8 Mistakes Made in the Building Design Phase

No two construction projects are alike, but for those who have been working a long time in the industry, there are a handful of issues that just keep popping up. Commissioning managers must attempt to anticipate and resolve these issues, as often their salaries can be rapidly recouped by the cost-savings. Here are 8 of…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share
8 Mistakes Made in the Building Design Phase

No two construction projects are alike, but for those who have been working a long time in the industry, there are a handful of issues that just keep popping up. Commissioning managers must attempt to anticipate and resolve these issues, as often their salaries can be rapidly recouped by the cost-savings. Here are 8 of the most common design issues:

  1. Sequences of operation in mechanical equipment. Mechanical design documents often have incomplete sequences of operation or are sometimes completely missing.
  2. Lighting fixture mistakes. Lighting fixtures are often missing, leaving areas insufficiently lit and creating design headaches.
  3. Electrical equipment. From panel boards to transformers, sizing and specifications are often incomplete.
  4. Electrical distribution. Completely missing, serving the wrong device, and otherwise being unclear to contractors, circuits are a problem area in many ways.
  5. Designs missing life-safety systems. Ordering replacements for these essential systems creates costly delays and additional inspections.
  6. No plumbing shown. Designs regularly don’t include plumbing design, making for construction complications and potential delays.
  7. Moisture. Incorrect barriers and sealants can allow heat and moisture to intrude, allowing for costly degradation that is easy to miss.
  8. Mis-sized circuits. Commissioning managers must pay special attention to circuit capacity and ensure they’re the appropriate size, reducing or increasing them as needed.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one expert. Imagine publishing your whole team.

This article was produced through MarketScale. Create a free workspace and turn your own team's expertise into articles, video, and social posts. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

AI moves from back office to job site in construction's next build-out

AI moves from back office to job site in construction's next build-out

McCarthy Building Companies has entered a multimillion-dollar agreement with Palantir to enhance AI adoption. However, RICS experts highlight that data readiness and organizational culture pose significant challenges. This development signals a shift in integrating AI within construction sectors.

  • 01McCarthy Building Cos. signs a major deal with Palantir.
  • 02Data readiness is a critical hurdle for AI integration.
  • 03Organizational culture impacts AI adoption in construction.

Jul 11, 2026

South Korea commits $7.5 billion to AI-autonomous manufacturing as smart factory count hits 30,000

South Korea commits $7.5 billion to AI-autonomous manufacturing as smart factory count hits 30,000

South Korea is investing $7.5 billion in advancing AI-autonomous manufacturing, with a significant increase in smart factories, now totaling 30,000. The initiative also targets the development of 100 AI manufacturing zones throughout the country.

  • 01South Korea invests $7.5 billion in AI-autonomous manufacturing.
  • 02There are currently 30,000 smart factories in South Korea.
  • 03The government aims to develop 100 AI manufacturing zones.

Jul 11, 2026

Construction's productivity crisis: why ML cost forecasting and off-site methods are converging

Construction's productivity crisis: why ML cost forecasting and off-site methods are converging

U.S. construction productivity has decreased since 1968. Machine learning models and off-site construction methods are becoming pivotal in bridging this productivity gap by providing accurate cost forecasting and efficient building practices.

  • 01U.S. construction productivity has been declining since 1968.
  • 02Machine learning models offer enhanced cost forecasting capabilities.
  • 03Off-site construction methods contribute to improved project efficiency.

Jul 10, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512