Skip to content
‹ Back to IndustriesEducation Technology

EXPLORING THE PROBLEM OF MOLD IN SCHOOLS: PREVENTION AND REMEDIATION BEST PRACTICES

Mold can be a dangerous threat when it grows undetected and untreated. When mold develops in certain settings, many people can be exposed to its harmful effects. In an educational environment, mold can be a hidden hazard that can significantly impact students and staff, especially those with allergies or respiratory issues. Mold requires oxygen, water,…

This story was produced through MarketScale. See how Education Technology teams put it to work with Executive Thought Leadership.

Promoted content from Polygon on MarketScale.

·
Share
EXPLORING THE PROBLEM OF MOLD IN SCHOOLS: PREVENTION AND REMEDIATION BEST PRACTICES

Free workspace

Turn your Education Technology expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

Mold can be a dangerous threat when it grows undetected and untreated. When mold develops in certain settings, many people can be exposed to its harmful effects. In an educational environment, mold can be a hidden hazard that can significantly impact students and staff, especially those with allergies or respiratory issues.

Mold requires oxygen, water, and a source of food to grow. It can populate in wood, paper, carpet, food, and insulation, making schools a primary target for mold growth. The key to preventing mold, however, is to control moisture. To best understand the risk and the steps to take to inhibit or remediate mold, it’s critical to know how and when it grows.

What Causes Mold in School Buildings

Mold is versatile in that it can grow almost anywhere. It favors warm temperatures and high humidity. This creates a perfect environment for mold cultivation. It also grows fast. According to the Federal Emergency Management Association (FEMA), surface mold can appear in only 24 to 48 hours. HVAC leaks, plumbing leaks, water damaged plywood, and drywall, or other unventilated areas make an ideal breeding ground for mold. To ensure mold doesn’t have a chance to form, a building should be kept ventilated and dry and have its major systems, such as HVAC and plumbing, serviced regularly.

Mold Finds Life When School Isn’t in Session

One of the unique things about schools and universities is that they are left dormant for periods of time, especially over summer breaks. These uninhabited environments tend to be more prone to mold growth. Thus, school administrators and facility managers need to understand the risks for mold.

Often, regular maintenance such as painting or carpet cleaning can increase moisture within a building, frequently leading to mold infestation. The summer weather in some climates adds even more humidity. The HVAC system may be off for long periods of time as well, allowing moisture to enter the building. There are many other entry points for water including roof and window leaks that may not be found for weeks. By that time, mold has been able to grow and multiply. All of these possibilities make it essential for school stakeholders to create a plan to check the facility on a regular basis while school is not in session.

Mold Stories: Tales of Caution

Just as the semester began at the University of Tennessee this fall, 600 students had to vacate their living quarters after mold was identified in their dorm. As soon as the mold was discovered, remediation began, resulting in much scrambling to rehouse the displaced. Additional dormitories were also tested on the campus to ensure this wasn’t a pervasive problem. The university stated that dorms had been inspected before the fall semester, but no mold was detected until months later. Luckily, no illnesses were reported. Could this mold have been prevented? Possibly—with the right climate control system.

Another college, St John’s Queens Campus, discovered a mold problem in one of their main AC units. By the time it was found, a group of students was already experiencing symptoms of illness. Students were concerned about the building and even contacted a local news channel to investigate. The school responded that the mold was the product of high humidity, and the areas had been properly remediated. It’s just another example of how mold can grow quickly and cause maladies rapidly.

Legislators Recognize the Threat of Mold in Schools

While most schools and universities have a formal response strategy for dealing with mold, legislators are responding to the ever-looming threat as well. In fact, a New Jersey state legislator has proposed a bill that would put into effect a law that requires the proper inspections and treatments for mold in schools. The assemblyman behind the bill introduced it in response to the dozens of schools in New Jersey where mold had been found in the past year, and the safety concerns the fungus presents. This new bill is likely to have overwhelming support and could be part of New Jersey law soon.

Think Prevention First

Prevention of mold is, of course, much less costly than recovery. Thus, it’s essential for every school to have a mold prevention plan. Prevention has an average cost of $6-$12 per square feet, whereas the recovery of mold-infested documents and books can cost $250-$400 per cubic feet based on severity—quite a substantial difference in cost.

The primary goal of schools and universities should be finding a partner that understands the unique challenges of their particular industry. The ideal partner will recognize not only the importance of indoor air quality to the students and faculty inhabiting the building, but that schools often have periods of inactivity when water damage can easily go unnoticed, and therefore, untreated.

To prevent and remediate mold when a water event does occur, it is critical that a school implement a temporary climate solution immediately, such as a humidity control unit (HCU). Removing the moisture lowers the humidity, thereby minimizing mold risk. With an HCU, fresh air is treated and dehumidified with the use of waste heat from the refrigeration circuit for energy savings.

Staying Vigilant: Preventing Mold While School’s Out

Since there are large spans of time in which schools are empty, these spaces could be a breeding ground for mold. That is why it is so important to be vigilant about prevention. The most important thing is to control humidity with a dehumidification plan. Additionally, there needs to be a strategy for HVAC maintenance.

