Engineering & Construction · Topic
Ai Data Center
30 articles from Engineering & Construction practitioners
Simplifying AI Infrastructure: From Data Center to Deployment (Part 1)
In this episode of the Flawless Execution podcast, Jeff Hudgins, VP of Global Services at UNICOM Engineering, breaks down the real-world challenges of deploying AI infrastructure at scale. As AI moves from one-off builds to repeatable global deployments, OEMs, ISVs, and enterprises face increasing complexity across design, integration, cooling, logistics, and installation. Jeff discusses how…
Smart Control Panels Are Powering the Backbone of AI!
The AI Boom Is Fueling Data Center Growth — And Smart Control Panels Are Powering the Backbone As artificial intelligence continues to revolutionize industries—from finance and healthcare to manufacturing and logistics—the demand for data processing power has exploded. At the heart of this digital transformation lies the modern data center: a complex, high-density environment that…
Power, Cooling, and Risk: What It Takes to Bring a 100MW AI Data Center Online
The industry knows how to build data centers. What it’s still figuring out is how to turn on AI factories at scale. With facilities now crossing 100 megawatts—far beyond the 5 to 10 megawatt norm of traditional builds—operators are no longer just validating equipment. They’re testing whether entire systems—power, cooling, controls, and the teams behind…
The Next Data Center Bottleneck Isn’t Power or Cooling — It’s People: The Data Center Workforce
With the rapid rise of AI workloads, data centers are being built with higher power density, stricter reliability expectations, and cooling technologies that are evolving faster than most teams can adapt. As a result, these facilities aren’t just getting bigger—they’re becoming harder to operate, harder to staff, and far less forgiving when something goes…
AI Is Forcing a Rethink of Data Center Infrastructure at Every Level
The data center industry is being redefined by AI’s demand for faster, denser, and more scalable infrastructure. According to McKinsey, average rack power densities have more than doubled in just two years. It went from approximately 8 kW to 17 kW, and is expected to hit 30 kW by 2027. Global data center power demand is projected…
Applied Digital AI Data Center July 2025 Update
In the heart of Ellendale, North Dakota, the Applied Digital AI Data Center known as Polaris Forge 1 (Previously ELN02) is steadily emerging as one of the largest purpose-built AI data centers in the United States. This July 2025 site update highlights remarkable progress at the Applied Digital project, designed to set new standards…
Reflection and What’s Ahead: How Applied Digital Built the AI Factories of Tomorrow
As AI adoption accelerates at an unprecedented pace—ChatGPT alone sees 2.5 billion daily prompts just two and a half years after launch—digital infrastructure is racing to keep up. At the center of this transformation are purpose-built data centers, evolving from air-cooled Bitcoin facilities to liquid-cooled “AI factories” designed to power the next generation of…
Execution at Scale: How Applied Digital Is Powering AI Infrastructure in Ellendale
AI infrastructure is evolving at breakneck speed, and the real challenge is no longer just designing next-generation data centers—it’s executing them at scale. As demand for AI-ready facilities grows, operators must adapt to immense increases in power density, new cooling technologies, and unconventional deployment locations. Power density requirements for AI workloads are pushing the…
Workforce, Housing, and Growth: How Applied Digital Is Revitalizing a Rural Town Through AI Infrastructure
As AI infrastructure spreads beyond tech hubs and into America’s heartland, companies face a new imperative: not just to build facilities—but to build trust, local partnerships, and long-term value for the communities that host them. In Ellendale, North Dakota, Applied Digital’s Polaris Forge 1 campus has become a case study in what rural revitalization…
Applied Digital’s Data Center Design for a 100 MW AI Factory Built from the Ground Up
AI workloads are redefining the limits of data center design and infrastructure. Legacy data centers, built for traditional co-location, cannot handle the density, thermal demands, or power dynamics of accelerated computing. The AI boom has upended the data center sector, forcing a rapid shift to liquid-cooled racks as facilities pivot from sub-10kW racks to…
A Greener Future in HVAC: Balancing Innovation and Environmental Responsibility with Mike Donahue
