Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

The Great Technology Stack Pivot: From Pyramid to Network Architecture

Christine Boles and Ram Ramasamy stoke up the flames once more for their third fireside chat focusing on various areas of technology innovation. Their conversation dives into the pivot from a layered architecture to a network architecture driven by digitalization, IoT, and the fourth industrial revolution. Several factors at play during the pandemic accelerated…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Promoted content from Intel on MarketScale.

Share

Get featured

Want to get featured in MarketScale Engineering & Construction?

Create a free MarketScale workspace and get your company's expertise featured across our Engineering & Construction coverage. No credit card, no demo required.

Request an invite

Christine Boles and Ram Ramasamy stoke up the flames once more for their third fireside chat focusing on various areas of technology innovation. Their conversation dives into the pivot from a layered architecture to a network architecture driven by digitalization, IoT, and the fourth industrial revolution.

Several factors at play during the pandemic accelerated the pace of manufacturing transformation. Data centricity, a tremendous need for reliable demand forecasting, workforce gaps, and acute supply chain pressures across industries combine to create this evolution in the technology stack from now into the next dozen years.

“Simplification of the technology stack is a real trend we’re observing,” Ramasamy says. “But what we’re also observing, as a dichotomy, is that manufacturing organizations are at a crossroads today. They need to transform, but the journey is very unclear.”

The edge computing revolution is creating the pivot from layered to network architecture. So, what is critical and core to this technology stack journey that will help customers drive towards simplification?

According to Christine Boles, companies must move towards network architecture to properly use generated data. She says, “My team and I often refer to this as software-defined.” Software-defined infrastructures require little human intervention and allow workloads to be managed in such a way that critical IT functions are fully integrated, automated, and optimized for convergence with OT. “And as that occurs, [you] can bring the AI capability [to] that data…take the insights, and ultimately bring [intelligence] forward.”

Another tool that will help bring these technologies forward is 5G. The low latency wireless capabilities of 5G will aid layered architecture across the network, allow more access to the generated data distributed across operations, and bring AI capabilities to the next level.

Learn more about the great technology stack pivot by connecting with Christine Boles and Ram Ramasamy on LinkedIn or visit:

Subscribe to this channel on Apple PodcastsSpotify, and Google Podcasts to hear more from the Intel Internet of Things Group.

Intel

Part of this channel

Intel

Silicon and AI platforms powering enterprise and edge compute.

Visit the channel

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Get your team featuredSee how it works15 minutes, straight to a calendar.

Follow Engineering & Construction Insights

Get new expert content in your inbox.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

FAB 40 highlights top U.S. metal fabricators, including acquisitive Cadrex

The Fabricator’s 2023 FAB 40 ranks U.S. metal fabricators by reported revenue. PR Newswire reported Cadrex Manufacturing Solutions debuted at No. 2 with $480 million in 2022 revenue after a series of acquisitions, while MEC again held No. 1 with $539.4 million.

  • 01PR Newswire reported Cadrex Manufacturing Solutions entered The Fabricator’s 2023 FAB 40 at No. 2 after a series of acquisitions.
  • 02MEC’s long-running No. 1 position, with $539.4 million in reported 2022 revenue, reinforces what scale and repeatable process look like at the top of the list, according to PR Newswire.
  • 03PR Newswire flagged both material price inflation and demand as drivers of record revenues, buyers should press suppliers on what portion of growth was pricing versus volume.

Sep 6, 2026

HUD backs a 24-month study on mass-timber modules that ship and stack faster

HUD backs a 24-month study on mass-timber modules that ship and stack faster

HUD funded a 24-month Washington State University project on hybrid mass-timber modular housing. It targets transportability and faster site assembly. A 2023 Journal of Building Engineering review says 2D modular CLT tends to ship farther and build faster than 3D.

  • 01If transportation is the cost driver, HUD’s study plan points straight at the spec: treat the truck interface, tie-downs, and lifting points as part of the structural module design, not afterthought hardware.
  • 02The most actionable design fork in the CLT modular literature is 2D versus 3D: according to a 2023 Journal of Building Engineering review, 2D modules are typically moved longer distances and assembled faster on average.
  • 03Owners who want future change-of-use optionality can start writing it into module grids and connection details now. HUD-backed research is explicitly testing modules that can be repurposed across occupancies over their lifetime.

Sep 6, 2026

HUD’s 24-month mass timber modular project goes after the cost driver: shipping the modules

HUD’s 24-month mass timber modular project goes after the cost driver: shipping the modules

HUD is funding a 24-month Washington State University project to redesign modular housing modules around transport and fast site assembly. Shipping is the design constraint. A 2023 Journal of Building Engineering review of 2009–2021 modular CLT projects suggests faster construction timelines, but logistics choices still decide feasibility.

  • 01In modular housing, transportation is becoming a first-order engineering spec, the module that is cheapest to build can still be the most expensive to move.
  • 02The 2023 review found 2D modular CLT projects were, on average, transported farther and built faster than 3D ones, so configuration choice shapes both transport reach and install time.

Sep 5, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512