For humidity control, the Environmental Protection Agency (EPA) states that relative humidity should be below 60% and ideally between 30-50%. To attain those levels, facility managers will need to consider cooling and desiccant dehumidification to control dew point temperatures. This can be achieved with an HCU to ensure air quality stays good and mold doesn’t grow.

If the HVAC system isn’t in use while the building is dormant, it could be a place for microbial growth. Thus, it’s necessary to have a maintenance plan to include cleaning the indoor and outdoor coils. It’s also a good idea to clean the condensate trap and do an inspection of all the other parts including filters, belts, motors, and bearings.

Taking these measures during summer break could be the difference between a safe environment and a moldy one.

Commercial HVAC vs. Temporary Equipment

When compared to traditional equipment, an HCU is a far less costly alternative for mold remediation efforts:

Comparison Parameters:

  • One-month/28 days use
  • 70,000 square foot building with 15-foot ceilings

HVAC Numbers:

  • 400 Ton Chiller – 800 amps = 640 Kilowatts
  • $.09/Kilowatt Hour = $57.60/hour
  • 24 Hour Operation = $1,382.40/Day
  • 1 Month/28 Days = $38,707.20

HCU Numbers:

  • Rental Rate = $20,766.00/month
  • 240 amps = 192 Kilowatts.
  • $.09/Kilowatt Hour = $17.28/Hour
  • 24 Hour Operation = $414.72/Day
  • 1 Month/28 Days = $11,612.16 + $20,766.00/Rental = $32,378.16

Total savings: $6,329

Find the Right Temporary Climate Control Solution with Polygon

Controlling temperatures year-round at schools and universities is vital to an academic organization’s ability to prevent and remediate mold. Realize the ultimate protection by partnering with Polygon. The modern and advanced HCUs used by Polygon in prohibiting mold growth or quickly treating it reduce energy costs, improve IAQ (indoor air quality), and decrease mold risk by keeping moisture in check. Further, an HCU from Polygon:

  • Requires no painting
  • Offers built-in digital controls for easy use
  • Provides either hard-wired or wireless monitoring
  • Delivers easy retrofitting
  • Is ETL listed (UL) and CE registered

With reduced building moisture, mold has fewer chances to form. Using Polygon equipment as a first defense could save your campus a significant amount of money, time, and resources.

Learn more about our temporary climate solutions for schools today.

Polygon

Part of this channel

Polygon

Interior climate control and remediation for commercial property teams.

Visit the channel

Your experts belong here

Every story in MarketScale Education Technology starts with a company putting its implementation leads, instructional designers, and district partners on the record. Buyers are already reading this topic. The only question is whose experts they find.

Procurement teams read long before they ever call, and your implementers get to answer their questions first.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Education Technology, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Education Technology: are you visible to AI?

Before they reach out, Education Technology buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Education Technology expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your implementation leads, instructional designers, and district partners into the articles, video, and social content Education Technology buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Education Technology Insights

Ball State's 36 new Corsair PCs are built for esports and creative software

Ball State's 36 new Corsair PCs are built for esports and creative software

Corsair supplied Ball State University's Esports Center with 36 PCs, each with an Nvidia GeForce RTX 5070 Ti graphics card, 64 GB of memory and a 320 Hz display. The spec serves two kinds of users. Memory sized for Maya and Unreal Engine sits beside displays built for competitive play. Ball State says the upgrade gives students access to technology used in media production, animation and game development.

  • 01For a shared esports and media lab, let the heaviest course software set memory, and esports needs set the display and GPU.
  • 02Ball State expects its largest esports participation in 2026-27 since the program’s first year, and that count is the next test of demand.

Oct 31, 2026

More EdTech companies are changing hands, at lower prices

More EdTech companies are changing hands, at lower prices

Edtech acquisitions reached 149 through August 2026, with four months of the year still to go. In Berkery Noyes’ data, the median disclosed revenue multiple fell from 2.3x to 1.3x, though deals above $160 million carried a median 5.9x in its historical sample.

  • 01Corum Group counted 149 edtech acquisitions through August 2026, and Berkery Noyes’ data shows the median disclosed revenue multiple dropped from 2.3x in the second half of 2025 to 1.3x in the first half of 2026.
  • 02Only 9% of deals disclose terms, so the number to watch is whether disclosed deal value starts rising alongside deal count or stays near $6.5 billion.

Oct 30, 2026

A $4 billion repair backlog will now shape Louisiana's college building budgets

A $4 billion repair backlog will now shape Louisiana's college building budgets

A Gordian assessment prepared for the Board of Regents puts the deferred maintenance backlog at Louisiana's public colleges at $4 billion. Buildings in the LSU and University of Louisiana systems average 64 years old, compared with 53 years for the community and technical colleges. Those findings now sit alongside a $1.25 billion capital request covering 73 projects.

  • 01Louisiana's state buildings are 70% concentrated on public postsecondary campuses, making higher education the primary owner of state-owned facility inventory.
  • 02The University of Louisiana System has the largest share of highest-risk buildings (over 50 years old) at 35%, while the community and technical college system leads in low-risk buildings at 22%.
  • 03The $1.25 billion capital outlay request covers 73 construction projects but measures construction and new work, not the $4 billion deferred maintenance backlog, representing different funding categories.

Oct 29, 2026

Explore More Education Technology Insights

Read more expert perspectives from across Education Technology.

Browse Education Technology Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Education Technology and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512