Skip to content
‹ Back to IndustriesEngineering & Construction

Construction Job Openings Rise as Dodge Index Slips 0.4%

The Dodge Momentum Index slipped 0.4% to 282.0 in August 2026, according to Dodge Construction Network, while Associated Builders and Contractors reported construction job openings rose to 326,000 in July, near a two-year high. Separate reporting covered a new multiskilled-labor dataset from the Simplar Foundation and an unresolved federal copper tariff decision.

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

By MarketScale Newsroom · · ConstructionDodge Momentum IndexLabor MarketAbc
Share
Construction Job Openings Rise as Dodge Index Slips 0.4%

Key takeaways

01

Construction job openings reached 326,000 in July 2026, up 28,000 from the prior month and near the highest level in almost two years

02

Multiskilled crews in the study spent a larger share of time on direct construction work and less time idle compared with single-trade crews

03

The Dodge Momentum Index measures projects entering planning, not current staffing conditions, so a declining index alongside rising job openings reflect different parts of the construction pipeline

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

The Dodge Momentum Index (DMI), tracked by Dodge Construction Network, declined 0.4% in August 2026 to 282.0 (2000=100), down from a downwardly revised July reading of 283.0, according to Construction Business Owner's report on the Dodge release. Commercial planning fell 3.0% for the month while institutional planning rose 4.9%. Year over year, the DMI was up 4.2% compared with August 2025, driven largely by data center activity in the commercial segment.

Job openings near a two-year high

Associated Builders and Contractors reported that construction job openings reached 326,000 on the last day of July 2026, an increase of 28,000 from the prior month and near the highest level in almost two years, based on ABC's analysis of U.S. Bureau of Labor Statistics JOLTS data, as reported by Construction Business Owner. The JOLTS measure counts any unfilled position for which an employer is actively recruiting, and the data does not distinguish newly created roles from long-vacant ones. ABC's report was published Sept. 1, 2026, describing July conditions.

Taken together, a planning index that ticked down alongside job openings that rose is a reminder that Dodge's index measures projects entering planning, not current staffing conditions. The two data points describe different parts of the construction pipeline and should not be read as confirming or contradicting each other.

New research on multiskilled labor

Construction Executive reported that Associated Builders and Contractors highlighted a new dataset from the Simplar Foundation, produced with researchers from Arizona State University, the University of Kansas and the University of North Carolina at Charlotte, describing it as the largest national dataset on multiskilled construction labor. According to the report, the study observed 60 crews totaling 644 workers across 36 projects in 24 states, drawing on more than 11,400 productivity observations. The research found that multiskilled crews spent a larger share of time on direct construction work and less time idle compared with single-trade crews, and that participating contractors reported an average Total Recordable Incident Rate of 0.74, which the study said was below an industry benchmark. These figures come from the study as reported by Construction Executive and describe observed conditions on the specific projects sampled, not the industry overall.

Copper tariff decision remains unresolved

Reuters reported on Sept. 10, 2026, that the White House has not made a final decision on a proposed tariff on refined copper, citing two people familiar with the matter. Copper is a material used across construction, electronics and other industries. Reuters did not report any change to current copper prices or supply conditions tied specifically to the construction sector as a result of the pending decision.

MarketScale analysis

MarketScale analysis: These three reports describe separate data points rather than one unified trend. Elevated job openings suggest continued hiring activity in the sector, but ABC's data does not indicate how many openings reflect new demand versus backfill. The multiskilling research documents an approach some contractors use to manage crew coverage, though its measured benefits applied to the specific projects studied and should not be generalized industry-wide. The copper tariff decision remains undetermined, and no sourced reporting describes how individual contractors are responding to that uncertainty.

Featured companies

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.

About the author

MarketScale Newsroom
MarketScale NewsroomEditorial Team, MarketScale

The MarketScale Newsroom reports on the companies, technologies, and trends shaping 16 B2B industries. It turns primary sources and expert commentary into clear, useful coverage for the people doing the work.

B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

Facing a 500,000-worker gap, a builder makes the case for modular chip and battery plants

Facing a 500,000-worker gap, a builder makes the case for modular chip and battery plants

Matt Willson of Holland Construction Services backs factory-built, digitally modeled modules. Independent evidence, including 2011 Construction Industry Institute case studies, points to schedule gains but finds cost savings much less reliable.

  • 0145% of contractors say a project ran late because they couldn’t staff it, making crew availability a bid-time question for owners planning a new plant.
  • 02Once modules are fabricated, design changes can’t be made, pushing decisions and costs earlier in the project.

Oct 16, 2026

Jemal and DivcoWest plan 323 apartments inside a 1982 DC office building

Jemal and DivcoWest plan 323 apartments inside a 1982 DC office building

Jemal Real Estate Strategies and DivcoWest plan to convert 1255 23rd Street NW, a 342,000-square-foot Washington, D.C. office building, into about 323 apartments. Madison Realty Capital lent $40 million for acquisition and predevelopment. DivcoWest is the current owner of the property and will retain an equity interest.

  • 01About 323 apartments at 1255 23rd Street NW would come close to the nearly 350 units Jemal Real Estate Strategies has created across its Syracuse and Richmond conversions combined, in a single building.
  • 02DivcoWest is selling into the venture but keeping an equity stake alongside Jemal.

Oct 12, 2026

Why a clean-looking aerospace part can still fail a residue test

Why a clean-looking aerospace part can still fail a residue test

Element Materials Technology explains NVR and gravimetric cleanliness testing for aerospace, defense and medical parts in a webinar featuring its Hartford and Los Angeles labs. Joe Moore and Katie Legowski show how a blank analysis, a solvent rinse and a weighed filter patch turn invisible residue into a number against IEST-STD-CC1246 levels, and how AMS 2700 F changed the passivation acid default in 2018.

  • 01Nonvolatile residue testing weighs what a solvent rinse removes from a part, so a film the eye cannot see becomes a pass or fail figure against the drawing.
  • 02IEST-STD-CC1246E, the document that replaced MIL-STD-1246 in 2002, sets residue limits from 10 nanograms to 25 milligrams per 0.1 square meter, and its particle levels count down to 5 microns, far below the 100 micron width of a hair.

Oct 12, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

About the Expert

MarketScale Newsroom
MarketScale Newsroom

Editorial Team

MarketScale

The MarketScale Newsroom reports on the companies, technologies, and trends shaping 16 B2B industries. It turns primary sources and expert commentary into clear, useful coverage for the people doing the work.

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512