In an industry grappling with unprecedented changes, from liquid cooling innovations to bridging labor gaps, the HVAC world is evolving rapidly. With sustainability and efficiency becoming central themes, it’s a critical moment for rethinking solutions and workforce development. The stakes are high—data centers alone, for instance, are expected to account for 3-4% of global…
Unveiling Innovative Training for Specialized Data Center Security
As global reliance on data centers surges, so do the demands for highly trained security personnel to protect these mission-critical infrastructures. The complexity of modern data centers—ranging from physical access requirements to AI-integrated systems—requires a new caliber of officer. According to Uptime Institute, 60% of data center outages cost more than $100,000, emphasizing the…
Applied Digital Ellendale AI Data Center: April 2025 Update
Construction momentum accelerates at this mega-scale AI facility as infrastructure systems take shape ahead of HPC deployment
Data Center Construction Demands Are Surging But Power, Permitting, and Planning Are Holding It Back
The infrastructure race to support AI is exposing critical gaps in power supply, regulatory approval, and workforce availability
NVIDIA GTC 2025 Puts AI Infrastructure in the Spotlight and Applied Digital Delivers
The race to build AI's backbone reveals why data center innovation matters more than the models themselves
Applied Digital Ellendale AI Data Center: February 2025 Update
The data center reaches a critical milestone as its first computing cluster comes online to handle AI and HPC workloads
Applied Digital Ellendale AI Data Center: January 2025 Update
Cooling systems and network infrastructure near completion as the facility advances toward full operational capacity
Applied Digital: Fuelling Innovation through High-Performance Computing and AI Cloud Services
The infrastructure provider bridges the gap between enterprise computing demands and next-generation AI capabilities through specialized datacenter and GPU clou
Applied Digital Ellendale AI Data Center: November 2024 Update
Major infrastructure milestones bring North Dakota's flagship AI facility closer to full operational capacity
The Future of Digital Infrastructure Lies in Stability of Sustainable Technology
As global data demands explode, organizations must balance rapid innovation with the infrastructure stability required to sustain long-term growth
Sustainability and Innovation in the Data Center Industry: Insights from Rob Ussher
Data center operators are rebalancing operational demands with environmental accountability through efficiency-driven innovation
September 2024 Update on Applied Digital’s Cutting-Edge Ellendale AI Data Center
A 363,000 square-foot AI data center in North Dakota reveals how enterprises are building infrastructure to power next-generation computing demands
Designing Sustainable and Scalable Data Centers for the AI Revolution
Building the cooling and energy infrastructure required to power the next generation of AI without breaking environmental commitments
Ellendale AI Data Center Construction Update for July 2024
A North Dakota facility is redefining what modern AI infrastructure looks like as construction accelerates toward completion
Applied Digital’s Ellendale AI Data Center: Pioneering the Future of Accelerated AI Computing in North Dakota
A 363,000-square-foot North Dakota facility sets new standards for powering the next generation of AI workloads at massive scale
Generative AI Demands a Complete Data Center Transformation
Companies racing to deploy generative AI are discovering that legacy infrastructure simply won't cut it anymore
Applied Digital Ready to Meet AI’s Computational Power Needs
Heavy-duty data centers are becoming the bottleneck for AI development, and one infrastructure provider is racing to solve it
The Future of Data Centers: Cooling, Power, and ESG with Saqib Ashraf
AI-driven computing demands force data centers to rethink cooling strategies while balancing power consumption and sustainability goals
Applied Digital Strengthens Community Relations through Innovative Data Center Practices
Rural communities gain economic revitalization and local investment as a major data center operator prioritizes deep community integration over extraction
Learning, Sharing, and Harmonizing with Communities are Central to the Success of Applied Digital’s Facilities
Community-specific strategies and genuine partnership prove essential for data center operators seeking sustainable facility growth