Skip to content
‹ Back to IndustriesEngineering & Construction

Top 4 Reasons Mechanical Seals Fail

The common causes of mechanical seals failuring in aerospace applications are discussed, shedding light on the potential risks and implications for programs and systems. Understanding these causes is crucial to prevent costly setbacks and ensure reliable performance. Jason Riggs, Director of Strategy at Technetics, highlights four key reasons for mechanical seals failing. First, the use…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Promoted content from Technetics Group on MarketScale.

·
Share

Free workspace

Turn your Engineering & Construction expertise into content.

Record interviews, organize footage, and write with AI on a free trial of the MarketScale platform for qualifying companies. No demo required, no credit card.

Try it Free

The common causes of mechanical seals failuring in aerospace applications are discussed, shedding light on the potential risks and implications for programs and systems. Understanding these causes is crucial to prevent costly setbacks and ensure reliable performance.

Jason Riggs, Director of Strategy at Technetics, highlights four key reasons for mechanical seals failing. First, the use of analysis techniques that generate designs that do not align with the supplier’s capabilities can lead to unexpected issues during operation. It emphasizes the importance of considering supplier capabilities and expertise when designing seals.

Second, ineffective seal designs that fail to address the specific sealing problem at hand are a significant concern. Lack of experience and pedigree in seal design can contribute to suboptimal solutions that do not meet the desired performance requirements.

The third cause of concern is not designing for environments that can lead to latent failures. Neglecting to account for the operating conditions and environmental factors that can impact seal performance can result in unforeseen failures and compromised system integrity.

Lastly, manufacturing processes or inadequate process control can hinder the production of seals that align with the analytical model. Inconsistencies between the intended design and the actual manufactured seal can introduce vulnerabilities and increase the risk of failure.

In aerospace applications, seal failures can have serious consequences. They can jeopardize qualification efforts, leading to scheduling delays and increased costs. Additionally, latent field failures can emerge, resulting in unexpected expenses and compromised system functionality. Premature seal failure can reduce the overall system life, impacting efficiency and reliability. The most concerning outcome is the potential for catastrophic failure at the component or system level, posing significant risks to safety and performance.

By understanding and addressing these causes of seal failures, aerospace programs and systems can mitigate risks and enhance their reliability. Effective process control during manufacturing is crucial to ensure that the final seals align with the intended design and analytical models.

Video TranscriptExpand ↓

Mechanical seals can fail for a variety of reasons, including analysis techniques that generate designs that don't match the supplier's capabilities. Number two, seal designs that are ineffective in solving the given sealing problem. Usually due to a lack of experience in pedigree, Number three, not designing for environments that can lead to latent failures. And number four, manufacturing processes or process control roles incapable of producing a seal that mirrors the analytical model. In an aerospace application, these seal's failures can be significant and can result in failed qualification efforts, which can put a program in significant scheduling cost risk. Number two, latent field failures that can lead to cost and failure deletations. Number three, reduce system life due to premature seal failure. And most concerning, number four, potential catastrophic failure at the component or system level.

Technetics Group

Part of this channel

Technetics Group

Engineered seals and components for semiconductor, aerospace, and nuclear.

Visit the channel

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Book DemoSee how it works15 minutes, straight to a calendar.
B2B Weekly

The week in Engineering & Construction, and sixteen other industries, every Monday.

Ten stories, one-line takes, five minutes. Free.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. Explore how your experts, customers, and partners can become useful content for buyers and AI search.

Free Trial

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Start a free trial and see it with your own people. For qualifying companies, no credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What your free trial includes

Hands-on access to the MarketScale platform
Media requests to your crowd, remote recording, AI writing tools
No demo required. No credit card.
For qualifying companies. Company confirmation required.

More Engineering & Construction Insights

Bain Capital's reported $250M minority investment values construction platform Kahua above $1B

Bain Capital's reported $250M minority investment values construction platform Kahua above $1B

Bain Capital's Tech Opportunities fund is putting a reported $250 million into Kahua at a valuation above $1 billion. The deal follows what Kahua says is $100 million in annualized revenue. The bet rests on owner-side program data, with AI features the next sign to watch for hospitals, ports and school builders.

  • 01Kahua is selling AI on the strength of the governed data owners already keep in it. That makes data quality and permissions the place to test any new AI feature it ships.

Oct 1, 2026

Element’s Charlotte lab makes tensile specimens from turbine blade roots

Element’s Charlotte lab makes tensile specimens from turbine blade roots

Element Materials Technology’s Charlotte lab wire-EDMs one-eighth-inch cylinders from the root of a turbine blade and low-stress grinds them into tensile specimens—work value stream manager Daniel Steele says he’s not aware other labs do at this size. The lab, which invested $3.2 million in 2019 according to Aerospace Manufacturing and Design, is adding creep and stress rupture frames under a lease signed in January.

  • 01The extraction know-how has a paper trail: Aerospace Manufacturing and Design reported in March 2019 that Element’s $3.2 million Charlotte investment included EDM plunge machines—and that Charlotte was the first Element lab to install them for extracting cylindrical specimen blanks.
  • 02Deloitte's November 2025 outlook put manufacturing construction spending down 7% year over year by July 2025, so a lab adding floor space and creep frames is growing inside one of the few pockets Deloitte flagged for expansion.

Sep 30, 2026

NMHC survey: 37% raised pricing on projects on hold

NMHC survey: 37% raised pricing on projects on hold

NMHC's September construction survey found 37% of respondents repriced shelved projects upward, versus 17% in June. Starts slowed too: 29% of firms started fewer projects, and a growing share saw labor and material costs outrun inflation.

  • 01Upward repricing of projects held three to six months rose from 17% of survey respondents in June to 37% in September, while downward repricing fell from 38% to 14%.

Sep 28, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a Demo

Or call us. No forms required. We pick up. 214-945-2512