Skip to content
MarketScale
‹ Back to IndustriesEnergy

VERSATILE WASTEWATER SYSTEMS IN AEROSPACE MARKET

Background The implementation of flexible wastewater system with batch treatment saves aerospace manufacturer money Wastewater treatment within aerospace manufacturing is often a multi-step process, especially for organizations that deal with heavy metals, chemical finishes, and oil and grease. Contaminants such as cadmium cyanide make it difficult for some manufacturers to meet strict discharge limits without…

This story was produced through MarketScale. See how Energy teams put it to work with Customer Stories & Case Studies.

Share
VERSATILE WASTEWATER SYSTEMS IN AEROSPACE MARKET

Get featured

Want to get featured in MarketScale Energy?

Create a free MarketScale workspace and get your company's expertise featured across our Energy coverage. No credit card, no demo required.

Start free

Background

The implementation of flexible wastewater system with batch treatment saves aerospace manufacturer money

Wastewater treatment within aerospace manufacturing is often a multi-step process, especially for organizations that deal with heavy metals, chemical finishes, and oil and grease. Contaminants such as cadmium cyanide make it difficult for some manufacturers to meet strict discharge limits without investing in state-of-the-art technology. One southern California-based aerospace manufacturer had an evaporator-based wastewater treatment system that was too costly and less effective than it needed to be. Rather than using pretreatment with automation prior to evaporation, all wastewater was sent directly to the evaporator.

Challenges

Aerospace manufacturer was paying too much for a less effective wastewater solution

Evaporation without pretreatment created several problems for the aerospace manufacturer. Higher wastewater concentrations required more energy for evaporation. In addition, TSS built up within the evaporator and required continual cleaning — about a week of downtime every month. Cleaning required additional labor, which reduced the company’s available workforce and flexibility, and sludge removal costs were high. By creating more sludge, the manufacturer unnecessarily increased its wastewater treatment costs. Overall, the process took more time than necessary. Without an effective pretreatment wastewater system, the company was paying more than it needed to for a less effective solution. Treatment was becoming unacceptably expensive and less effective than required, plus an efficient means of cadmium cyanide destruction was needed.

Solution

Innovative multi-step process used to reduce wastewater treatment costs

DMP saw that simply sending wastewater to the evaporator was not an efficient practice. In this case, less technology and equipment meant higher costs, greater maintenance and poor results. Instead, DMP’s team showed the manufacturer how it could optimize its evaporator with better feed water and by using the method as a step in the process, not a one-stop solution. Implementing ion exchange for water recycle and batch treatment for solids removal changed everything for the better. Wastewater is now clean enough for effective evaporation.

Results

Ion exchange and batch treatment steps make evaporator more effective and less costly

By relying less on the evaporator and more on an integrated, automated wastewater treatment platform, the aerospace manufacturer expects to reduce O&M costs by 25 to 30 percent. But it wasn’t just about making the evaporator more effective and less costly. By incorporating new technologies like ion exchange for water recycle and batch treatment for solids removal, and by understanding more about the entire wastewater treatment process, the aerospace manufacturer can focus more time and money on its operations and less on its wastewater solutions

For operations that want optimized chemical usage and lower operating costs, DMP Corp offers the premier solution. Visit DMP’s wastewater solutions page to learn more about their methods to cut costs and increase operational efficiency.

Read more at dmpcorp.com

Your experts belong here

Every story in MarketScale Energy starts with a company putting its field engineers, operations leads, and project developers on the record. Buyers are already reading this topic. The only question is whose experts they find.

Developers and operators shortlist on credibility, and your engineers give your sales team something real to send.

Get your team featuredSee how it works15 minutes, straight to a calendar.

Follow Energy Insights

Get new expert content in your inbox.

Energy: are you visible to AI?

Before they reach out, Energy buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free plan

You just read one Energy expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your field engineers, operations leads, and project developers into the articles, video, and social content Energy buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale workspace, up to 10 people
One professional video edit a month for qualifying companies
Media requests to your crowd, remote recording, AI writing tools
$0, no credit card, nothing that expires

More Energy Insights

Power and utility deals hit a record $205 billion in the first half of 2026

Power and utility deals hit a record $205 billion in the first half of 2026

Power and utilities M&A hit a record $205 billion across 92 deals in the first half of 2026, Deloitte reports. NextEra Energy's $124 billion Dominion Energy merger led the way. PwC says buyers are paying for gas, grid and dispatchable assets that add capacity faster than new builds. Who pays for grid upgrades is now the open question for data centers and large loads.

  • 01Two megadeals, NextEra Energy's $124 billion merger with Dominion Energy and the $48 billion AES take-private, drove Deloitte's record $205 billion first-half total, according to Deloitte, so the headline figure says more about the largest players than about the 92-deal field as a whole.
  • 02PwC says buyers now favor assets with contracted offtake or direct exposure to large-load customers, alongside those with clear cost recovery, which makes contracted cash flows and who pays for grid upgrades questions a data center or plant operator should raise at its next utility meeting.
  • 03Where a jurisdiction assigns large-load costs (directly to data centers, through general rates, or through new contractual models) is becoming a valuation input for acquirers, so the tariff dockets being drafted now will shape both the power bill and who owns the utility.

Sep 15, 2026

NextEra Advances Duane Arnold Nuclear Restart With Federal Loan

NextEra Advances Duane Arnold Nuclear Restart With Federal Loan

NextEra Energy received a Department of Energy loan of up to $1.9 billion and Federal Energy Regulatory Commission approval to reconnect the shuttered Duane Arnold nuclear plant in Iowa to the grid. The company has already signed a 25-year electricity supply agreement with Google for the plant, which it aims to restart by early 2029.

  • 01NextEra closed a $1.9 billion DOE loan through the Office of Energy Dominance Financing to fund the Duane Arnold restart, targeting electricity production by early 2029.
  • 02Google committed to a 25-year power purchase agreement with Duane Arnold to support its cloud-computing and AI infrastructure in Iowa.
  • 03Duane Arnold is one of three shuttered U.S. nuclear plants restarting with federal financing, alongside Constellation Energy's Crane plant ($1 billion loan) and Holtec's Palisades plant ($1.52 billion loan).

Sep 12, 2026

India Order Could Free Up 15.7 GW of Renewable Grid Access

India Order Could Free Up 15.7 GW of Renewable Grid Access

India's Central Electricity Regulatory Commission ordered on July 11 that renewable developers surrender transmission rights or provide higher bank guarantees if their projects are not generating power, a change Reuters reported could free up roughly 15.7 gigawatts of grid connectivity. Reuters separately reported that coal still supplies about 70% of India's electricity generation as of an August 17 report.

  • 01CERC order requires renewable developers to either surrender transmission rights or post additional bank guarantees for non-generating projects.
  • 02Approximately 15.7 GW of grid connectivity held by awarded projects that are not generating power could be freed up; surrendered capacity would first go to existing applicants in the same substation cluster, with any remainder auctioned.
  • 03Developers and buyers evaluating projects in constrained substation clusters should verify current CERC connectivity status and guarantee backing, as auction-based allocation may alter cost and timing dynamics.

Sep 11, 2026

Explore More Energy Insights

Read more expert perspectives from across Energy.

Browse Energy Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Energy and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512