Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

Applied Digital’s Data Center Design for a 100 MW AI Factory Built from the Ground Up

Applied Digital has launched a series on designing an AI-first facility, focusing on infrastructure capable of scaling from 100 to 400 megawatts. The project, Polaris Forge 1, is located in North Dakota, chosen for its renewable energy resources and ideal cooling climate. Liquid-cooled racks and dense GPU clusters are a focal point to support evolving AI workloads.

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Promoted content from Hai Robotics on MarketScale.

By Software And Technology · Ai CampusAi WorkloadsApplied DigitalBrian Hasemann
Share

Key takeaways

01

Applied Digital is focusing on building AI-specific data centers from scratch.

02

Ellendale, North Dakota, was selected for its scalable land and energy resources.

03

The facility supports liquid cooling and is designed for future scalability.

AI workloads are redefining the limits of data center design and infrastructure. Legacy data centers, built for traditional co-location, cannot handle the density, thermal demands, or power dynamics of accelerated computing. The AI boom has upended the data center sector, forcing a rapid shift to liquid-cooled racks as facilities pivot from sub-10kW racks to 120kW racks. According to NVIDIA’s 2025 GTC roadmap, the company is now targeting 600kW racks by the end of 2027—a dramatic escalation that demands a complete rethinking of infrastructure design. In this climate, starting fresh isn’t a luxury—it’s a requirement.

So, how do you design an AI-first facility that can scale from 100 to 400 megawatts and stay relevant as the pace of innovation accelerates?

Welcome to the first episode of Architects of Acceleration—a five-part series from Applied Digital that takes you behind the scenes of one of the most ambitious AI infrastructure projects in the U.S. In this premiere episode, host Philbert Shih, founder of Structure Research, sits down with Todd Gale, the Chief Development Officer, and Brian Hasemann, the Design Services Manager at Applied Digital, to unpack the full design strategy behind Polaris Forge 1, a greenfield AI campus in Ellendale, North Dakota. Together, they walk through the blueprint, site selection, power procurement, and thermal architecture that shaped Applied Digital’s first 100 MW AI Factory.

What You’ll Learn in This Episode:

  • Why Applied Digital Built from Scratch: A greenfield approach allowed the team to build around 1,000–1,500 watts/sq. ft. workloads and eliminate retrofitting compromises.
  • Why Rural North Dakota: Ellendale offers scalable land, renewable wind energy, free cooling climate conditions, and power pricing advantages ideal for AI workloads.
  • How It Supports AI Workloads: The facility is optimized for liquid cooling and purpose-built to host dense GPU clusters, including evolving rack-level demands.
  • How the Campus Will Scale: The site is designed to grow from 100 MW to 400 MW, with ELN03 and ELN04 incorporating lessons from the first build for even greater flexibility.

Todd Gale is a veteran data center engineer and executive with over four decades of experience designing mission-critical infrastructure at a global scale. As Chief Development Officer at Applied Digital, he leads the strategy, design, and construction of next-generation AI data centers, including the Ellendale Campus, purpose-built for GPU workloads. Previously, he held senior roles at Flexential, Equinix (formerly Terremark), and AT&T, where he pioneered innovations in low Power Usage Effectiveness (PUE) architecture, Tier IV-certified facilities, and hyperscale cooling systems.

Brian Hasemann is Director of Data Center Design at Applied Digital, where he leads the development of mission-critical infrastructure for high-density AI workloads. With a background in mechanical engineering and project management, he has overseen major design efforts and facility assessments across data centers, hospitals, and large-scale commercial properties. Before joining Applied Digital, he held engineering and commissioning roles at EBI Consulting and Shire, bringing hands-on experience in HVAC, utility systems, and CMMS optimization across complex environments.

Article written by MarketScale.

Hai Robotics

Part of this channel

Hai Robotics

Logistics robots that increase warehouse density and picking speed

Visit the channel

About the author

SA
Software And Technology

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one Engineering & Construction expert. Imagine publishing your whole team.

This article was produced through MarketScale. Create a free workspace and turn your own team's Engineering & Construction expertise into the articles, video, and social content B2B marketing buyers in your industry are searching for. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

U.S. warehouse construction jumps 18% as data-center supply chains drive industrial real estate recovery

U.S. warehouse construction jumps 18% as data-center supply chains drive industrial real estate recovery

Industrial real estate construction in the U.S. reached over 305 million square feet in the second quarter of 2026, an 18% increase from the previous year. The surge is largely driven by demand from data-center equipment suppliers. This trend highlights the growing influence of data centers on industrial real estate recovery.

  • 01U.S. industrial real estate construction increased by 18% year-over-year in Q2 2026.
  • 02Demand for new constructions is primarily driven by data-center equipment suppliers.
  • 03Over 305 million square feet of industrial space is under development.

Aug 1, 2026

U.S. industrial vacancy falls below 7% as Q2 2026 leasing hits its strongest pace since mid-2022

U.S. industrial vacancy falls below 7% as Q2 2026 leasing hits its strongest pace since mid-2022

Cushman & Wakefield's Q2 2026 report reveals a net absorption of 62.1 million square feet in the U.S. industrial market, with vacancy rates falling below 7%. This trend is significantly impacting lease negotiation leverage for industrial occupants.

  • 01Net absorption in the U.S. industrial market reached 62.1 million square feet in Q2 2026.
  • 02Vacancy rates in the U.S. industrial sector have tightened to below 7%.
  • 03Strong leasing activity is reshaping negotiation leverage for industrial tenants.

Aug 1, 2026

U.S. warehouse construction is up 18% as data-center supply chains drive the industrial real estate rebound

U.S. warehouse construction is up 18% as data-center supply chains drive the industrial real estate rebound

U.S. warehouse construction has seen an 18% increase in Q2 2026 compared to the previous year. This growth is predominantly propelled by demand from data-center equipment suppliers. With over 305 million square feet of warehouse space currently under construction, the industrial real estate market is experiencing a significant rebound.

  • 01U.S. warehouse construction has increased by 18% year over year in Q2 2026.
  • 02Over 305 million square feet of warehouse space is currently under construction.
  • 03The rise in construction is driven by demand from data-center equipment suppliers.

Aug 1, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

About the Experts

SA
Software And Technology
PS
Philbert Shih

Founder

Structure Research

TG
Todd Gale

Chief Development Officer

Applied Digital

Todd Gale is a veteran data center engineer and executive with over four decades of experience designing mission-critical infrastructure at a global scale. As Chief Development Officer at Applied Digital, he leads the development of AI-centric facilities.

BH
Brian Hasemann

Design Services Manager

Applied Digital

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512