Skip to content
‹ Back to IndustriesEnergy

Could Aerodynamics In Aircraft Be Boosted With A Bird-Like Design?

In the United States alone, air carriers use 20 billion gallons of jet fuel and create 3% of our total greenhouse gas emissions. Engineers at USC are creating new plane designs and alternative energy sources for engines that could cut back on fuel usage. “For a long time, we’ve been wondering about the basics of…

This story was produced through MarketScale. See how Energy teams put it to work with Customer Stories & Case Studies.

·
Share
Could Aerodynamics In Aircraft Be Boosted With A Bird-Like Design?

Free workspace

Turn your Energy expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

In the United States alone, air carriers use 20 billion gallons of jet fuel and create 3% of our total greenhouse gas emissions. Engineers at USC are creating new plane designs and alternative energy sources for engines that could cut back on fuel usage.

“For a long time, we’ve been wondering about the basics of aircraft design,” Spedding said. “Is it at an optimum? How do we know an optimum even exists? And if it’s not at an optimum, why not? And if it is, has that ever been demonstrated?”[1]

The engineers weighed the pros and cons of 3 designs.

First, the current aircraft design, deemed not the most optimal due to the drag the tail causes. Secondly, a blended wing design which has structural flaws. Finally, a bird-like design, which scientists think might be the future of aircraft design, possibly increasing aerodynamic efficiency by as much as 10 percent.

“We have a dedicated fuselage with a shape designed for low-drag-per-unit volume, and it’s not compromised by the wing at all, which in turn is not compromised by trying to fit in with the body,” Spedding said.

“If an optimum exists, then we assert that this is the most likely candidate.”

To read the full article, click here.

[1]http://news.usc.edu/136946/usc-viterbi-engineers-consider-redesigned-fuel-efficient-airplanes/

Your experts belong here

Every story in MarketScale Energy starts with a company putting its field engineers, operations leads, and project developers on the record. Buyers are already reading this topic. The only question is whose experts they find.

Developers and operators shortlist on credibility, and your engineers give your sales team something real to send.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Energy, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Energy: are you visible to AI?

Before they reach out, Energy buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Energy expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your field engineers, operations leads, and project developers into the articles, video, and social content Energy buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Energy Insights

Flowco buys Lifting Solutions for mature-well lift

Flowco buys Lifting Solutions for mature-well lift

Flowco closed its Lifting Solutions acquisition, adding continuous rod and progressing cavity pump lift for mature wells. The deal gives Flowco scaled Canadian operations and an established international customer base it plans to use for growth in Canada, the Middle East and other markets. Sellers could receive up to C$10 million more based on Lifting Solutions’ 2027 financial performance.

  • 01The sellers can earn up to C$10 million in contingent consideration based on Lifting Solutions’ 2027 financial performance.
  • 02Lifting Solutions' proprietary rod coatings and PCP technologies are designed to extend run times and reduce workover and lifting costs.
  • 03Flowco says the deal creates opportunities to bring a broader set of technologies to customers across both businesses.

Oct 8, 2026

Solar panels installed in 2020 could supply 21% of solar silver by 2035

Solar panels installed in 2020 could supply 21% of solar silver by 2035

Recycling solar panels installed in 2020 could supply up to 21% of the silver needed for new panel production by 2035. Technical advances are making panel recycling more economic. Buyers and asset owners can start modeling recycled supply and retirement value.

  • 01Panels installed in 2020 could supply up to 21% of the silver needed for solar panel production in 2035, a 15-year lag that suggests recycled supply could be estimated from installation records.
  • 02European researchers estimate recycling could cover about 25% of cobalt and 15% of lithium, nickel and manganese supply by 2030.
  • 03A recycler's recovery rate means little without its purity: TNO's laser process reported roughly 97% yield with silver at 99.7% purity, the pairing that tells a manufacturer whether the metal is usable.

Oct 2, 2026

Massachusetts queue delays put 2027 solar tax credits at risk

Massachusetts queue delays put 2027 solar tax credits at risk

Catalyst Power says interconnection delays are now a tax-credit risk, not just a schedule risk. In Massachusetts, a project tied to a 2029 transmission upgrade could miss the Dec. 31, 2027 deadline that SEIA says now governs many solar projects, putting 30% to 50% of ITC value at risk.

  • 01SEIA says solar projects that begin construction after July 4, 2026 must be placed in service by Dec. 31, 2027.
  • 02FERC's cluster-study reforms set study deadlines and late-study penalties, but they do not guarantee a needed grid upgrade finishes before a project's tax clock runs out.

Oct 2, 2026

Explore More Energy Insights

Read more expert perspectives from across Energy.

Browse Energy Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Energy and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512