Skip to content
MarketScale
‹ Back to IndustriesEnergy

Modernizing Power Grids Using Intelligent, Data-driven Technologies at the Edge

Fueled by increases in ecommerce and the number of devices that require electricity, the demand for reliable, renewable, and sustainable sources of electricity is increasing worldwide. In this episode of “To the Edge and Beyond,” Intel’s Adam Berniger and Prithpal Khajuria join Justin Honore to discuss the challenges facing energy producers and how Intel,…

This story was produced through MarketScale. See how Energy teams put it to work with Customer Stories & Case Studies.

Promoted content from Intel on MarketScale.

Share

Get featured

Want to get featured in MarketScale Energy?

Create a free MarketScale workspace and get your company's expertise featured across our Energy coverage. No credit card, no demo required.

Start free

Fueled by increases in ecommerce and the number of devices that require electricity, the demand for reliable, renewable, and sustainable sources of electricity is increasing worldwide. In this episode of “To the Edge and Beyond,” Intel’s Adam Berniger and Prithpal Khajuria join Justin Honore to discuss the challenges facing energy producers and how Intel, working with public and private partners, is creating an ecosystem of solutions to meet those challenges.

“Current energy grids are static,” says Khajuria. “In order to make use of renewable energy sources such as wind, solar, and water, they must become dynamic – meaning flexible and responsive to fluctuations in demand. The way to accomplish this is by injecting intelligent, data-driven technologies into the system.”

Adman Berniger, whose job involves blending innovation and analytics to develop effective solutions for Intel customers, agrees. “The need to modernize is pressing. By making use of technologies that enable us to store, predict, and shift energy to where it is needed at any given time, we can take advantage of the variable resources that are coming on board,” says Berniger. 

When Khajuria and Berniger talk about intelligent, data-driven power grids, they are referring to three things:

  • Bringing compute power to the edge so that data can be collected, analyzed, and used to make informed decisions about when and where energy is used;
  • Creating more multi-functional devices capable of virtualization; and
  • Connecting unconnected devices and data sets so that information and energy can be shared.

“The good news is that most of the technologies required for modernization have been around on the IT side for several decades,” says Berniger. “Intel is collaborating with both the public and private sectors to take advantage of proven technologies and establish best practices.”

Creating this ecosystem of partners is enabling energy producers to modernize their own infrastructures and resulting in innovative solution sets that might not otherwise have emerged. “Intel brought the whole ecosystem together,” Khajuria adds. “We’ve worked with hardware manufacturers to build rugged servers, software developers to build programs for those servers, and OEMs to bring their appliances to the edge.”

“This is really an exciting time to be working in the power industry,” says Berniger. “Industrial edge compute is finally coming of age.”

Connect with Adam Berniger and Prithpal Khujaria on LinkedIn.

To learn more about Intel’s Smart Energy IoT solutions visit: Intel.com/Energy

Subscribe to this channel on Apple Podcasts, Spotify, and GooglePodcaststo hear more from the Intel Internet of Things Group.   

Intel

Part of this channel

Intel

Silicon and AI platforms powering enterprise and edge compute.

Visit the channel

Your experts belong here

Every story in MarketScale Energy starts with a company putting its field engineers, operations leads, and project developers on the record. Buyers are already reading this topic. The only question is whose experts they find.

Developers and operators shortlist on credibility, and your engineers give your sales team something real to send.

Get your team featuredSee how it works15 minutes, straight to a calendar.

Follow Energy Insights

Get new expert content in your inbox.

Energy: are you visible to AI?

Before they reach out, Energy buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free plan

You just read one Energy expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your field engineers, operations leads, and project developers into the articles, video, and social content Energy buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale workspace, up to 10 people
One professional video edit a month for qualifying companies
Media requests to your crowd, remote recording, AI writing tools
$0, no credit card, nothing that expires

More Energy Insights

Power and utility deals hit a record $205 billion in the first half of 2026

Power and utility deals hit a record $205 billion in the first half of 2026

Power and utilities M&A hit a record $205 billion across 92 deals in the first half of 2026, Deloitte reports. NextEra Energy's $124 billion Dominion Energy merger led the way. PwC says buyers are paying for gas, grid and dispatchable assets that add capacity faster than new builds. Who pays for grid upgrades is now the open question for data centers and large loads.

  • 01Two megadeals, NextEra Energy's $124 billion merger with Dominion Energy and the $48 billion AES take-private, drove Deloitte's record $205 billion first-half total, according to Deloitte, so the headline figure says more about the largest players than about the 92-deal field as a whole.
  • 02PwC says buyers now favor assets with contracted offtake or direct exposure to large-load customers, alongside those with clear cost recovery, which makes contracted cash flows and who pays for grid upgrades questions a data center or plant operator should raise at its next utility meeting.
  • 03Where a jurisdiction assigns large-load costs (directly to data centers, through general rates, or through new contractual models) is becoming a valuation input for acquirers, so the tariff dockets being drafted now will shape both the power bill and who owns the utility.

Sep 15, 2026

NextEra Advances Duane Arnold Nuclear Restart With Federal Loan

NextEra Advances Duane Arnold Nuclear Restart With Federal Loan

NextEra Energy received a Department of Energy loan of up to $1.9 billion and Federal Energy Regulatory Commission approval to reconnect the shuttered Duane Arnold nuclear plant in Iowa to the grid. The company has already signed a 25-year electricity supply agreement with Google for the plant, which it aims to restart by early 2029.

  • 01NextEra closed a $1.9 billion DOE loan through the Office of Energy Dominance Financing to fund the Duane Arnold restart, targeting electricity production by early 2029.
  • 02Google committed to a 25-year power purchase agreement with Duane Arnold to support its cloud-computing and AI infrastructure in Iowa.
  • 03Duane Arnold is one of three shuttered U.S. nuclear plants restarting with federal financing, alongside Constellation Energy's Crane plant ($1 billion loan) and Holtec's Palisades plant ($1.52 billion loan).

Sep 12, 2026

India Order Could Free Up 15.7 GW of Renewable Grid Access

India Order Could Free Up 15.7 GW of Renewable Grid Access

India's Central Electricity Regulatory Commission ordered on July 11 that renewable developers surrender transmission rights or provide higher bank guarantees if their projects are not generating power, a change Reuters reported could free up roughly 15.7 gigawatts of grid connectivity. Reuters separately reported that coal still supplies about 70% of India's electricity generation as of an August 17 report.

  • 01CERC order requires renewable developers to either surrender transmission rights or post additional bank guarantees for non-generating projects.
  • 02Approximately 15.7 GW of grid connectivity held by awarded projects that are not generating power could be freed up; surrendered capacity would first go to existing applicants in the same substation cluster, with any remainder auctioned.
  • 03Developers and buyers evaluating projects in constrained substation clusters should verify current CERC connectivity status and guarantee backing, as auction-based allocation may alter cost and timing dynamics.

Sep 11, 2026

Explore More Energy Insights

Read more expert perspectives from across Energy.

Browse Energy Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Energy and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512