Why Collins Aerospace's Bengaluru propeller shop will start with suppliers it already uses
Collins Aerospace broke ground on a propeller blade repair shop near Bengaluru that it expects to have running by 2028 for ATR 42/72 and C295 aircraft. It will start with existing vendors, including European suppliers, and shift work to Indian suppliers gradually as they clear two-to-three-year certification timelines.
This story was produced through MarketScale. See how Transportation teams put it to work with Partner & Channel Enablement.
Key takeaways
A 2028 opening and a two-to-three-year certification process for new aerospace suppliers mean Indian vendors that want work at Collins Aerospace's Bengaluru propeller shop would need to start qualifying now.
After nearly two decades of supplier development, local vendors provide about 40% of the components in Collins Aerospace's India-built products. That figure shows how far a patient localization program gets.
Collins Aerospace brings new Indian suppliers in through simple, low-complexity machining. Raw materials it now imports are next on its list for local sourcing.
Free workspace
Turn your Transportation expertise into content.
Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.
On Tuesday, Karnataka industries minister MB Patil broke ground at the Devanahalli Aerospace Park near Bengaluru's international airport, on 26 acres the state government allotted to Collins Aerospace. The site will hold a propeller repair shop that Collins expects to have running by 2028.
The shop will inspect, repair and maintain propeller blades for ATR 42 and ATR 72 regional turboprops and for Airbus Defence and Space's C295 military transport. Arindam Majumder of ETInfra reported that Collins, part of RTX, plans to serve the wider Asia-Pacific region from Bengaluru as it goes after a bigger share of the $120 billion global aircraft maintenance market. Collins is spending multiple millions of dollars on the project. It's a familiar address for the company, which opened an aerospace manufacturing plant at Devanahalli in November 2025.
What's new is the kind of work. ET Now called the project Collins' first maintenance, repair and overhaul (MRO) facility in India, and ETInfra's photo caption described it as India's first propeller MRO facility. Its headline said the facility had opened, but ET Now's own report describes a groundbreaking, which matches ETInfra's account. The 2028 date is the one to plan around.
For anyone hoping to sell into the new shop, the supply plan matters more than the ribbon. Ajay Mahajan, president of Advanced Structures at Collins Aerospace, said the facility will start on existing supply chains, including suppliers in Europe, and will shift work to Indian vendors gradually. The reason for the wait is how long a supplier takes to earn its place.
Our goal is to use as much of the local supply chain as possible., Ajay Mahajan, president of Advanced Structures, Collins Aerospace
That ambition and the European starting point don't contradict each other. The distance between them is the qualification process, and the rest of the reporting shows how long that distance tends to be.
Simple machining comes first
Collins has been building its Indian supplier base for nearly two decades. Around 2007-08 it began sharing aerospace-specific manufacturing processes with local companies so they could qualify for aerospace production. K Binu, managing director of Collins Aerospace India, described the progression: new suppliers get relatively simple machining and low-complexity parts, then move up to more sophisticated work once they have proven themselves.
The result so far: about 40% of the components in the aerospace systems Collins builds in India come from Indian suppliers, Binu said. The company also wants to source raw materials locally. Its Indian plant imports them today.
That 40% is a rare public benchmark for how far a patient localization program gets. It took years of mentoring, and the starting point was the easy parts. An Indian machine shop eyeing aerospace work should expect to enter the same way. Flight-critical repair work would come later, after the shop has a track record on simpler parts.
Collins Aerospace's Indian supplier ladder in numbers
ETInfra (The Economic Times); ET Now
The certification clock against a 2028 opening
Put Binu's timeline next to the opening date. With specialized aerospace certifications taking two to three years for a supplier starting from scratch, a 2028 opening leaves a newcomer little room to qualify before the first propeller blade comes through the door. That explains why Collins is starting with vendors it already uses. Mahajan said aerospace sourcing has to account for safety regulations, compliance requirements and supplier certification, and none of those can be rushed to meet a construction schedule.
There's an important exception. The two-to-three-year figure applies to suppliers starting from zero. Collins already works with an Indian base that supplies about 40% of the components for its local manufacturing, and those companies could move faster than a newcomer, provided their existing approvals cover the parts and processes the propeller shop needs. The reporting doesn't spell out which certifications blade repair support requires.
The scope is narrow. The Devanahalli shop will handle propeller blades for three aircraft types: the ATR 42, the ATR 72 and the C295. It is a repair and overhaul center, separate from the manufacturing plant Collins already runs at the same park.
The longer horizon sits inside a national push. The Indian government is pressing global manufacturers to build a domestic aerospace manufacturing ecosystem with more localized components, and Mahajan said policy support, infrastructure and specialized workforce training will decide how far that effort gets.
He also sees a bigger prize ahead: India has an opening as aircraft manufacturers start evaluating suppliers for next-generation aircraft programs over the coming years. A supplier that qualifies for Collins' repair work over the next three years would arrive at those evaluations with aerospace credentials already in hand.
Karnataka's case for the site
Patil presented the project as more proof of Karnataka's lead in Indian aerospace and said the state accounts for more than 65% of the country's aerospace exports. Neither report explains how that export figure is measured. ET Now framed the shop as strengthening Bengaluru's position as an aerospace maintenance hub, which would add repair work to a state pitch built so far around its export share.
In ET Now's coverage of the groundbreaking, Patil described the state's aerospace and defense policy, which aims to attract ₹60,000 crore in investment and create 60,000 jobs by 2031. ET Now put the Collins facility's contribution at 2,100 direct jobs. Training providers and staffing partners should treat 2,100 as a target for the late 2020s. Those hires don't exist yet.
Patil also said Karnataka has written a separate, comprehensive civil aviation policy and expects to take it to the state cabinet at its next meeting. He said it was designed "to take care of what is not done in Udan and other areas," which suggests the state intends to fill gaps it sees in existing schemes rather than simply mirror them.
What a would-be supplier should ask now
For Indian precision manufacturers and materials suppliers that want work at the propeller shop, the opening date sets a deadline, and the reporting points to three questions worth raising with Collins early.
- Which certifications does supporting propeller blade repair require, and do the approvals a supplier already holds for Collins' manufacturing work count toward them?
- Which raw materials does the Indian plant import today, and which of them are first in line for local sourcing?
- Will repair-shop work follow the same path as manufacturing, with simple machining first and more complex jobs later, and what milestones mark each step?
The next date to watch comes before 2028. It's the Karnataka cabinet meeting where Patil expects the civil aviation policy to be approved, which will be the first clear sign of what the state plans to offer the companies filling Devanahalli Aerospace Park.
Sources
Featured companies
Your experts belong here
Every story in MarketScale Transportation starts with a company putting its fleet managers, logistics engineers, and safety leads on the record. Buyers are already reading this topic. The only question is whose experts they find.
Fleet and logistics buyers compare quietly, and your operators become the evidence that settles it.
About the author
The MarketScale Newsroom reports on the companies, technologies, and trends shaping 16 B2B industries. It turns primary sources and expert commentary into clear, useful coverage for the people doing the work.