Skip to content
MarketScale

Energy · Topic

Infrastructure

30 articles from Energy practitioners

AI data centers are cementing natural gas as the U.S. grid's indispensable fuel

AI data centers are cementing natural gas as the U.S. grid's indispensable fuel

Rising AI power demand is reinforcing natural gas's grip on U.S. electricity, with nearly 2,000 gas plants and 3 million miles of pipelines too embedded to disp

MarketScale Newsroom·Aug 18, 2026
AI data center demand is forcing a rethink of every power asset on the US grid

AI data center demand is forcing a rethink of every power asset on the US grid

Soaring electricity demand from AI data centers is reviving shuttered plants and spawning record-scale solar projects, but grid buildout costs keep climbing.

MarketScale Newsroom·Aug 16, 2026
The grid investment surge of 2026 is reshaping what utility operators must evaluate now

The grid investment surge of 2026 is reshaping what utility operators must evaluate now

From a $1B home battery raise to a $510M Mexican wind project, capital is flowing fast into grid infrastructure, and operators need to know where it lands.

MarketScale Newsroom·Aug 16, 2026
Transmission congestion cost the US grid $12B in 2024, and Texas's data center freeze is making the bottleneck worse

Transmission congestion cost the US grid $12B in 2024, and Texas's data center freeze is making the bottleneck worse

DOE's draft National Transmission Needs Study puts a $12B price tag on grid congestion while Texas halts data center interconnections amid a 474-GW queue.

MarketScale Newsroom·Aug 16, 2026
Shandong HiTHIUM's first LDES integrated industrial park enters production as grid-edge investment accelerates

Shandong HiTHIUM's first LDES integrated industrial park enters production as grid-edge investment accelerates

HiTHIUM's Heze Base goes live, ConnectDER closes a $35M Series D, and Duke Energy rolls out heat-season demand tools, all signals for utility operators.

MarketScale Newsroom·Aug 15, 2026
The NextEra-Dominion mega-merger and a natural gas overbuild risk are reshaping how utilities plan for data center demand

The NextEra-Dominion mega-merger and a natural gas overbuild risk are reshaping how utilities plan for data center demand

NextEra and Dominion's merger could create the world's largest regulated utility by 2027, even as analysts warn gas overbuilds may strand costs on ratepayers.

MarketScale Newsroom·Aug 14, 2026
Grid modernization and defense contracts are reshaping how energy infrastructure operators deploy capital in 2026

Grid modernization and defense contracts are reshaping how energy infrastructure operators deploy capital in 2026

From DARPA atomic clocks to 297 MWh battery storage deals, the energy and utility sector is directing fresh capital toward precision infrastructure.

MarketScale Newsroom·Aug 13, 2026
Europe's summer heatwave is forcing simultaneous power crises across Italy, Hungary, and France

Europe's summer heatwave is forcing simultaneous power crises across Italy, Hungary, and France

Heatwave stress is hitting European power grids from multiple directions at once, straining procurement teams reliant on stable wholesale electricity prices.

MarketScale Newsroom·Aug 12, 2026
Most organizations are still in AI's early stages, and the gap between adoption and impact is widening

Most organizations are still in AI's early stages, and the gap between adoption and impact is widening

McKinsey and BloombergNEF research signals that AI transformation demands change leadership and massive infrastructure investment, not just tool deployment.

MarketScale Newsroom·Aug 12, 2026
Data center energy demand is forcing a redesign of power grids, and emerging markets like Andhra Pradesh are already building the institutions to manage it

Data center energy demand is forcing a redesign of power grids, and emerging markets like Andhra Pradesh are already building the institutions to manage it

Global data center spending could hit $7 trillion by 2030. Here's how grid operators and state utilities are structuring for what comes next.

MarketScale Newsroom·Aug 11, 2026
Rolls-Royce reports 50%-plus order surge in data center energy as AI infrastructure demand reshapes power procurement

Rolls-Royce reports 50%-plus order surge in data center energy as AI infrastructure demand reshapes power procurement

Rolls-Royce's data center energy orders jumped over 50% in H1 2026, while AI-native platforms are entering renewable and battery R&D workflows at scale.

MarketScale Newsroom·Aug 11, 2026
Dominion's 53.8 GW data center backlog and a $66.8B merger make it the utility to watch in 2026

Dominion's 53.8 GW data center backlog and a $66.8B merger make it the utility to watch in 2026

Dominion Energy beat Q2 estimates on surging data center demand, while its pending $66.8B merger with NextEra advances toward a 2027 close.

MarketScale Newsroom·Aug 9, 2026
Utilities are committing $1.1T over five years as heat stress reshapes electricity demand

Utilities are committing $1.1T over five years as heat stress reshapes electricity demand

Surging heat stress and population growth are forcing a $1.1T utility infrastructure overhaul, with $208B earmarked for 2025 alone.

MarketScale Newsroom·Aug 4, 2026
Westinghouse files for IPO as utilities race to lock in nuclear, coal, and data-centre power capacity

Westinghouse files for IPO as utilities race to lock in nuclear, coal, and data-centre power capacity

A burst of utility-sector deals in late July 2026 signals that enterprise energy procurement teams face tightening supply across nuclear, coal, and grid infrast

MarketScale Newsroom·Aug 1, 2026
Heat stress is expanding faster than utility grids can keep up, and the investment gap is widening

Heat stress is expanding faster than utility grids can keep up, and the investment gap is widening

A Nature study finds some regions now endure 50 more heat stress days per year, while U.S. utilities plan $1.1T in grid investment over five years to meet surgi

MarketScale Newsroom·Jul 25, 2026
Utilities set to spend $1.1T on grid infrastructure as electrification drives five-year investment surge

Utilities set to spend $1.1T on grid infrastructure as electrification drives five-year investment surge

The Edison Electric Institute projects utilities will pour $208B into the grid in 2025, part of a $1.1T five-year build-out driven by surging electrification de

MarketScale Newsroom·Jul 23, 2026
Utilities face a $240 billion capital squeeze as affordability pressure mounts

Utilities face a $240 billion capital squeeze as affordability pressure mounts

Fitch downgraded the utility sector outlook while EY flags record investment needs — leaving operators caught between surging demand and rate recovery risk.

