Skip to content
‹ Back to IndustriesBuilding Management

Altronix's ReServ24B pairs dual 24VDC inputs with rapid battery charging

Altronix's ReServ24B supports two 24VDC power supplies and switches the load to the other input without delay if one drops. When power returns, it uses excess power to rapidly recharge SLA, gel or LiFePO4 backup batteries. It connects to the LINQ2 module for remote monitoring, control and reporting.

This story was produced through MarketScale. See how Building Management teams put it to work with Customer Stories & Case Studies.

By MarketScale Newsroom · AltronixReserv24bAccess ControlSecurity Power Supplies
Share
Listen to the audio brief

Key facts, context, and what it means.

AUDIO
0:00—
Altronix's ReServ24B pairs dual 24VDC inputs with rapid battery charging

Key takeaways

01

When both 24V inputs are live, the ReServ24B feeds the load from whichever supply runs at the higher voltage, so the voltage setting decides which unit acts as primary.

02

A failover nobody sees is still a countdown: below 20V the battery-fed output shuts off and needs DC input power to restart.

03

Three supervision relays plus LINQ2 data on input status, battery status, output voltage and output current give a site a way to spot a failover well before the cutoff.

Free workspace

Turn your Building Management expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

SecurityInfoWatch's Aug. 12, 2026 product listing for the ReServ24B ran under the heading "GSX Booth 2833." Ronnie Pennington, Director of Sales for the Americas at Altronix, said in the launch announcement that integrators will find the ReServ24B easy to deploy. He added that the unit gives facility managers and end users confidence that access control and security systems will stay online and recover quickly.

For the integrator wiring the panel, and the security director who has to explain a dead door, the useful questions concern the edges. Which supply carries the load when both are healthy? What happens when the battery runs low? And how does anyone find out the site has failed over? Altronix's own product page answers most of that.

How the board picks its power

The press language talks about a primary and a secondary input. The redundancy logic on Altronix's spec page is more specific. When both inputs are present, the one with the higher voltage powers the output and the charging circuit. If that input is disconnected or sags, the other is routed to the output and the charger automatically. Both inputs accept 23 to 28VDC.

That suggests the "primary" supply is set by voltage, not by which terminal it's wired to. An installer who wants a particular supply to carry the load day to day would set that supply's output higher. That's a small commissioning detail, and it's easy to miss when two supplies are set to the same nominal 24V.

The battery side handles 24V LiFePO4, sealed lead acid or gel batteries, which are sold separately. Altronix lists the failover on loss of AC as instantaneous, and SecurityInfoWatch's product listing describes the transfer as happening without delay. According to Locksmith Ledger, the board uses excess available power to rapidly recharge the backup batteries, extending backup. For operators, that could mean a battery that refills faster after one outage is ready sooner for the next.

Per Altronix's spec page: if the battery discharges below 20V, the output is disabled, and one or both DC inputs must return to restart it. If both DC inputs are low or missing and only the battery is connected, the unit will start up from the battery.

Those two rules work together. A long outage that drains the battery ends with the output switched off, and the board won't bring connected devices back until supply power returns. A site where supply power is switched rather than constant, which is the use case Altronix names first, can still bring the board up from a charged battery alone.

The ratings an installer designs around

ReServ24B on the spec sheet

Up to 10A
Current per input and per output, the ceiling for the load behind one board
1, 2, 4 or 6A
Selectable battery charge current, set to suit the battery and the spare supply capacity
-20°C to 49°C
Operating temperature range (-4°F to 120°F), a check for hot closets and outdoor enclosures
3 x 5.5 x 1 in.
Board footprint at 0.65 lb, small enough to fit an existing enclosure

Altronix

Each input, the output and the battery circuit carry a 15A/32V fuse, and output voltage is listed at 22 to 24VDC. The board gives off about 34.1 BTU per hour, which matters mainly in an enclosure that is already full of warm power supplies. Relative humidity is rated at 85%, plus or minus 5%.

There is a catch in the word "rapid." Altronix describes charging as using the excess power left after the connected devices are fed. A supply already running close to its rating could have little spare current, so a 6A charge setting would matter less than the headroom in the supply behind it. The board's charging speed depends partly on how generously the rest of the power design is sized.

Who finds out the site failed over

Locally, the board reports through LEDs: green when the power supplies are feeding the load, red when the battery is, and blue for operation, components and fuses. It also has three normally closed relays rated 1A at 28V, one each for Input 1, Input 2 and battery status.

