Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

How Polygon’s Smart Moisture Control System Protected a Mass Timber Student Housing Project

Polygon implemented a smart moisture control solution in a mass timber student housing project at the University of the Fraser Valley. Sean Smith, the Vancouver Branch Manager, led the initiative, using sensors and a network of dehumidifiers to manage moisture and optimize energy use. This system mitigated potential delays and improved structural integrity in a damp climate.

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Promoted content from Polygon on MarketScale.

By MarketScale · Building TechnologyClark BuildersClt ConstructionMass Timber
Share

Key takeaways

01

Polygon used over 50 sensors for real-time moisture monitoring.

02

The system optimized energy use with intelligent dehumidifiers.

03

Automation prevented weather-induced construction delays.

Amid the rise of sustainable architecture, mass timber has become a powerful symbol of progress — a material that marries renewable design with modern efficiency. Yet, in the damp climate of Vancouver, BC, sustainability meets its match: moisture. Managing humidity levels in large-scale wood construction isn’t just a matter of comfort; it’s about protecting structural integrity, schedule, and long-term performance. For the University of the Fraser Valley’s new student housing project, these challenges were amplified by the region’s relentless rainfall and the building’s unique E-shaped design, which trapped moisture in stubborn corners.

Enter Polygon — and more specifically, Sean Smith, the company’s Vancouver Branch Manager. Tasked by Clark Builders to safeguard the project, Smith and his team engineered a fully integrated moisture control system that turned real-time data into action. Over 50 sensors were installed across the site to monitor both ambient conditions and the internal moisture levels of the CLT (cross-laminated timber) floors. These sensors communicated directly with an intelligent network of desiccant dehumidifiers and heaters, automatically adjusting output to maintain optimal conditions.

The result? A system that not only protected materials but also optimized energy use and streamlined workflow. Manual moisture checks were replaced by live dashboards, and project teams gained confidence backed by data, not guesswork. What could have been weeks of weather-induced delays turned into a masterclass in proactive environmental control.

To understand how smart systems and strategic thinking kept this mass timber project on track — and why automation may be the future of construction moisture management — we turn to Sean Smith, Branch Manager at Polygon, who helped lead the charge on the University of the Fraser Valley’s student housing project.

Polygon

Part of this channel

Polygon

Interior climate control and remediation for commercial property teams.

Visit the channel

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one Engineering & Construction expert. Imagine publishing your whole team.

This article was produced through MarketScale. Create a free workspace and turn your own team's Engineering & Construction expertise into the articles, video, and social content B2B marketing buyers in your industry are searching for. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

U.S. warehouse construction jumps 18% as data-center supply chains drive industrial real estate recovery

U.S. warehouse construction jumps 18% as data-center supply chains drive industrial real estate recovery

Industrial real estate construction in the U.S. reached over 305 million square feet in the second quarter of 2026, an 18% increase from the previous year. The surge is largely driven by demand from data-center equipment suppliers. This trend highlights the growing influence of data centers on industrial real estate recovery.

  • 01U.S. industrial real estate construction increased by 18% year-over-year in Q2 2026.
  • 02Demand for new constructions is primarily driven by data-center equipment suppliers.
  • 03Over 305 million square feet of industrial space is under development.

Aug 1, 2026

U.S. industrial vacancy falls below 7% as Q2 2026 leasing hits its strongest pace since mid-2022

U.S. industrial vacancy falls below 7% as Q2 2026 leasing hits its strongest pace since mid-2022

Cushman & Wakefield's Q2 2026 report reveals a net absorption of 62.1 million square feet in the U.S. industrial market, with vacancy rates falling below 7%. This trend is significantly impacting lease negotiation leverage for industrial occupants.

  • 01Net absorption in the U.S. industrial market reached 62.1 million square feet in Q2 2026.
  • 02Vacancy rates in the U.S. industrial sector have tightened to below 7%.
  • 03Strong leasing activity is reshaping negotiation leverage for industrial tenants.

Aug 1, 2026

U.S. warehouse construction is up 18% as data-center supply chains drive the industrial real estate rebound

U.S. warehouse construction is up 18% as data-center supply chains drive the industrial real estate rebound

U.S. warehouse construction has seen an 18% increase in Q2 2026 compared to the previous year. This growth is predominantly propelled by demand from data-center equipment suppliers. With over 305 million square feet of warehouse space currently under construction, the industrial real estate market is experiencing a significant rebound.

  • 01U.S. warehouse construction has increased by 18% year over year in Q2 2026.
  • 02Over 305 million square feet of warehouse space is currently under construction.
  • 03The rise in construction is driven by demand from data-center equipment suppliers.

Aug 1, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

About the Expert

M
MarketScale

Vancouver Branch Manager at Polygon

Sean Smith is the Vancouver Branch Manager at Polygon, a company focused on interior climate management and remediation. He played a key role in engineering a moisture control system for the University of the Fraser Valley's mass timber housing project. Smith and his team deployed over 50 sensors to monitor conditions, aiding in the protection and energy efficiency of the construction.

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512