Prince Manufacturing has implemented IntelliFinishing's fully automated liquid paint system to enhance operational efficiency. The system features smart controls and a highly flexible conveyor system, improving throughput and finish quality. It is customizable, energy-efficient, and reduces operational costs while handling a variety of paint tasks.

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Promoted content from IntelliFinishing on MarketScale.

By MarketScale · · CarriersFlexibilityIntellifinishing SystemLiquid Paint System
Share
Prince Manufacturing Elevates Finishing with IntelliFinishing System

Key takeaways

01

Prince Manufacturing uses IntelliFinishing's system for automated painting.

02

The flexible system improves throughput and reduces operational costs.

03

It features smart controls and allows for process customization.

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

For more than five years, Prince Manufacturing – a maker of hydraulic cylinders, valves and pumps founded in 1941 and serving a wide variety of markets with four facilities across three states – has leveraged an IntelliFinishing fully automated liquid paint system to bring new efficiencies to its operation.

This system helps Prince uphold the quality, durability, craftsmanship and service it’s come to be known for around the globe.

The Challenge – A Liquid Paint System Bringing a Variety of Benefits

Prince needed a system that delivered consistent, high-quality results while applying liquid paint with minimal labor costs.

The primary focus of adding this system to the company’s operations was to enhance throughput without reducing quality and to ensure recipe flexibility, modularity, space savings, cost-effectiveness and reliability with little operational or maintenance cost.

The Solution – An IntelliFinishing Fully Automated Liquid Paint System

The system designed for Prince has a variety of unique benefits and capabilities.

Unique product loading functionality allows for the use of carts and a lift that is integrated to minimize labor. An operator can simply push a cart up to the load zone and hit a single button to engage the lift. The lift will then engage the detachable load bar resting on the cart and take it with a loaded set of products up to system height, where it begins moving off through the system automatically based on its recipe specifications for that carrier.

The load bar is unique in that each set of cylinders or valves are spun while in the wash to maximize wash impingement, during blow-off to help dry the parts, and, most importantly, during the robotic paint application. Wash stage duration can also be combined with the spin process to help especially dirty items achieve desired cleanliness.

Further, the robotic paint process is unique because the up/down reciprocating robotic paint gun system is integrated with information about each part presented, including the product’s length, width and weight. This tells the gun program exactly how to paint each part with minimal overspray and very consistent finish quality. There are no manual spray operators required on this system.

The cure oven is also unique in that the conveyor track allows for carriers to move “on-bias,” shortening the oven size and the overall footprint of the system. After the final cure and cool down, the system allows for carriers of products to stop over a masking platform so that all final products are stickered with brand and product model information before unloading from the system and final assembly/packaging.

Finally, unloading is unique in that the carrier of finished products moves to the automatic load/unload lift right after a starting carrier (i.e., unfinished parts) has moved on. The lift brings the entire load of products down upon the waiting cart and automatically drops the removable load bar onto the cart’s waiting cradle. As soon as this is secured, a mechanism pushes the cart about a foot away from the load zone to signify to the operator that the cart can now be rolled over to the final assembly and shipping area.

The Results – Incredible Throughput and Quality Prince Is Proud Of

The system was integrated with Prince’s desired process to spin the product on its vertical axis in the wash, during blow off and during the painting process, giving their long, vertical cylinders and boxy hydraulic valves a fantastic coat of paint.

Since their parts vary in size, part data integrates with their robotic paint gun system and the racking system to paint each part to exact specifications without any manual intervention. The system was able to fit inside the desired footprint by using deadhead turns, an on-bias conveyor in the oven and other means.

The system can process about 25 carriers of parts per hour. Typically, Prince starts their system at 7:30 a.m. and completes the finishing of all needed parts by 2:30 p.m. each day. Within those seven hours, their IntelliFinishing System can produce more finished parts than Prince was previously able to finish at all three of their other locations – operating 24/7 and using manual paint processes.

The system is leaner than traditional systems, modular to provide long-range flexibility to change the system or grow it as system demands or processes change, and saves Prince on costs, with high uptime levels and more, particularly when compared to inefficient, outdated chain-based conveyorized finishing systems.

As a bonus, the system is much safer than manually painting their parts, as their cylinders can be quite heavy – up to 100 pounds each or more. By pre-racking the parts on their custom-designed carts in fabrication, they have reduced part handling tremendously during the finishing process.

IntelliFinishing

Part of this channel

IntelliFinishing

The Most Flexible Paint Systems in the Industry

Visit the channel

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

North Texas Data Centers Boom, Mechanical Trades Constrain

North Texas Data Centers Boom, Mechanical Trades Constrain

Mechanical trades now shape liquid-cooled data center schedules

  • 01DFW data center construction faces mechanical workforce constraints
  • 02Mechanical trades are crucial for data center deployment timelines.

Nov 2, 2026

Brock's 3D scaffold model replaced 1,400+ standby hours with <25

Brock's 3D scaffold model replaced 1,400+ standby hours with <25

Brock Group executives Enrique Zavala and Brent Roscoe argue scaffolding belongs in the BIM model from the start of an industrial project. BIC Magazine reports one Brock 3D model replaced more than 1,400 budgeted standby hours with under 25 hours of rework. Peer-reviewed studies support BIM-based planning and forecasting, while noting scaffold modeling and laser scanning still demand specialized skills.

  • 01On one three-month project, BIC Magazine reports, a Brock 3D scaffold model left one minor field change and under 25 labor hours of rework against more than 1,400 budgeted standby hours.
  • 02A 2017 IAARC paper found scaffolding is usually left out of the BIM model, and a June 2024 MDPI case study found scan-to-BIM needs specialized equipment and skills, so the gains are not automatic.

Nov 2, 2026

CivDot robots shift surveyors to control and spot checks

CivDot robots shift surveyors to control and spot checks

On robotic layout jobs, the surveyor's work shifts to setting control and spot-checking the machine's marks.

  • 01On robotic layout jobs, the surveyor keeps the control network and the spot checks, the two tasks that decide whether thousands of machine-set marks are right.
  • 02Autonomy is most advanced offshore and underground, where work is risky and costly; routine low-risk jobs are adopting it more slowly.

Nov 1, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

About the Expert

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512