Skip to content
‹ Back to IndustriesEnergy

Designing Energy and Power Solutions for a Sustainable Future, Today!

In the latest episode of “Are We There Yet?”, host Grant Harrell interviewed Erika Lauren Guerrero, the founder and CEO of Electric Goddess — a California battery consultation and testing company, along with Luke Workman, the company’s Chief Scientist. The pair talked with Harrell about their experience in the electric transportation field, the state of…

This story was produced through MarketScale. See how Energy teams put it to work with Customer Stories & Case Studies.

·
Share
Designing Energy and Power Solutions for a Sustainable Future, Today!

Free workspace

Turn your Energy expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

In the latest episode of “Are We There Yet?”, host Grant Harrell interviewed Erika Lauren Guerrero, the founder and CEO of Electric Goddess — a California battery consultation and testing company, along with Luke Workman, the company’s Chief Scientist. The pair talked with Harrell about their experience in the electric transportation field, the state of batteries and testing, and battery-operated transportation/mobility.

Workman is extremely confident in the company’s testing capabilities, and stated that Electric Goddess’ testing operations truly aim for genuine issues that a battery will demand, as opposed to testing that always needs interference. In regards to their overall safety measures, he maintained that their battery pack designing capabilities are essentially failproof! Such batteries can be found today in electric bicycles, or e-bikes for example.

“If it’s a pack that we designed and validated for our clients, then yeah I can say it’s safe. It’s so safe that for example we shoot, say five, three inch nails into them while they’re preheated to max temperature at 100 percent state of charge,” said Workman.

Workman even added that in a case where all odds are against a battery pack, it is still very rare for self-defectiveness to overtake it. With various testing ranging from decay to laser heat tests, Workman said issues are “almost non-existent.”

Companies that they work with often come with very challenging tests, so challenging, in fact, that Workman stated they perform “tests that other labs turn down.”

Being in this niche area has allowed them to create and build equipment to address many of the major problem areas that haunt the industry.

Despite safety concerns with certain electric vehicle companies and an uptick in recalls, there is a way to prevent or decrease them. To avoid a recall, Guerrero’s advice to companies contends that they should be more familiarized with potential issues beforehand.

Because they perform the tests that many companies would prefer to avoid, Guerrero knows exactly why some problems are recurring.

“We’re getting more information out there because we need more people to understand the concept that batteries are not one-size-fit-all so you need to understand your application…but you also really need to think critically about testing to failure and understanding your margins on when does it fail, and how does it fail, and I think that that will help the industry a lot,” said Guerrero.

Testing is more than just checking a box and logging in a book, Workman stated.

Vaya Space is on a Mission to Reduce Risk & Cost in Space Exploration

How One MRO Company is Creatively Overcoming the Industry’s Talent Shortage

Your experts belong here

Every story in MarketScale Energy starts with a company putting its field engineers, operations leads, and project developers on the record. Buyers are already reading this topic. The only question is whose experts they find.

Developers and operators shortlist on credibility, and your engineers give your sales team something real to send.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Energy, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Energy: are you visible to AI?

Before they reach out, Energy buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Energy expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your field engineers, operations leads, and project developers into the articles, video, and social content Energy buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Energy Insights

Ecolab ties Siemens power and Dassault design tools to its liquid cooling system

Ecolab ties Siemens power and Dassault design tools to its liquid cooling system

Ecolab announced an open partner ecosystem for liquid cooling at SC26 on November 17, 2026. Each partner connects into its first smart thermal management system for direct liquid cooling. Siemens adds power distribution, Alfa Laval works with Ecolab on next-generation CoolIT CHx 3000 coolant distribution units, and Dassault Systèmes provides a virtual twin that measures trade-offs in water per token. Ecolab released no pricing, delivery schedules or measured results from installations.

  • 01Ecolab said Siemens power distribution, Alfa Laval heat exchange technology and a Dassault Systèmes virtual twin connect into its first smart thermal management system for direct liquid cooling. For operators, the announcements suggest an Ecolab cooling decision could pull power and modeling choices into the same integrated package—depending on their existing vendors and tools.
  • 02Water per token turns a cooling design choice into a number the people paying for the compute can read, but it becomes a market benchmark only once an operator publishes the figure from a running hall.
  • 03The Siemens power integration matters most to teams already planning on Siemens electrical gear; teams on another power vendor should ask what an 'open' ecosystem means in the contract.

Nov 22, 2026

Ecolab builds coolant monitoring into CoolIT's 3-megawatt AI cooling unit

Ecolab launched an integrated cooling platform at SC26 that builds its 3D TRASAR fluid monitoring into CoolIT's CHx 3000, a 3-megawatt coolant distribution unit. Buyers can now judge coolant care as part of the hardware. Ecolab is backing the category with a $4 billion High-Tech sales target for 2030, but it has published no measured savings yet.

  • 01On the CHx 3000, the condition of the coolant becomes a live reading on the 3-megawatt unit that moves the heat, so fluid management can be specified alongside the hardware instead of bought separately.
  • 02Ecolab says its High-Tech business is around $1.5 billion today and targets $4 billion by 2030, implying the service organization behind offerings like this platform is expected to scale up rather than stay flat.
  • 03The water, energy and reliability gains are claims for now. The evidence to watch for is the first deployment that publishes measured results.

Nov 22, 2026

AI now accounts for more than 90% of Gradiant's core water business

Gradiant now draws more than 90% of its core business from AI data centers, chip fabs and their power plants. Three emerging technologies now sit in a unit called Entropy. Because backlog already covers most of a $150 million 2027 earnings forecast, AI developers in dry regions should treat water infrastructure as an early site-planning decision.

  • 01When more than 90% of a water treatment company's core business comes from data centers, chip fabs and their power plants, water belongs on the same site checklist as the electrical interconnect.
  • 02With most of its projected 2027 operating-business EBITDA already covered by backlog, the numbers argue for starting water infrastructure planning early for 2028-and-later sites—alongside power, not after the electrical interconnect is secured.

Nov 21, 2026

Explore More Energy Insights

Read more expert perspectives from across Energy.

Browse Energy Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Energy and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512