Skip to content
MarketScale
‹ Back to IndustriesEnergy

Cooler News: The Technology Moving Equipment Enclosures Forward

Mining oil and gas is essential to human civilization currently. However, the public does not often think of the massive machinery and equipment that are responsible for energy infrastructure, and thus make the modern lifestyle viable. This equipment, most often large, is also fragile and must be cared for. Today, we dive into how…

This story was produced through MarketScale. See how Energy teams put it to work with Customer Stories & Case Studies.

Promoted content from KPS Global on MarketScale.

Share

Get featured

Want to get featured in MarketScale Energy?

Create a free MarketScale workspace and get your company's expertise featured across our Energy coverage. No credit card, no demo required.

Request an invite

Mining oil and gas is essential to human civilization currently. However, the public does not often think of the massive machinery and equipment that are responsible for energy infrastructure, and thus make the modern lifestyle viable.

This equipment, most often large, is also fragile and must be cared for. Today, we dive into how vital it is to keep this equipment in lasting condition and how these machines are cared for.

Kevin Piel, Director of Business Development for KPS Global, joins the podcast to expand upon equipment enclosures and how the company stays on top of keeping oil, gas, wastewater, and renewables accessible today and for years to come.

Energy knows no time zone. Sometimes mining happens in the world’s most remote corners and its harshest environments. From Alaska to Northern Canada and beyond, KPS Global must go where the equipment goes.

Piel points out that KPS Global’s enclosures must protect against these harsh conditions. Enclosures are crucial to protecting these machines and equipment from the wear and tear of Mother Nature. If left out in the environment, the equipment is prone to fail. Because of these specific needs, KPS Global has created panels that are compact for travel to even the most remote areas. The panels are modular and insulated and can fit the unique contours of specific equipment. With pre-fabricated panels, it becomes easier to assemble them onsite.

Panels, in and of themselves, are energy efficient, Piel said. The very act of preserving equipment to have a longer life reduces waste. With a network of educated professionals around the country, KPS Global can deploy installation experts in the area to help with safe setup and installation of the protective panels. No matter the environment, be it desert, forest, or in an urban city, KPS Global has the enclosure to blend into its surroundings, making it the invisible heroes of energy infrastructure.

For the latest news, videos, and podcasts in the Building Management Industry, be sure to subscribe to our industry publication.

Follow us on social media for the latest updates in B2B!

Twitter – @BuildingMKSL

Facebook – facebook.com/marketscale

LinkedIn – linkedin.com/company/marketscale

KPS Global

Part of this channel

KPS Global

Insulated panel systems for every cold storage application.

Visit the channel

Your experts belong here

Every story in MarketScale Energy starts with a company putting its field engineers, operations leads, and project developers on the record. Buyers are already reading this topic. The only question is whose experts they find.

Developers and operators shortlist on credibility, and your engineers give your sales team something real to send.

Get your team featuredSee how it works15 minutes, straight to a calendar.

Follow Energy Insights

Get new expert content in your inbox.

Energy: are you visible to AI?

Before they reach out, Energy buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one Energy expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your field engineers, operations leads, and project developers into the articles, video, and social content Energy buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Energy Insights

Petrobras Subsea Tender Draws $1.4 Billion in Bids

Petrobras Subsea Tender Draws $1.4 Billion in Bids

Petrobras' tender for corrosion-resistant subsea risers attracted bids totaling about $1.4 billion, Upstream reported on September 8, 2026. Separately, Upstream reported L&T Energy Hydrocarbon Offshore won a contract worth up to $526 million from ONGC, and World Oil reported Decom Engineering has secured nine offshore mooring chain projects in 2026.

  • 01Petrobras subsea riser tender attracted approximately $1.4 billion in bids from Baker Hughes, NOV Flexibles, and TechnipFMC in September 2026
  • 02L&T Energy Hydrocarbon Offshore won a contract worth up to $526 million from ONGC for subsea pipeline replacement on Indian offshore fields Ratna-I and NLM-14
  • 03Decom Engineering has secured nine offshore mooring chain cutting projects so far in 2026, expects its fleet to reach 14 units by year-end, and has units deployed or mobilizing in Brazil, Canada, the US, the UK North Sea and Cameroon

Sep 10, 2026

HFT Stores Battery and Charger Best Practices

HFT Stores Battery and Charger Best Practices

Harbor Freight Stores focuses on best practices for battery and charger maintenance. Implementing efficient storage and charging techniques can extend the life of batteries and improve performance. Regular maintenance and proper handling are crucial for safety and longevity.

  • 01Implement efficient storage to extend battery life.
  • 02Regular maintenance is crucial for battery safety.
  • 03Proper charging techniques improve battery performance.

Sep 9, 2026

Grid OEMs are racing to build in the U.S., but transformers still take 2–3 years

Grid OEMs are racing to build in the U.S., but transformers still take 2–3 years

Grid equipment makers are expanding U.S. production for transformers, breakers, and high-voltage cable. POWER Magazine still puts power transformer and GSU lead times at 2–3 years. That keeps utility schedules exposed.

  • 01Transformer procurement is now a schedule risk, not a line item: POWER Magazine pegs power transformer and GSU lead times at 2–3 years, long enough to dictate substation cutovers and interconnection dates.
  • 02Big batteries are moving into “grid equipment” territory: ASCE’s profile of Plus Power’s Kapolei project underscores how storage can deliver large, fast-acting capacity, which can affect how operators specify protection, controls, and service contracts.

Sep 6, 2026

Explore More Energy Insights

Read more expert perspectives from across Energy.

Browse Energy Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Energy and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512