the skilled trades. That's wonderful. And could you say one more time for the listeners what when is that is happening? That is May seventeenth. Alright, mark your calendars everyone. So Jeff, you talked about living in the greater Rochester region your whole life and what what's about Rochester that keeps you living here and working here and other favorite aspects? Sure. As far as living here, especially in my small town, Woolworth, it's like I said, I grew up there. I moved away for a little while. I came back because I love the small town atmosphere, the region. I love the weather. I love the changing of the seasons. The the the question it's asked every year is what's in store for this winter. You never know if it's gonna be a terrible winter or not too bad, mild or real cold. I like that. I I don't think I'd like to have the same weather possibly all year long. Working in the area, there's so many different businesses that do so many different things that there's there's never the same project twice. Every project is different. And I I think that's there's a lot to be said for all the different businesses in the area. I agree. I totally agree with you. So to wrap it up, what is the best way for our listeners to get in touch with you or Bolter? Listeners can visit bolterindustrial dot com, for more information on Bolter. You're certainly more than welcome to call our office and speak with any of our project managers. We'll help you in any way we possibly can. I'm also gonna include a link in the notes with my digital business card. Well, thanks to you, Jeff, and Bolter for the time. We appreciate it. And to our listeners. Thank you very much. Make sure to subscribe to Advanced Automation wherever you get your podcasts and head over to calvary robotics dot com to listen to other episodes, watch our series, Calvary TV, and lots of other great content about Calvary Robotics. Have a great day.

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Get your team featuredSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free plan

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale workspace, up to 10 people
One professional video edit a month for qualifying companies
Media requests to your crowd, remote recording, AI writing tools
$0, no credit card, nothing that expires

More Engineering & Construction Insights

Packaging robots can beat labor long term on cost, PMMI argues

Packaging robots can beat labor long term on cost, PMMI argues

PMMI's Tom Egan wrote in Processing Magazine that adding packaging automation and robotics can now be justified as more cost-effective over the long term than the high cost of labor in food, beverage and CPG plants. Separately, Packaging World describes AI-enabled AMRs from ABB and Agilox that automate material movement between packaging stations. The remaining gap is adoption among smaller manufacturers.

  • 01Two reference points for infrastructure-light material movement: ABB's Flexley Mover P603 carries 1,500 kg with sub-centimeter positioning and no floor markers, and Agilox's OFL lifts 800 kg pallets on peer-to-peer fleet software with no central traffic controller, per Packaging World.
  • 02The open ground is small and mid-sized manufacturers: MTC's Mike Wilson counts tens of thousands of UK SMEs with no robotic automation at all and expects cobots to take most of that growth.
  • 03A robotics business case should include procurement, not only line labor: a June 2026 China Journal of Accounting Research study found heavy robot adopters spread buying across more suppliers, gaining resilience but losing inventory efficiency and adding transaction costs.

Sep 18, 2026

Xtellio brings telematics to jobsite tools and heaters

Xtellio brings telematics to jobsite tools and heaters

Xtellio launched a two-tier telematics platform in March 2026: 32 battery-powered Xense sensors for small tools and wired Pro-Xentral devices for excavators, light towers and heaters. The company claims a 10-year battery life. Data is delivered through open APIs, which Xtellio frames as customer ownership of the data, aimed at rental and construction fleets where small assets have gone largely untracked.

  • 01Xtellio’s stated 10-year battery life for its Bluetooth Xense sensors is the key spec to test in the field; if it holds up, tagging hundreds of tools can look like a one-time install rather than a recurring battery-maintenance program.
  • 02For rental houses and contractors running mixed fleets, the sharper question is no longer which machines have telematics but whether the heaters, light towers and hand tools do, and whether that data lands in the same system.
  • 03Open APIs and “data liberation” are part of Xtellio’s pitch, and the coverage frames that as a prompt for RFP questions: what the APIs expose, where data can be sent, and whether customers can take historical data if they switch providers.

Sep 18, 2026

Senate bill would double smart water grants to $50 million a year

Senate bill would double smart water grants to $50 million a year

S. 2388, the Water Infrastructure Modernization Act of 2025, would double an EPA water tech pilot to $50 million a year through 2028. Grants would cover design, construction, training and operations for leak detection, advanced metering and AI analytics, WaterWorld reported. Planning and maintenance stay on the utility's tab.

  • 01Under S. 2388 as WaterWorld describes it, feasibility studies are not grant-eligible, so a utility would have to pay to build the case for a smart water project before applying for help building the project itself.
  • 02The bill's eligible list puts advanced digital design and construction management tools in the same bucket as meters and sensors, which would give a utility's capital delivery team a claim on the same grant as its field operations group.
  • 03The existing pilot program's authorization runs through 2026, per WaterWorld; the bill would extend it to 2028, and its last reported status was 'introduced' as of Aug. 12, 2025.

Sep 17, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512