Skip to content
MarketScale
‹ Back to IndustriesEnergy

IS IT TIME TO EVALUATE TO YOUR HEAT RECOVERY STEAM GENERATOR SYSTEM MAINTENANCE AND REPAIR STRATEGY?

Since the cogeneration boom in the 90’s, Heat Recovery Steam Generators (HRSGs) are common in plants ranging the industrial and power generation spectrum.[1] Once cutting-edge technology, the design and materials used in their construction are aging rapidly, and the plants where they operate are paying the price. Despite the spike in downtime, inefficiency, and other disruptive…

This story was produced through MarketScale. See how Energy teams put it to work with Customer Stories & Case Studies.

Share
IS IT TIME TO EVALUATE TO YOUR HEAT RECOVERY STEAM GENERATOR SYSTEM MAINTENANCE AND REPAIR STRATEGY?

Get featured

Want to get featured in MarketScale Energy?

Create a free MarketScale workspace and get your company's expertise featured across our Energy coverage. No credit card, no demo required.

Request an invite

Since the cogeneration boom in the 90’s, Heat Recovery Steam Generators (HRSGs) are common in plants ranging the industrial and power generation spectrum.[1] Once cutting-edge technology, the design and materials used in their construction are aging rapidly, and the plants where they operate are paying the price. Despite the spike in downtime, inefficiency, and other disruptive maintenance issues, many plants have been slow to adopt the latest maintenance and repair practices in HRSGs. This is likely because many who utilize HSRGs are unaware of the capabilities of a modern, properly equipped system.

Without a proactive maintenance and repair strategy, erosion caused by high temperature conditions and high velocity gas turbulence can result in an unplanned outage, prolonged downtime and loss in the power supply. Adding to the dilemma, finding a partner with a broad spectrum of HRSG experience, from multi-craft, general maintenance, construction and repairs to highly engineered, solution-specific mechanical integrity solutions, can pose a significant and time consuming challenge.

Fortunately, the combined capabilities of AZZ Field Services and AZZ Specialty Welding work in tandem to optimize system performance, reduce outage schedules and maximize uptime. Drawing upon decades of application-specific experience, AZZ Field Services delivers a diverse scope of HRSG construction and maintenance services, from routine to the most sophisticated. AZZ Specialty Welding extends this range of services by providing highly engineered solutions of component life extension, from comprehensive engineering analysis to advanced welding for 9Chrome alloy piping and headers.

AZZ Field Services’ industry-leading HRSG capabilities include:

Multi-craft, general maintenance and support

Efficient and cost effective component repair, replacement and installation:

  • Ducts, liners, access floors, bellows, baffles and dampers
  • SCR/CO components, auxiliary skids, firing systems and monitors
  • Insulation, foundation, structural

Field construction personnel specializing in HRSG systems and difficult repairs

Code qualified repairs supported by sophisticated design-basis engineering

24/7 Emergency Responsiveness and backup resources 

AZZ Specialty Welding’s unique combination of engineering and mechanical integrity offerings consist of:

Comprehensive engineering analysis:

  • Unique numerical predictive analysis using FEA
  • Materials selection for design performance
  • Distortion and stability prediction analysis

Solution-specific mechanical integrity capabilities to reduce outage schedules and maximize uptime:

  • Advanced welding for 9Chrome alloy piping and headers
  • Expertise to stop persistent cracking in turbine and exhaust manifolds
  • Unique options for insitu attemperator repairs

With ASME and NBIC certification in boiler construction, maintenance, and overhauls, AZZ engineers bring their expertise and three decades of experience to the unique challenge at hand. AZZ specialists are prepared for even the most unusual and intense constraints on design, adapting and innovating systems to make a safe and effective solution.

Read more at azz.com

Your experts belong here

Every story in MarketScale Energy starts with a company putting its field engineers, operations leads, and project developers on the record. Buyers are already reading this topic. The only question is whose experts they find.

Developers and operators shortlist on credibility, and your engineers give your sales team something real to send.

Get your team featuredSee how it works15 minutes, straight to a calendar.

Follow Energy Insights

Get new expert content in your inbox.

Energy: are you visible to AI?

Before they reach out, Energy buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one Energy expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your field engineers, operations leads, and project developers into the articles, video, and social content Energy buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Energy Insights

NextEra Advances Duane Arnold Nuclear Restart With Federal Loan

NextEra Advances Duane Arnold Nuclear Restart With Federal Loan

NextEra Energy received a Department of Energy loan of up to $1.9 billion and Federal Energy Regulatory Commission approval to reconnect the shuttered Duane Arnold nuclear plant in Iowa to the grid. The company has already signed a 25-year electricity supply agreement with Google for the plant, which it aims to restart by early 2029.

  • 01NextEra closed a $1.9 billion DOE loan through the Office of Energy Dominance Financing to fund the Duane Arnold restart, targeting electricity production by early 2029.
  • 02Google committed to a 25-year power purchase agreement with Duane Arnold to support its cloud-computing and AI infrastructure in Iowa.
  • 03Duane Arnold is one of three shuttered U.S. nuclear plants restarting with federal financing, alongside Constellation Energy's Crane plant ($1 billion loan) and Holtec's Palisades plant ($1.52 billion loan).

Sep 12, 2026

India Order Could Free Up 15.7 GW of Renewable Grid Access

India Order Could Free Up 15.7 GW of Renewable Grid Access

India's Central Electricity Regulatory Commission ordered on July 11 that renewable developers surrender transmission rights or provide higher bank guarantees if their projects are not generating power, a change Reuters reported could free up roughly 15.7 gigawatts of grid connectivity. Reuters separately reported that coal still supplies about 70% of India's electricity generation as of an August 17 report.

  • 01CERC order requires renewable developers to either surrender transmission rights or post additional bank guarantees for non-generating projects.
  • 02Approximately 15.7 GW of grid connectivity held by awarded projects that are not generating power could be freed up; surrendered capacity would first go to existing applicants in the same substation cluster, with any remainder auctioned.
  • 03Developers and buyers evaluating projects in constrained substation clusters should verify current CERC connectivity status and guarantee backing, as auction-based allocation may alter cost and timing dynamics.

Sep 11, 2026

India's Evening Power Deficit Persists Despite Record Solar Capacity Growth

India's Evening Power Deficit Persists Despite Record Solar Capacity Growth

India's electricity demand exceeded 270 gigawatts on May 22, 2026 amid a heatwave, with a late-evening peak deficit of about 2.57 gigawatts reported by grid regulator Grid-India, according to Reuters. Reuters also reported that as of August 2026, clean energy capacity, led by solar, had surpassed fossil fuel capacity in India for the first time, though coal still supplies roughly 70% of actual generation.

  • 01Peak electricity demand in India exceeded 270 gigawatts on May 22, 2026 amid a heatwave, Reuters reported.
  • 02A late-evening peak deficit of about 2.57 gigawatts was recorded by Grid-India, per Reuters.
  • 03Clean energy installed capacity, led by solar, surpassed fossil fuel capacity in India for the first time, per Ember/GEM data cited by Reuters, though coal still supplies about 70% of generation.

Sep 11, 2026

Explore More Energy Insights

Read more expert perspectives from across Energy.

Browse Energy Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Energy and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512