Skip to content
MarketScale
‹ Back to IndustriesEngineering & Construction

Talking Shop With Internet Influencers Part 2

There are over 51 million YouTube channels out there; with so many, it’s hard to set yourself apart from others. So, how do successful YouTube influencers not only survive, but thrive in the industry amidst the sea of channels? On part two of this episode of Talkin’ Shop with Walbro, Host Michelle Dawn Mooney speaks…

This story was produced through MarketScale. See how Engineering & Construction teams put it to work with Partner & Channel Enablement.

Promoted content from Walbro on MarketScale.

Share
Talking Shop With Internet Influencers Part 2

Get featured

Want to get featured in MarketScale Engineering & Construction?

Create a free MarketScale workspace and get your company's expertise featured across our Engineering & Construction coverage. No credit card, no demo required.

Request an invite

There are over 51 million YouTube channels out there; with so many, it’s hard to set yourself apart from others.

So, how do successful YouTube influencers not only survive, but thrive in the industry amidst the sea of channels?

On part two of this episode of Talkin’ Shop with Walbro, Host Michelle Dawn Mooney speaks with @Donyboy73 (Don), creator of his channel, “Don the Small Engine Doctor,” @StevesSmallEngineSaloon (Steve), who created “Steve’s Small Engine Saloon” channel, and @Chickanic (Bre) to discuss their paths to becoming YouTube Influencers and how they each manage their content creation.

Mooney, @Donyboy73, @StevesSmallEngineSaloon, and @Chickanic also discussed…

  1. How they got hooked into YouTube content creation for their respective channels based on their areas of expertise
  2. Inspirational sources for their content creation
  3. How to find shop locations and future plans for building and location changes

@Donyboy73 explained how content creation works as one gains experience. “You actually never hit a wall. I think at the beginning, when you start YouTube, you might think that ‘At some point, I’m going to run out of ideas.’ But the more you do it, the more ideas you have, that you actually don’t have time to do them all.”

@Chicanic explained how much work goes into creating one video outside of her full-time shop job. “If I’m actually repairing something, it could be two to five hours and that’s after work and I’m really bad about waiting until the last minute so as soon as I film something, I edit it and put it out there the next day…so two to five hours of filming and then at least three hours of editing, creating a thumbnail, getting it uploaded…”

“I do repairs for family and friends and the occasional family friend and I get some of those where I can do a video on them but other than that, just comments and emails and also on my website…there’s a tab there where you can put your video suggestions in,” @StevesSmallEngineSaloon touched on his content creation methods, because unlike @Donyboy73 and @Chickanic, he does not have a working shop.

@Chicanic is a YouTube content creator who took two years of small engine repair in college and worked at a small engine shop afterward. She and her husband own a small engine shop in Arkansas and her goal with content creation is to help viewers save time, money, and frustration.

Walbro

Part of this channel

Walbro

Fuel systems engineering content for OEM and aftermarket teams.

Visit the channel

Your experts belong here

Every story in MarketScale Engineering & Construction starts with a company putting its project engineers, superintendents, and estimators on the record. Buyers are already reading this topic. The only question is whose experts they find.

Owners shortlist firms they already trust, and your field leaders become the reason your name is on that list.

Get your team featuredSee how it works15 minutes, straight to a calendar.

Follow Engineering & Construction Insights

Get new expert content in your inbox.

Engineering & Construction: are you visible to AI?

Before they reach out, Engineering & Construction buyers ask AI engines which vendors to trust. See how AI describes your company today, and where competitors show up instead.

Free workspace

You just read one Engineering & Construction expert. Your company is full of them.

This article was produced through MarketScale. The same platform turns your project engineers, superintendents, and estimators into the articles, video, and social content Engineering & Construction buyers are searching for. Create a free workspace and see it with your own people. No credit card, no demo required.

NPS +73 · 1,000+ creators · 38+ countries

What you get, free

Your own MarketScale Studio workspace
One video edit a month, on us
AI writing, editing, and publishing tools
In-platform coaching to learn the system

More Engineering & Construction Insights

HUD’s 24-month mass timber modular project goes after the cost driver: shipping the modules

HUD’s 24-month mass timber modular project goes after the cost driver: shipping the modules

HUD is funding a 24-month Washington State University project to redesign modular housing modules around transport and fast site assembly. Shipping is the design constraint. A 2023 Journal of Building Engineering review of 2009–2021 modular CLT projects suggests faster construction timelines, but logistics choices still decide feasibility.

  • 01In modular housing, transportation is becoming a first-order engineering spec, the module that is cheapest to build can still be the most expensive to move.
  • 02For owners in seismic regions or temporary housing programs, the choice between 2D and 3D modular CLT approaches can trade longer-haul transportability against assembly speed.

Sep 5, 2026

Insurance and moisture controls now dictate mass timber schedules

Insurance and moisture controls now dictate mass timber schedules

Mass timber can go up as little as one day per floor. But builder’s risk and property insurance can be harder to place and pricier, largely tied to moisture exposure during construction. Metropolis says mass timber is mainstreaming across North America.

  • 01The schedule advantage is real, but it is only bankable if the project has a funded moisture-control plan from mill to dry-in.
  • 02Insurance has become an early design input for mass timber, forcing owners to lock in risk controls and documentation before procurement.
  • 03For mid-rise and campus projects, mass timber’s headline benchmark is cycle time per floor, which shifts schedule risk onto crane picks, staging, moisture protection, and inspection windows.

Sep 5, 2026

Dallas is still building big, but U.S. apartment deliveries fell 41%

Dallas is still building big, but U.S. apartment deliveries fell 41%

Apartment deliveries in the U.S. decreased by 41% in the first half of 2026, according to Yardi Matrix data. Despite this national trend, Dallas/Fort Worth led in both multifamily and industrial deliveries.

  • 01Apartment deliveries in the U.S. dropped 41% in H1 2026.
  • 02Dallas/Fort Worth led the nation in multifamily and industrial deliveries.

Aug 29, 2026

Explore More Engineering & Construction Insights

Read more expert perspectives from across Engineering & Construction.

Browse Engineering & Construction Hub

For B2B teams

Your experts could be publishing here

Stories like this one run on content MarketScale captures from real practitioners. See how your team's expertise becomes coverage in Engineering & Construction and beyond.

Book a 15-minute demo

Or call us. No forms required. We pick up. 214-945-2512