Applied Digital Ellendale AI Data Center: October 2024 Update

Applied Digital's Ellendale AI Data Center in North Dakota is making significant progress. The facility, spanning 363,000 square feet, supports a 100MW IT load and focuses on high-performance AI-driven workloads. Recent developments include utility upgrades and advanced cooling systems leveraging the local climate for energy efficiency.

This story was produced through MarketScale. See how Energy teams put it to work with Customer Stories & Case Studies.

Promoted content from Applied Digital on MarketScale.

By Software And Technology · Ai InfrastructureAi-driven WorkloadsApplied DigitalEllendale Ai Data Center
Share

Key takeaways

01

Applied Digital's Ellendale AI Data Center is progressing significantly.

02

The facility supports a 100MW IT load and features advanced cooling systems.

03

Key developments include upgrades in infrastructure and energy optimization.

Get featured

Want to get featured in MarketScale Energy?

Create a free MarketScale workspace and get your company's expertise featured across our Energy coverage. No credit card, no demo required.

Request an invite

In October, Applied Digital's Ellendale AI Data Center project in North Dakota continues to make remarkable strides. Following September's progress on the utility substation and foundational infrastructure, we now see further development in the facility's three-tiered structure. Spanning 363,000 square feet, this facility is designed to support a substantial 100MW IT load, positioning it as a key player in advancing AI infrastructure.

Spanning 363,000 square feet, this facility is designed to support a substantial 100MW IT load, positioning it as a key player in advancing AI infrastructure.

The first level, dedicated to critical utilities, has seen significant upgrades, reinforcing the center's ability to ensure seamless and reliable operations. Meanwhile, work continues on the second and third levels, which house the expansive data halls. Each hall is engineered to support a 50MW IT load, fully optimized for high-performance AI-driven workloads. Advanced liquid cooling systems are being integrated, harnessing North Dakota's naturally cool climate to maximize energy efficiency and sustainability.

The Ellendale AI Data Center is on track to set a new standard in AI infrastructure, showcasing Applied Digital's dedication to both technological innovation and sustainable practices.

The Ellendale AI Data Center is on track to set a new standard in AI infrastructure, showcasing Applied Digital's dedication to both technological innovation and sustainable practices.

Part of this channel

Applied Digital

News, updates, and expert insights from Applied Digital.

Visit the channel

Your experts belong here

Every story in MarketScale Energy starts with a company putting its field engineers, operations leads, and project developers on the record. Buyers are already reading this topic. The only question is whose experts they find.

Developers and operators shortlist on credibility, and your engineers give your sales team something real to send.

Get your team featuredSee how it works15 minutes, straight to a calendar.

About the author

SA
Software And Technology

Follow Energy Insights

Get new expert content in your inbox.

Energy: are you visible to AI?

Before they reach out, Energy buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one Energy expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your field engineers, operations leads, and project developers into the articles, video, and social content Energy buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Energy Insights

Lead time is the new design constraint for transformers, breakers, and HV cable

Lead time is the new design constraint for transformers, breakers, and HV cable

Grid equipment manufacturers are expanding U.S. production of transformers, circuit breakers, and high-voltage cable, according to Renewable Energy World. Delivery timelines are now part of engineering and procurement planning. For utility operators, EPCs, and developers, factory capacity and acceptance testing can set the critical path.

  • 01Delivery is now an engineering variable, procurement lead time can set in-service dates for substations and interconnections.
  • 02Treat transformer and switchgear procurement as early engineering work: capacity, test plans, and change control belong in the bid package and schedule model.

Sep 5, 2026

Europe’s diesel premium just broke $100 a barrel, and logistics budgets will feel it first

Europe’s diesel premium just broke $100 a barrel, and logistics budgets will feel it first

Europe’s diesel crack spread rose above $100 a barrel for the first time, the Financial Times reported. Logistics budgets will feel it first. Fleet and facilities operators should expect pressure on fuel surcharges, backup power planning, and contract terms.

  • 01A $100-plus diesel crack spread is a procurement signal, refiners are being paid for diesel scarcity, not crude cost, so index clauses tied only to Brent can miss the real pain.
  • 02Low EU gas inventories raise the odds of fuel-switching into distillates during peaks, which can tighten diesel supply right when trucking and backup generators compete for the same barrel.

Sep 4, 2026

U.S. grid batteries are set to top 100 GW by 2028, changing peak prices

U.S. grid batteries are set to top 100 GW by 2028, changing peak prices

U.S. utility-scale battery storage reached nearly 52 GW of nameplate capacity by June 2026 after adding 8.3 GW in the first six months of the year, according to the U.S. Energy Information Administration. The same EIA planning data shows 54 GW more is planned for the second half of 2026 through 2028, including 14 GW in the second half of 2026, 26 GW in 2027, and 14 GW in 2028. pv magazine USA reports total national operational storage capacity is expected to pass 105 GW by the end of 2028. Solar photovoltaic plants host the largest battery storage capacity units, including AES’ Bellefield Solar and Energy Storage Farm in California and Florida Power & Light’s Manatee Solar Energy Center in Florida, according to EIA.

  • 01The planning benchmark that matters for 2027 to 2028 contracts: EIA’s reported pipeline implies U.S. battery nameplate capacity could roughly double from ~52 GW to ~106 GW by end of 2028 if schedules hold.
  • 02Storage penetration is becoming a pricing question, not a technology question. pv magazine USA points to ERCOT growing from 15 GW (2025) to 37 GW (end of 2027), a level that could alter who sets the marginal price in evening peaks and how much capacity value peakers retain.

Sep 3, 2026

Explore More Energy Insights

Read more expert perspectives from across Energy.

Browse Energy Hub

About the Expert

SA
Software And Technology

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Energy and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512