Skip to content
MarketScale

Engineering & Construction · Topic

Cooling Systems

6 articles from Engineering & Construction practitioners

The Unsung Heroes of Data Centers: Industrial Control Panels

The Unsung Heroes of Data Centers: Industrial Control Panels

In the high-tech world of data centers—where petabytes of data flow every second and uptime is measured in milliseconds—there’s a quiet, powerful force working behind the scenes: industrial control panels. While servers and switches often steal the spotlight, control panels are the backbone that keeps the entire facility running safely, efficiently, and reliably. Powering the…

Kasa·Apr 8, 2026
Power, Cooling, and Risk: What It Takes to Bring a 100MW AI Data Center Online

Power, Cooling, and Risk: What It Takes to Bring a 100MW AI Data Center Online

The industry knows how to build data centers. What it’s still figuring out is how to turn on AI factories at scale. With facilities now crossing 100 megawatts—far beyond the 5 to 10 megawatt norm of traditional builds—operators are no longer just validating equipment. They’re testing whether entire systems—power, cooling, controls, and the teams behind…

Applied Digital·Mar 28, 2026
Execution at Scale: How Applied Digital Is Powering AI Infrastructure in Ellendale

Execution at Scale: How Applied Digital Is Powering AI Infrastructure in Ellendale

AI infrastructure is evolving at breakneck speed, and the real challenge is no longer just designing next-generation data centers—it’s executing them at scale. As demand for AI-ready facilities grows, operators must adapt to immense increases in power density, new cooling technologies, and unconventional deployment locations. Power density requirements for AI workloads are pushing the…

Software And Technology·Jul 18, 2025
Applied Digital Ellendale AI Data Center: January 2025 Update

Applied Digital Ellendale AI Data Center: January 2025 Update

Cooling systems and network infrastructure near completion as the facility advances toward full operational capacity

Applied Digital·Feb 20, 2025
September 2024 Update on Applied Digital’s Cutting-Edge Ellendale AI Data Center

September 2024 Update on Applied Digital’s Cutting-Edge Ellendale AI Data Center

A 363,000 square-foot AI data center in North Dakota reveals how enterprises are building infrastructure to power next-generation computing demands

Software And Technology·Oct 3, 2024
Applied Digital’s Ellendale AI Data Center: Pioneering the Future of Accelerated AI Computing in North Dakota

Applied Digital’s Ellendale AI Data Center: Pioneering the Future of Accelerated AI Computing in North Dakota

A 363,000-square-foot North Dakota facility sets new standards for powering the next generation of AI workloads at massive scale

Applied Digital·Jun 29, 2024
← All Engineering & Construction articles