Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

Manufacturing a Stronger Standard: Robotic Finishing: More Than Programming a Path

In the latest episode of the podcast “Manufacturing a Stronger Standard,” host Derek DeGeest, President of DeGeest Corporation and LestaUSA, talked about robotic finishing and what needs to be discussed prior to creating painting programs and after. Despite the advanced technology available to support programming, there are still challenges we need to be aware of. He contended that “finishing is…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Share

In the latest episode of the podcast “Manufacturing a Stronger Standard,” host Derek DeGeest, President of DeGeest Corporation and LestaUSA, talked about robotic finishing and what needs to be discussed prior to creating painting programs and after. Despite the advanced technology available to support programming, there are still challenges we need to be aware of. He contended that “finishing is far more complex than just a programming painting path. In fact, the path is just the beginning,” said DeGeest.

There are many variables that play a role in creating programming paths and running production for robotic painting and finishing. Particularly, because there are many other factors that can greatly affect how the once perfect robots program performs. And, the idea that paint is more forgiving as opposed to welding and other applications is a big misconception.

“We all know that the standard industrial painting robot options that were out there were not fast enough to automate the painting process. It wasn’t adaptable to process enough parts or programs to handle finish lines,” said DeGeest. “So now, as new technology is starting to come out, people are seeing we can make a program path faster…. But, thinking that’s enough is a big mistake.”

The types of issues that can arise even with foolproof programming can be right or wrong application equipment, paint or powders, maintenance related, booth related, compressed air issues or even environmental. Seasonal changes are important to consider as well when programming because a programming path that was reliable in a cooler January can present a problem in a humid August.

“Both your software and the connection between your equipment and your robot need to be able to adapt to make sure you’re going to be successful as these variables come up over and over and over again.”

LestaUSA’s self-learning robots are adaptable and designed to resolve the common issues that arise for finishing applications. “This robot has specifically been made to work in finishing. That’s the only thing it was designed to do and all of the software, all of the integration, and all of the different variables that people have had for decades have been addressed and found ways to overcome. Combined with the right support system from equipment supplier, distributor and integrator, finishing automation is absolutely possible,” said DeGeest.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one expert. Imagine publishing your whole team.

This article was produced through MarketScale. Create a free workspace and turn your own team's expertise into articles, video, and social posts. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

AI moves from back office to job site in construction's next build-out

AI moves from back office to job site in construction's next build-out

McCarthy Building Companies has entered a multimillion-dollar agreement with Palantir to enhance AI adoption. However, RICS experts highlight that data readiness and organizational culture pose significant challenges. This development signals a shift in integrating AI within construction sectors.

  • 01McCarthy Building Cos. signs a major deal with Palantir.
  • 02Data readiness is a critical hurdle for AI integration.
  • 03Organizational culture impacts AI adoption in construction.

Jul 11, 2026

South Korea commits $7.5 billion to AI-autonomous manufacturing as smart factory count hits 30,000

South Korea commits $7.5 billion to AI-autonomous manufacturing as smart factory count hits 30,000

South Korea is investing $7.5 billion in advancing AI-autonomous manufacturing, with a significant increase in smart factories, now totaling 30,000. The initiative also targets the development of 100 AI manufacturing zones throughout the country.

  • 01South Korea invests $7.5 billion in AI-autonomous manufacturing.
  • 02There are currently 30,000 smart factories in South Korea.
  • 03The government aims to develop 100 AI manufacturing zones.

Jul 11, 2026

Construction's productivity crisis: why ML cost forecasting and off-site methods are converging

Construction's productivity crisis: why ML cost forecasting and off-site methods are converging

U.S. construction productivity has decreased since 1968. Machine learning models and off-site construction methods are becoming pivotal in bridging this productivity gap by providing accurate cost forecasting and efficient building practices.

  • 01U.S. construction productivity has been declining since 1968.
  • 02Machine learning models offer enhanced cost forecasting capabilities.
  • 03Off-site construction methods contribute to improved project efficiency.

Jul 10, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512