MarketScale Newsroom·Jul 22, 2026
Electrification hits enterprise scale: EV freight corridors, battery swaps, and the UK's petrol car tipping point

Electrification hits enterprise scale: EV freight corridors, battery swaps, and the UK's petrol car tipping point

EVs outsell petrol cars in the UK, a 1,200-km zero-emission freight corridor launches in Colombia, and CATL targets 300,000 trucks across Europe.

MarketScale Newsroom·Jul 21, 2026
Grid energy in 2026: connection backlogs, AI load growth, and the infrastructure race reshaping enterprise power

Grid energy in 2026: connection backlogs, AI load growth, and the infrastructure race reshaping enterprise power

From $3.17T in global clean energy investment to 14-year data center connection waits, grid constraints are now the defining operational risk for energy buyers.

MarketScale Newsroom·Jul 21, 2026
Microsoft-commissioned report finds three soft barriers slowing AI adoption across Australia's electricity grid

Microsoft-commissioned report finds three soft barriers slowing AI adoption across Australia's electricity grid

A Mandala report commissioned by Microsoft identifies strategic, investment, and data fragmentation barriers holding back AI deployment in Australia's rapidly c

MarketScale Newsroom·Jul 16, 2026
Utilities set to invest $1.1 trillion in grid infrastructure as electrification accelerates

Utilities set to invest $1.1 trillion in grid infrastructure as electrification accelerates

U.S. utilities are committing $208B in 2026 grid investment, part of a $1.1T five-year buildout that will reshape procurement and operations planning.

MarketScale Newsroom·Jul 15, 2026
Philippines raises renewable energy target to 50% by 2030, signaling major grid shift for industrial operators

Philippines raises renewable energy target to 50% by 2030, signaling major grid shift for industrial operators

The Philippine DOE has lifted its renewable energy target to 50% of the power mix by 2030, with direct implications for energy procurement and grid planning.

MarketScale Newsroom·Jul 14, 2026
Cornerstone Energy's 4th Annual Forum puts New England grid reliability front and center

Cornerstone Energy's 4th Annual Forum puts New England grid reliability front and center

Utility leaders, engineers, and regulators gathered at the Energy Transition Forum to tackle winter reliability, decarbonization mandates, and grid planning.

MarketScale Newsroom·Jul 14, 2026
$1.1 trillion in grid investment and AI data centers still face decade-long connection waits

$1.1 trillion in grid investment and AI data centers still face decade-long connection waits

Utilities plan $208B in grid spending in 2025 alone, yet data centers in Northern Virginia can wait 14 years for a grid connection.

MarketScale Newsroom·Jul 13, 2026
Energy transition market reaches $3.17 trillion in 2026 as grid connection backlogs stall 1,650 GW of capacity

Energy transition market reaches $3.17 trillion in 2026 as grid connection backlogs stall 1,650 GW of capacity

The global energy transition market hits $3.17T in 2026, but 1,650 GW of renewable capacity sits in grid connection queues worldwide.

MarketScale Newsroom·Jul 12, 2026
Energy transition market approaches $3.2 trillion in 2026 as grid bottlenecks emerge as the critical constraint

Energy transition market approaches $3.2 trillion in 2026 as grid bottlenecks emerge as the critical constraint

The global energy transition market hits $3.17T this year, growing at 11.1% CAGR, but 1,650 GW of renewable capacity is stuck waiting for grid connections.

MarketScale Newsroom·Jul 12, 2026
Blackstone acquires Dresser Utility Solutions to accelerate gas and water infrastructure modernization

Blackstone acquires Dresser Utility Solutions to accelerate gas and water infrastructure modernization

Blackstone Energy Transition Partners is buying Dresser Utility Solutions from First Reserve, backing the 146-year-old metering and control equipment maker's ne

MarketScale Newsroom·Jul 12, 2026
DC traction substations are becoming the new hub for EV charging and renewable integration

DC traction substations are becoming the new hub for EV charging and renewable integration

Staged modernization of DC traction grids can deliver 10–20% ROI by adding EV charging, storage, and renewables to existing substation infrastructure.

MarketScale Newsroom·Jul 10, 2026
Energy infrastructure roundup: Gas for data centers, BESS buildout, and Canada's Pacific pipeline

Energy infrastructure roundup: Gas for data centers, BESS buildout, and Canada's Pacific pipeline

74 US gas plants, 143 GW targeted at data centers; BESS deals stack up in Romania, Australia, and Poland; Canada greenlights Pacific oil corridor.

MarketScale Newsroom·Jul 10, 2026
DOE geothermal funding and energy workforce strategy signal new demands for operators

DOE geothermal funding and energy workforce strategy signal new demands for operators

The DOE has committed $171.5M to geothermal expansion and published an 8-principle workforce framework targeting millions of new energy jobs.

MarketScale Newsroom·Jul 8, 2026
← All Energy articles

Follow Energy Insights

Get new expert content in your inbox.

Free workspace

Every article here started as someone's expertise. Yours qualifies.

This coverage is produced through MarketScale with companies across Energy. The same platform turns your field engineers, operations leads, and project developers into the coverage buyers on this page are reading. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system