The network side runs through Altronix's LINQ interface and the LINQ2 module, which the company says allows remote monitoring, control and reporting. The product page lists what LINQ2 can see: DC input status, battery status, output voltage and output current. SecurityInfoWatch's listing frames this as visibility into power status and system diagnostics. Output current is the useful one for planning, because it shows how much of the 10A ceiling the connected devices actually draw.

That telemetry matters because a smooth failover is, by design, easy to miss. Doors keep working, cameras stay up and nobody calls. A failover nobody sees is still a countdown: the battery carries the load until it sags below 20V, then the output shuts off until DC power comes back.

Before the board goes in, decide who receives the battery-status relay and the LINQ2 alerts, and what they do when one fires. The board's value depends on someone seeing the switch to battery while the battery still has charge.

Which sites it suits

Altronix says the ReServ24B can be added to new or existing security and access control systems, and positions it for two jobs: sites where constant power isn't available because power is switched, and sites that need faster battery charging. The product page links to Altronix's lifetime warranty and to a distributor locator.

The ratings mark the boundary. This is a 24VDC device with a 10A output, so a system that runs at another voltage, or a load bigger than one board's ceiling, falls outside what a single unit covers. For a 24V access control panel already in place, though, adding a second supply and a monitored battery path becomes a matter of fitting a 3-by-5.5-inch board and selecting a charging current.

Featured companies

Your experts belong here

Every story in MarketScale Building Management starts with a company putting its facilities engineers, energy managers, and service technicians on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners and facilities teams pick on trust, and your engineers turn that trust into inbound conversations.

Book DemoSee how it works15 minutes, straight to a calendar.

About the author

MarketScale Newsroom
MarketScale NewsroomEditorial Team, MarketScale

The MarketScale Newsroom reports on the companies, technologies, and trends shaping 16 B2B industries. It turns primary sources and expert commentary into clear, useful coverage for the people doing the work.

B2B Weekly

The week in Building Management, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Building Management: are you visible to AI?

Before they reach out, Building Management buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Building Management expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your facilities engineers, energy managers, and service technicians into the articles, video, and social content Building Management buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Building Management Insights

NHL says the business case starts at community rinks

NHL says the business case starts at community rinks

Honeywell's Dani Stern placed the value of automation in event changeovers at a multi-use venue, a problem single-use community rinks don't have.

  • 01The NHL says kids who play hockey between ages 5 and 8 are roughly 5 to 6 times more likely to become avid fans.

Oct 7, 2026

Cancelled-class scenario probes building AI orchestration

Cancelled-class scenario probes building AI orchestration

Rowden argues that AI orchestration can coordinate responses across building systems that often run in isolation. He frames the lecture-hall scenario as a practical way to test what a platform can actually orchestrate.

  • 01One occupancy reading in an empty lecture hall can reach cleaning crews, security patrols, parking and the energy forecast, so an orchestration platform likely needs sign-off from more than the facilities team.
  • 02Rowden says AI could rank alerts with predictions—like a 78% failure chance in 28 days—so planners can schedule work rather than wait for someone to spot a trend.
  • 03A key vendor question is which nine actions a platform can execute automatically and which it can only recommend without the right operational sign-off.

Oct 1, 2026

City: Albuquerque health center bill fell to $20,118 in 2025

City: Albuquerque health center bill fell to $20,118 in 2025

Albuquerque retrofitted its Dede Feldman Los Griegos Health & Social Services Center after HVAC equipment more than 20 years old failed. The city reports the electric bill fell from more than $44,000 a year to $20,118 in 2025; costs through August 2026 were $14,724. The takeaway: an emergency replacement became a whole-building fix, with controls, sealing, repaired solar and city-owned metering to verify consumption, solar generation and utility performance.

  • 01After its 20+ year-old rooftop HVAC units failed, the City added a BAS, sealed the envelope and installed city-owned metering.
  • 02Albuquerque addressed failing rooftop HVAC at Dede Feldman Los Griegos; the city reports the electric bill fell from more than $44,000 a year to $20,118 in 2025, with $14,724 through August 2026 (partial year), and the building now sends surplus power to the grid in spring and summer.
  • 03The savings come from a bundle, including LEDs bought under a separate contract, so the project can't tell you how much came from controls alone versus new hardware.

Sep 29, 2026

Explore More Building Management Insights

Read more expert perspectives from across Building Management.

Browse Building Management Hub

About the Expert

MarketScale Newsroom
MarketScale Newsroom

Editorial Team

MarketScale

The MarketScale Newsroom reports on the companies, technologies, and trends shaping 16 B2B industries. It turns primary sources and expert commentary into clear, useful coverage for the people doing the work.

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Building Management and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512