Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

Infinite IoT: The Future of Supply Chain Operations

Since Covid took the world by storm in 2020, supply chain issues have come to the forefront of the news as no one was exempt from the challenges of getting common everyday items. And while it doesn’t take a global pandemic to disrupt supply chain operations, it was this very event that made people aware…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share
Infinite IoT: The Future of Supply Chain Operations

Get featured

Want to get featured in MarketScale Engineering & Construction?

Create a free MarketScale workspace and get your company's expertise featured across our Engineering & Construction coverage. No credit card, no demo required.

Start free

Since Covid took the world by storm in 2020, supply chain issues have come to the forefront of the news as no one was exempt from the challenges of getting common everyday items. And while it doesn’t take a global pandemic to disrupt supply chain operations, it was this very event that made people aware of how much they relied on operations throughout the globe.

IoT podcast host Mat Ackley, sat down with Dave Evans, CEO and Co-Founder at Fictiv to discuss the current state and potential future for the supply chain. And this rising star knows what he’s talking about. Since graduating from Stanford University in 2011, his accolades include being featured on Discovery, TechCrunch, Inc., named on Forbes’ 30 Under 30 list, and receiving a Manufacturing Leadership Award from NAM. In March 2013, he co-founded Fictiv, a manufacturing company dedicated to providing the infrastructure needed for teams to streamline prototyping and accelerate development lifecycles.

The discussion began with a look at the most pressing supply chain challenges including the inefficiencies that wreak havoc on a company’s operations when they can’t get the supply they need for their product line.

For example, in quarter one of 2022, 17.5M people were put on lockdown in Shenzhen, China overnight due to Covid shutting down manufacturing operations throughout the area. Traditionally, companies affected by an event such as this respond in one of two ways; one, sit and wait until suppliers come back online, or two, run a fire drill and transfer operations to a new supplier. Both are costly and infective ways of responding.

Evans noted that at Fictiv, they “had 249 orders in flight just in that region, just in Shenzhen, and what we deployed was basically our disaster recovery plan where our software and our operations were able to move all 249 orders in 24 hours to new facilities with near zero impact to lead time or cost.” In fact, over the next 90 days the company only saw a 2% dip in on-time delivery rates.

So, what is the answer for companies looking to upgrade their supply chain operations – ensuring they are both agile and resilient. And while some may think these terms are interchangeable, Evans explains how they are quite different as well as their significance to meeting supply chain challenges whether they are created by a pandemic or natural disasters such as floods or snowstorms.

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Get your team featuredSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free plan

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale workspace, up to 10 people
One professional video edit a month for qualifying companies
Media requests to your crowd, remote recording, AI writing tools
$0, no credit card, nothing that expires

More Engineering & Construction Insights

Packaging robots can beat labor long term on cost, PMMI argues

Packaging robots can beat labor long term on cost, PMMI argues

PMMI's Tom Egan wrote in Processing Magazine that adding packaging automation and robotics can now be justified as more cost-effective over the long term than the high cost of labor in food, beverage and CPG plants. Separately, Packaging World describes AI-enabled AMRs from ABB and Agilox that automate material movement between packaging stations. The remaining gap is adoption among smaller manufacturers.

  • 01Two reference points for infrastructure-light material movement: ABB's Flexley Mover P603 carries 1,500 kg with sub-centimeter positioning and no floor markers, and Agilox's OFL lifts 800 kg pallets on peer-to-peer fleet software with no central traffic controller, per Packaging World.
  • 02The open ground is small and mid-sized manufacturers: MTC's Mike Wilson counts tens of thousands of UK SMEs with no robotic automation at all and expects cobots to take most of that growth.
  • 03A robotics business case should include procurement, not only line labor: a June 2026 China Journal of Accounting Research study found heavy robot adopters spread buying across more suppliers, gaining resilience but losing inventory efficiency and adding transaction costs.

Sep 18, 2026

Xtellio brings telematics to jobsite tools and heaters

Xtellio brings telematics to jobsite tools and heaters

Xtellio launched a two-tier telematics platform in March 2026: 32 battery-powered Xense sensors for small tools and wired Pro-Xentral devices for excavators, light towers and heaters. The company claims a 10-year battery life. Data is delivered through open APIs, which Xtellio frames as customer ownership of the data, aimed at rental and construction fleets where small assets have gone largely untracked.

  • 01Xtellio’s stated 10-year battery life for its Bluetooth Xense sensors is the key spec to test in the field; if it holds up, tagging hundreds of tools can look like a one-time install rather than a recurring battery-maintenance program.
  • 02For rental houses and contractors running mixed fleets, the sharper question is no longer which machines have telematics but whether the heaters, light towers and hand tools do, and whether that data lands in the same system.
  • 03Open APIs and “data liberation” are part of Xtellio’s pitch, and the coverage frames that as a prompt for RFP questions: what the APIs expose, where data can be sent, and whether customers can take historical data if they switch providers.

Sep 18, 2026

Senate bill would double smart water grants to $50 million a year

Senate bill would double smart water grants to $50 million a year

S. 2388, the Water Infrastructure Modernization Act of 2025, would double an EPA water tech pilot to $50 million a year through 2028. Grants would cover design, construction, training and operations for leak detection, advanced metering and AI analytics, WaterWorld reported. Planning and maintenance stay on the utility's tab.

  • 01Under S. 2388 as WaterWorld describes it, feasibility studies are not grant-eligible, so a utility would have to pay to build the case for a smart water project before applying for help building the project itself.
  • 02The bill's eligible list puts advanced digital design and construction management tools in the same bucket as meters and sensors, which would give a utility's capital delivery team a claim on the same grant as its field operations group.
  • 03The existing pilot program's authorization runs through 2026, per WaterWorld; the bill would extend it to 2028, and its last reported status was 'introduced' as of Aug. 12, 2025.

Sep 17, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512