Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

What Can Be Done to Prevent Collapse Seen In Texas This Week?

An investigation is underway to find out what caused the collapse of an Irving, Texas parking garage earlier this week. Nobody was injured when part of the top level of the structure collapsed, damaging cars on multiple levels. However, the collapse of piece of public property is something nobody should be victim to and it…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share
What Can Be Done to Prevent Collapse Seen In Texas This Week?

Get featured

Want to get featured in MarketScale Engineering & Construction?

Create a free MarketScale workspace and get your company's expertise featured across our Engineering & Construction coverage. No credit card, no demo required.

Request an invite

An investigation is underway to find out what caused the collapse of an Irving, Texas parking garage earlier this week. Nobody was injured when part of the top level of the structure collapsed, damaging cars on multiple levels. However, the collapse of piece of public property is something nobody should be victim to and it raises questions about the state of American infrastructure.

Earlier this year, the American Society of Civil Engineers released its report card on the state of American infrastructure for 2017– and the final grade was a worrisome D+. The report card grades several different aspects of American infrastructure, evaluating everything from bridges, roads, schools, aviation, and even drinking water.

Although the ASCE has composed several report cards since 1988 that have dismal ratings, the cost of fixing these issues has risen dramatically. The report estimates more than $4.5 trillion in funding is to get the nation’s infrastructure back in working order. The cost of poor infrastructure is also not simply in annoying potholes or deteriorating dams and bridges—there is a significant economic impact that affects everything from job losses to GDP. An impact too costly to ignore.

According to a 2016 report by the ASCE, the losses accrued as a result of poor infrastructure are alarming to say the least. By 2025, the report estimates $3.9 trillion in losses to United States GDP, $7 trillion in lost business sales, and a staggering 2.5 million lost American jobs as a direct result of this crisis.

The cost is felt directly at home by consumers as well, with an average of $3,400 in disposable income lost for American families every year. The state of American infrastructure is currently in shambles and in a desperate need for public and private investment. As the economy continues to grow, jobs continue to be created, and Wall Street continues to prosper, fixing roads and bridges could very well be the final piece in bringing back competent American infrastructure.

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Get your team featuredSee how it works15 minutes, straight to a calendar.

Follow Engineering & Construction Insights

Get new expert content in your inbox.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

FAB 40 highlights top U.S. metal fabricators, including acquisitive Cadrex

The Fabricator’s 2023 FAB 40 ranks U.S. metal fabricators by reported revenue. PR Newswire reported Cadrex Manufacturing Solutions debuted at No. 2 with $480 million in 2022 revenue after a series of acquisitions, while MEC again held No. 1 with $539.4 million.

  • 01PR Newswire reported Cadrex Manufacturing Solutions entered The Fabricator’s 2023 FAB 40 at No. 2 after a series of acquisitions.
  • 02MEC’s long-running No. 1 position, with $539.4 million in reported 2022 revenue, reinforces what scale and repeatable process look like at the top of the list, according to PR Newswire.
  • 03PR Newswire flagged both material price inflation and demand as drivers of record revenues, buyers should press suppliers on what portion of growth was pricing versus volume.

Sep 6, 2026

HUD backs a 24-month study on mass-timber modules that ship and stack faster

HUD backs a 24-month study on mass-timber modules that ship and stack faster

HUD funded a 24-month Washington State University project on hybrid mass-timber modular housing. It targets transportability and faster site assembly. A 2023 Journal of Building Engineering review says 2D modular CLT tends to ship farther and build faster than 3D.

  • 01If transportation is the cost driver, HUD’s study plan points straight at the spec: treat the truck interface, tie-downs, and lifting points as part of the structural module design, not afterthought hardware.
  • 02The most actionable design fork in the CLT modular literature is 2D versus 3D: according to a 2023 Journal of Building Engineering review, 2D modules are typically moved longer distances and assembled faster on average.
  • 03Owners who want future change-of-use optionality can start writing it into module grids and connection details now. HUD-backed research is explicitly testing modules that can be repurposed across occupancies over their lifetime.

Sep 6, 2026

HUD’s 24-month mass timber modular project goes after the cost driver: shipping the modules

HUD’s 24-month mass timber modular project goes after the cost driver: shipping the modules

HUD is funding a 24-month Washington State University project to redesign modular housing modules around transport and fast site assembly. Shipping is the design constraint. A 2023 Journal of Building Engineering review of 2009–2021 modular CLT projects suggests faster construction timelines, but logistics choices still decide feasibility.

  • 01In modular housing, transportation is becoming a first-order engineering spec, the module that is cheapest to build can still be the most expensive to move.
  • 02The 2023 review found 2D modular CLT projects were, on average, transported farther and built faster than 3D ones, so configuration choice shapes both transport reach and install time.

Sep 5, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512